CyberPower CPSHB300ETR User Manual

Page 1
User’s Manual
CPSHB300ETR
Cyber Power Systems, Inc.
Page 2
Page 3
Contents
1 Information on this Manual ....................................................................................................... 1
1.1 Validity .............................................................................................................................. 1
1.2 Target Group ...................................................................................................................... 1
1.3 Symbols Used..................................................................................................................... 1
2 Safety ...................................................................................................................................... 2
2.1 Intended Use ..................................................................................................................... 2
2.2 Safety Precautions ............................................................................................................. 2
2.3 Assembly Warnings ............................................................................................................ 3
2.4 Electrical Connection Warnings .......................................................................................... 4
2.5 Operation Warnings ........................................................................................................... 4
2.6 Symbols on the Inverter ..................................................................................................... 5
3 Product Description ................................................................................................................. 6
3.1 CPS Hybrid PV Inverter Overview........................................................................................ 6
3.2 Size and Weight .................................................................................................................. 6
3.3 Transportation ................................................................................................................... 7
3.4 Storage of Inverter ............................................................................................................. 7
3.5 The Advantage of CPS Hybrid PV Inverters .......................................................................... 7
4 Unpacking ............................................................................................................................... 8
5 Installation .............................................................................................................................. 9
5.1 Safety Instruction ............................................................................................................... 9
5.2 Selecting the Installation Location ...................................................................................... 9
5.3 Electrical Connections ...................................................................................................... 10
5.3.1 Safety............................................................................................................................ 10
5.3.2 Wiring PV Input ............................................................................................................. 10
5.3.3 Wiring External Battery Input ........................................................................................ 11
5.3.4 Wiring AC Output .......................................................................................................... 13
6 Commissioning ...................................................................................................................... 13
Page 4
6.1 Commission the Inverter .................................................................................................. 13
6.2 Operation Modes ............................................................................................................. 14
6.3 Charge Current Setting ..................................................................................................... 15
6.4 LEDs Indicators ................................................................................................................. 16
7 Start-up and Shut-down the Inverter ..................................................................................... 19
7.1 Start-up the Inverter for On Grid Operation ...................................................................... 19
7.2 USB Charger Only ............................................................................................................ 19
7.3 Start-up the Inverter for Off Grid Operation ..................................................................... 19
7.4 Shut-down the Inverter .................................................................................................... 20
8 Maintenance ......................................................................................................................... 21
8.1 Replace the Internal Batteries .......................................................................................... 21
8.2 Replace the Fuse .............................................................................................................. 22
9 Decommissioning .................................................................................................................... 23
9.1 Dismantling the Inverter................................................................................................... 23
9.2 Packing the Inverter ......................................................................................................... 23
9.3 Disposing of the Inverter .................................................................................................. 23
10 Specification .......................................................................................................................... 24
10.1 Specification of CPSHB300ETR ........................................................................................ 24
10.2 Torque Values ................................................................................................................. 25
11 Contacts ................................................................................................................................ 26
Page 5
Table of Figures
Fig. 2-1 Energy storage system .............................................................................................................. 2
Fig. 3-1 Layout of CPSHB300ETR ........................................................................................................... 6
Fig. 3-2 Dimensions of CPSHB300ETR .................................................................................................... 7
Fig. 4-1 Components included in the scope of deliver ............................................................................ 8
Fig. 5-1 Permitted and prohibited installation positions ....................................................................... 10
Fig. 5-2 Clearance space for installation ............................................................................................... 10
Fig. 5-3 Grid output and standalone output connections ...................................................................... 11
Fig. 5-4 Connect PV connectors to inverter ........................................................................................... 12
Fig. 5-5 The location of extended battery connector ............................................................................. 13
Fig. 7-1 Power flow of On-Grid operation ............................................................................................. 19
Fig. 7-2 Power flow of Off-Grid operation ............................................................................................ 20
Fig. 8-1 Procedure of replacing batteries .............................................................................................. 21
Fig. 8-2 Grid O/P fuse replacement ...................................................................................................... 22
Page 6
Table of Figures
Table 6-1 Charge current setting ........................................................................................................ 15
Table 6-2 LEDs indicators for On Grid operation ................................................................................. 16
Table 6-3 LEDs indicators for Off Grid operation ................................................................................. 17
Table 10-1 Specification .................................................................................................................... 24
Table 10-2 Torque values ................................................................................................................... 25
Page 7
1 Information on this Manual
1.1 Validity
This installation guide contains installation, commissioning, basic troubleshooting and tech-support contact information regarding CyberPower’s CPS Hybrid PV inverter CPSHB300ETR
Using this guide, users will be able to install and operate the inverter rather easily. This manual does not cover any details regarding equipment connected to the inverter.
1.2 Target Group
This manual is most suitable for users who have basic knowledge around electricity and electrical devices. Note: CyberPower Systems, Inc. will not inform users for any changes taken place within this guide.
1.3 Symbols Used
The following types of safety instructions and general information appear within this document:
Symbol Description
DANGER indicates a hazardous situation which, if not avoided, will result in death or serious injury.
WARNING indicates a hazardous situation which, if not avoided, can result in death or serious injury.
CAUTION indicates a hazardous situation which, if not avoided, can result in minor or moderate injury.
NOTICE indicates a situation which, if not avoided, could result in
property damage.
Information that you
must read and know to ensure optimal
operation of the system.
DANGER
!
WARNING
!
CAUTION
!
NOTICE
!
i
Information
User Manual 1 Hybrid CPSHB300ETR
Page 8
2 Safety
2.1 Intended Use
The CPS Hybrid PV inverter can be used to converter photovoltaic energy to battery and/or to balance the attached load power. Please note, that charging the batteries takes presidency over all other functions! It can supply power to appliances when public grid is not available. The unit contains 2 x 12V/9Ah Sealed Lead Acid batteries in 24VDC configuration that can be expanded through the use of an external battery ar ray. It also has a built-in USB charger that provides 2ports with 2A totally maximum, able to charge connected 5VDC USB devices, such as Smart Phones, Tablets, Cameras, etc.
Hybrid Energy Storage System Overview:
PV Module
Electrical Grid
Appliances
(Emergency usage)
Multiple charge, 5V/2A
(2A max for each USB and total)
CPSHB300ETR
Optional external battery
VRLA, 24V (12V*2)
Fig. 2-1 Energy storage system
Like the above drawing indicates, a complete energy storage system consists of PV module, CPS hybrid PV inverter, public grid and other components.
2.2 Safety Precautions
The CPS hybrid series is designed and tested according to international safety requirements; however, certain safety precautions must be observed when installing and operating this inverter. Read and follow all
instructions, cautions and warnings in this installation manual.
User Manual 2 Hybrid CPSHB300ETR
Page 9
2.3 Assembly Warnings
Prior to installation, inspect the unit to ensure absence of any transport or handling damage, which could affect insulation integrity or safety clearances; failure to do so could result in
safety hazards.
Unauthorized
removal of necessary protections, improper use,
incorrect installation and operation may lead to serious safety, shock hazards or equipment damage.
In order to minimize the potential of a shock hazard due to
hazardous voltages, cover the entire solar array
with dark
material prior to connecting the array to any equipment.
Grounding the PV modules: Comply with the local requirements for grounding the PV modules and the PV generator. CyberPower recommends connecting the generator frame and other electrically conductive surfaces in a manner which ensures continuous conduction and ground these in order to have optimal protection of the system and personnel.
WARNING
!
CAUTION
!
User Manual 3 Hybrid CPSHB300ETR
Page 10
2.4 Electrical Connection Warnings
2.5 Operation Warnings
Make all electrical connections (e.g. conductor
termination, fuses, PE connection, etc.) in accordance with prevailing regulations. When working with the inverter powered on, adhere to all prevailing safety
regulations to minimize risk of accidents.
The unit may only be operated with PV generators (modu
les and
cabling) with protective insulation. Do not connect any source of energy other than PV modules to the CPS hybrid inverter.
Systems with inverters typically require additional control (e.g.,
switches, disconnects) or protective devices (e.g., fusing circuit breakers) depending upon the prevailing safety rules.
Please read this manual carefully, the manufacturer or supplier is not
responsible for damage caused by incorrect operation
, installation,
wiring, transport, etc.
When energy flows into the
house grid through the inverter, household
devices or lighting consume that energy. Leftover energy may be fed into the
public grid. If you choose this function and indeed there is left-over power fed into the public grid, depending on your connection, th
e energy
consumption meter might be spinning backwards!
 Ensure all covers and doors are closed and secure during operation.
Although designed to meet all safety requirements, some parts and surfaces of Inverter are still hot during operation. To reduce the risk of
injury, do not touch the surfaces while Inverter is operating.
Incorrect sizing of the PV plant may result in volta
ges being present
which could destroy the inverter.
Anytime the inverter has been disconnected from the power network,
use extreme caution as some components can retain charge sufficient
to create a shock hazard; to minimize occurrence of such conditions, comply with all corresponding safety symbols and markings present on the unit and in this manual.
In special cases, there may still be interference for the specified
application area despite maintaining standardized emission limit values (e.g. when sensitive equipment is located at the setup location or when the setup location is near radio or television receivers).In this case, the
operator is obliged to take proper action to rectify the situation.
WARNING
!
CAUTION
!
WARNING
!
CAUTION
!
User Manual 4 Hybrid CPSHB300ETR
Page 11
2.6 Symbols on the Inverter
Symbol Explanation
Observe the documentation Observe all documentation supplied with product
Danger to life due to high voltage There high voltage inside the product, don’t open the enclosure or touch the live parts.
Notice Install and operate the product must follow the manual and instruction, incorrect installation or operation may damage the product.
Danger to life due to high voltage Prior to performing any work on the product, always disconnect it from all sources and wait for 2 minutes.
Risk of burns The product’s surfaces are hot during operation. Don’t touch during operation.
Don’t dispose of the product together with the household waste. In accordance with the applicable disposal regulations for electronic waste.
User Manual 5 Hybrid CPSHB300ETR
Page 12
3 Product Description
3.1 CPS Hybrid PV Inverter Overview
A
B
C
D
E
F
G
H
I
J
Fig. 3-1 Layout of CPSHB300ETR
Position
Description
A
Handle
B Transparent Cover
C USB Charger
D LED Indicators (4 LEDs)
E Operation Button
F PV Input Connectors
G
External Battery Connector
H
AC-out Power Outlet
I
AC-in Power Outlet / GRID
J
Tool for Removing PV Connectors
3.2 Size and Weight
The dimensions of CPSHB300ETR as Fig. 3-2, the weight is 9kg includes batteries.
User Manual 6 Hybrid CPSHB300ETR
Page 13
Unit: mm
Fig. 3-2 Dimensions of CPSHB300ETR
3.3 Transportation
The inverter is thoroughly tested and inspected strictly before delivery. Our inverters leave our factory in proper electrical and mechanical condition. Special packaging ensures safe and careful transportation. However, transport damage may still occur. The shipping company is responsible in such cases. Thoroughly inspect the inverter upon delivery. Immediately notify the responsible shipping company if you discover any damage to the packaging which indicates that the inverter may have been damaged or if you discover any visible damage to the inverter. We will be glad to assist you, if required. When transporting the inverter, the original or equivalent packaging should to be used.
3.4 Storage of Inverter
If you want to storage the inverter in your warehouse, you should choose an appropriate location to store the inverter.
The unit must be stored in original package and desiccant must be left in the package. For the life and capacity of battery, the storage temperature should be always between
-10 ℃and +40
. And the storage relative humidity should be always between 0 and 95%.
After long term storage, local installer or service department of CyberPower should perform a
comprehensive test before installation
3.5 The Advantage of CPS Hybrid PV Inverters
Features of CPSHB300ETR are follows:
User friendly handle, making carrying very convenient Ver y e asy to install 2 USB charger ports with 2A maximum charging current in total *1 Extendable battery capacity
*1 High power operation can cause high temperature and influence the charging current of USB, please keep light or no power from AC-Out outlet during USB charging operation.
292
186
202
User Manual 7 Hybrid CPSHB300ETR
Page 14
4 Unpacking
Before opening packing, please note that whether there are any visible external damages. After opening packing, please check the contents for completeness and for any visible external device damages. If there are any damages, or parts missing, please contact your dealer. Complete delivery should contain the following:
A B C
Fig. 4-1 Components included in the scope of deliver
Item Quantity Description
A
1
Hybrid PV Inverter
B 1 Power cord for AC connection
C 1 User manual & Warranty Card
Even though packaging is made to be durable, please treat it gently and avoid tossing it around.
i
Information
User Manual 8 Hybrid CPSHB300ETR
Page 15
5 Installation
5.1 Safety Instruction
Danger to life due to fire or explosion
Despite careful construction, electrical devices can cause fires.Do not install the inverter on easily flammable materials and
where flammable materials are stored.
Carefully remove the unit from its packaging and inspect for external damage. If you find any
imperfections, please contact your local dealer.
The PV input interface can only be connected with PV panel(s), ant the external battery connector can
only accept SLA battery types in 24VDC configuration.
Disconnect whole connections before servicing. Do not connect this unit to an AC source or generator. When a photovoltaic panel is exposed to light, it generates a DC voltage. When connected to this
equipment, a photovoltaic panel will charge the DC link capacitors.
Energy stored in this equipment’s DC link capacitors presents a risk of electric shock. Even after the unit
is disconnected from the grid, external battery and photovoltaic panels, high voltages may still exist inside the inverter. Do not remove the casing until at least 2 minutes after disconnecting all power sources.
Although designed to meet all safety requirements, some parts and surfaces of inverter are still hot
during operation. To reduce the risk of injury, do not touch the surfaces of inverter during operation.
5.2 Selecting the Installation Location
The points below help you select a suitable installation location, thus avoiding any potential damages to both device and operators:
1) Obviously the location selected must be suitable for the inverters’ dimensions, with room to
spare.
2) Do not install the inverter on structures constructed of flammable or thermo labile materials.
3) Never install the inverter in environment of little or no air flow, nor dust environment.
4) The inverter must be installed indoors.
5) Do not expose the inverter to direct sunlight, in order to avoid the power and efficiency de-rating
caused by excessive heating.
6) The humidity of the installation location should be 0~95% without condensation.
7) The ambient temperature of the inverter should be -10
~+50℃.
8) The installation location must be freely and safely to get at all times.
9) Vertically installation only. Never install in horizontal positions, and avoid forward and sideways
tilting; (observe drawings below)
DANGER
!
User Manual 9 Hybrid CPSHB300ETR
Page 16
Fig. 5-1 Permitted and prohibited installation positions
10) Notice the minimum clearances of the inverter. (Refer to 3.3 Dimensions and Fig.5.2
Required Clearances).
>20cm
Fig. 5-2 Clearance space for installation
11) Do not install the inverter near TV antennas, or any other antennas and antenna cables.
12) Don not install in place where the children can easily reach.
5.3 Electrical Connections
5.3.1 Safety
Danger to life due to lethal voltages! High voltages which may cause electric shocks are present in the conductive parts of the inverter. Prior to performing any work on the inverter, disconnect the inverter on the AC and DC sides
5.3.2 Wiring PV Input
Top
Top
Top
DANGER
!
To reduce the risk of electric shock, avoid touching the live components and treat the terminals carefully.
NEVER connect or disconnect the DC connectors under load.
Risk of damage to the inverter.
If the voltage of the PV modules exceeds the maximum input voltage of
the inverter, it can be destroyed by the overvoltage. This will void all
WARNING
!
NOTICE
!
User Manual 10 Hybrid CPSHB300ETR
Page 17
Check the connection cables of the PV modules for correct polarity and make sure that the maximum open circuit voltage shall never exceed 50V.
1 The diagram drawing of DC side is shown as below, notice that the connectors are in pair (male
and female connectors).
2 Check the DC connectors for correct polarity and connect them onto the inverter.
Fig. 5-3 Connect PV connectors to inverter
5.3.3 Wiring External Battery Input
1 Loose the screw of battery connector by screwdriver and pull out the connector. 2 Tight connector screws after you insert battery-wires to lock them into place. An AWG14 wire type is
recommended. Place the battery connector back to the inverter and tight it into place.
warranty claims.
Do not connect strings to the inverter that have an
open-circuit voltage greater than the maximu
m input voltage of the
inverter.
Please use the same brand male and female PV connectors. Under any conditions the total circuit current should never exceed the Max. Current.
To reduce the risk of electric shock, avoid touching the live components and treat the terminals carefully.
NEVER
connect or disconnect the connectors under load.
Risk of damage to the inverter.
If the voltage of the battery exceeds the maximum input voltage of the inverter, it can be destroyed by the overvoltage. This will void all warranty claims. If the polarity of battery is reversed connect, it can damage the inverter fuse and inverter can’t operate anymore. Before connecting, make sure the polarity is correct.
Battery type must be valve-regulated lead-acid battery
Improper operation during the wiring process can cause fatal injury to operator or unrecoverable damage to the inverter.
i
Information
WARNING
!
NOTICE
!
NOTICE
!
User Manual 11 Hybrid CPSHB300ETR
Page 18
Fig. 5-4 Location of extended battery connector
User Manual 12 Hybrid CPSHB300ETR
Page 19
5.3.4 Wiring AC Output
Conditions for the AC Connection
Measure the grid’s voltage and frequency. It should be: (Voltage: 220~240VAC single-phase; Frequency: 50Hz/60Hz).
1. Open the transparent cover and plug in the AC power cord, the other end of power cord plug to
electrical socket
2. Plug-in the load power cord if needed.
(Different area has different plug type)
or or...
To loads (appliances)
Electrical socket
~
~
Fig. 5-5 Grid output and standalone output connections
6 Commissioning
6.1 Commission the Inverter
1) Remove the cover from the PV panel.
2) Check the PV and AC voltage.
3) If there’s DC switch, turn it to ON position.
If the inverter is connected with PV panel and the input voltage is higher than 27Vdc, while the AC grid is not connected yet, LEDs will display as below. PV power would be transferred to charge the batteries.
PV >27V and <50V
(Off)
4) Connects inverter Grid O/P to electrical socket, it will bypass the Grid power to standalone output
automatically.
5) Under normal operating conditions, the Grid LED turns green.
User Manual 13 Hybrid CPSHB300ETR
Page 20
6) Plug in load to inverter standalone output, inverter will feed-in the residual power to Grid to
balance the power consumption of load (If the residual power is more than load, inverter would reduce the input power to make the net power to Grid as zero).
6.2 Operation Modes
Self-consumption (On-Grid) Mode
In this mode, the inverter convers PV power to charging battery and/or to balance the load power consumption; Whenever the DC voltage is lower than 25Vdc, the inverter will work in waiting state and attempt to connect the grid by 5mins for <25Vdc and 30s for <16Vdc. In waiting state the inverter continuously monitors the internal system. Grid bypasses power to load directly. Note: The inverter starts up automatically when DC power from the PV panel is sufficient.
Off Grid Mode
In this mode, whenever the PV or Battery has sufficient power, the inverter convers PV and/or battery power to loads when Grid power is no available.
Fault Mode
The internal intelligent controller can continuously monitor and adjust the system state. If inverter finds any fault conditions, inverter would shutdown immediately
Bypass Mode
When no PV power during On Grid operation, inverter off internal switch but keep bypass relay on to continuously supply loads power from Grid directly.
Charger Mode
If user doesn’t want On-Grid, bypass or Off-Grid operation, wants all PV power to charge battery. Either one of below ways can make inverter stay in charger mode.
- Disconnect Grid O/P and Standalone, power on PV power.
- Press and hold button for 3s during operation (inverter would back to On-Grid operation after PV
power off and on) if Grid is available.
Sleeping Mode
User can off inverter by press and hold the button for 3s during inverter operation. In this mode, inverter off all LEDs to save energy but keep monitoring the internal system for quickly going back to normal operation. When PV power comes back, inverter will enter charger mode automatically. When PV power is gone, inverter will enter shutdown mode.
PV >27V and <50V
User Manual 14 Hybrid CPSHB300ETR
Page 21
Shutdown Mode
Inverter automatically stop running during no PV power and low battery. In shutdown mode the inverters take no power from panel and battery. If Grid is available, the inner charger would continuously charge battery but without any LED indicator. If user wants to check the capacity of battery in this mode, can press the button and see the battery LED color.
De-rating mode
When temperature high or PV voltage >38Vdc, the inverter will de-rate its output power.
6.3 Charge Current Setting
Risk of damage to the inverter
Adjust the charge current according the total Ah value of battery and don’t more than 0.3C (ex. S
et 2Amax for 9Ah, 6Amax for 20Ah). Larger charge
current to lower capacity battery can reduce the life of battery.
User can set the charge current as 1/2/3/5/7/9A (default is 1A). Note: The charger power comes from PV. Larger charge current would reduce the feeding power to Grid and/or loads.
Procedure for changing charge current, Press and hold the button.  3s later, inverter shutdown and all LEDs are red  Another 3s later, all LEDs are green
Another 3s later, BAT LED is blinking with green and the other LEDs are orange, release the
button immediately.
PV LED on green and red alternately, means inverter stay in setting mode. Note: It is not able to enter setting mode if user don’t release the button within 4s when all LEDs are orange, must release the button and redo the procedures. Now, user can change the charge current by pressing button (refer to Table 6-1 for the setting).
Table 6-1 Charge current setting
PV Panel
Battery
AC/On-Grid
Off-Grid
Charge
Current
/
Green and Red
alternately
 
Orange
1A
Orange
2A
Orange
Orange
3A
  
5A
NOTICE
!
User Manual 15 Hybrid CPSHB300ETR
Page 22
Orange
Orange
Orange
7A
Orange
Orange
Orange
9A
Procedure for confirming charge current setting and exiting setting mode, When the charge current setting is changed to what user wants.  Press and hold the button  3s later, inverter confirms the setting and exit setting mode, jump to Sleep mode and all LEDs off.
When all LEDs
are Green, release the button immediately.
Inverter goes back to normal operation.
6.4 LEDs Indicators
Inverter has 4 LEDs. They are: PV, Battery, On Grid, and Off Grid. The LEDs would display Green, Red, or Orange to indicate Status or Operation modes.
Table 6-2 LEDs indicators for On-Grid (Self-consumption or Bypass) operation Flash frequency (on/off): : 2s/1s; : 0.5s/0.5s;

: 0.2s/0.2s
Status
PV Panel
Battery
AC/On-Grid
Off-Grid
Explanation
Countdown
Green
Depend on
the status of
charge, refer
to next row

Green Flash
Off
Countdown and prepare to
On-Grid operation
Normally
operating
Green
Green
Green
Off
Operating normally with battery capacity
75%
Green with
slowly
flashing
Operating normally with battery capacity between 50% and 75% and under charging
Orange with
slowly
flashing
Operating normally with battery capacity between 25% and 50% and under charging<24.5Vdc and
23Vdc and charging
User Manual 16 Hybrid CPSHB300ETR
Page 23
Red with
Slowly
flashing
Operating normally with battery <25% and under charging
Red
Operating normally with failed or no battery
Bypass
Operation
Off
Depends on
the status of
charge
Green
Off
The load power is fully
supplied from Grid
Fault
Orange
Depends on
the status of
charge
Off
Off
PV panel is over voltage
Off
Off
Off
PV panel is under voltage
Red
Off
Off
Array impedance is too low
Any
Orange
Off
Grid is abnormal
Any
Red
Off
Internal fault occurs (ex. CT test fail, relay test fail, etc.)
Table 6-3 LEDs indicators for Off Grid operation Flash frequency (on/off): : 2s/1s; : 0.5s/0.5s;

: 0.2s/0.2s
Status
PV Panel
Battery
AC/On-Grid
Off-Grid
Explanation
Countdown
Green
Off
Depend on
the status of
battery
Orange
Off

Green Flash
Countdown and self-
test for
Off Grid operation
Output
power from
PV and
battery
Green
*A, *B
Off
Green
Operating normally, supply power from PV and battery to loads
User Manual 17 Hybrid CPSHB300ETR
Page 24
Output
power from
battery, without PV
Off

Green with
fast flashing
(*C)
Orange
Off
Green
Operating normally with battery
75% and under
discharging

Orange with
fast flashing
Operating normally with battery 25~75% and under discharging

Red with fast
flashing
(*C)
Orange
Off
Green
Operating normally with battery <25% and under discharging
Abnormal
condition or
fault
Orange
(*A)
(*C)
Orange
Off
Off
PV panel voltage > 50V
Green
Off
(*A, *B)
(*C)
Orange
Off
Orange
Inverter is operating with over load, output power > 240W or 300VA
(*A)
Red
Inverter is Off: A Fault, or Over-Load, or Low-Battery condition has Occurred
Red
Off
Battery Fault,
No battery or voltage is >
31Vdc
Red
Red
Low battery, a. <20V if Pout > 100W b. <21V if Pout 30-100W
c. <22V if Pout <30W
(*A) -> Color: depend on the remaining capacity.
(*B) -> Flashing frequency: charging is slow, discharging is fast.
(*C) -> If Off-Grid operation transfers from On-Grid mode and Grid is abnormal.
User Manual 18 Hybrid CPSHB300ETR
Page 25
7 Start-up and Shut-down the Inverter
7.1 Start-up the Inverter for On Grid Operation
1. Connect AC power cord from inverter’s AC-In to the wall’s electrical socket.
2. Connect Output to attached Load (ex. Appliances).
3. When exposing PV panel under sunlight, the inverter will start working automatically if input voltage
is higher than 27Vdc.
PV Module
Electrical Grid
Appliances
(Emergency usage)
Multiple charge, 5V/2A
(2A max for each USB and total)
CPSHB300ETR
Optional external battery
VRLA, 24V (12V*2)
DC AC
USB
Fig. 7-1 Power flow of On-Grid operation
7.2 USB Charger Only
With PV power, When PV voltage has sufficient power, USB charger will automatically operate. Without PV power,
1. Make sure the inverter is staying in shutdown mode.
2. Disconnect Off-Grid plug.
3. Press and hold the button until all LEDs are green, it takes around 1-2s (release the button
immediately when the LEDs are green).
4. USB charger starts to operate.
7.3 Start-up the Inverter for Off Grid Operation
With PV power,
1. Disconnect inverter Grid plug.
2. Turn on the DC switch or connect PV connectors, press and hold the button of inverter until
Off-Grid LED is green (release the button immediately when that LED is green).
3. Inverter will start Off-Grid operation if the input voltage is higher than 27V or battery voltage is
User Manual 19 Hybrid CPSHB300ETR
Page 26
higher than 22V.
Without PV power,
1. Disconnect inverter Grid O/P plug.
2. Press and hold the button until all LEDs are green in order to wake up inverter, (takes about 1-2s),
and then release the button immediately.
3. Wait until the Battery LED in ON, and the others are OFF.
4. Press and hold the button again until Off-Grid LED is flashing, (takes around 3s), and then release
the button immediately.
5. The inverter supplies power to Standalone O/P outlet if the battery voltage is higher than 22V.
PV Module
Electrical Grid
Appliances
(Emergency usage)
Multiple charge, 5V/2A
(2A max for each USB and total)
CPSHB300ETR
Optional external battery
VRLA, 24V (12V*2)
DC AC
USB
X
Fig. 7-2 Power flow of Off-Grid operation
7.4 Shut-down the Inverter
1. If inverter is operating, press and hold the button until all LEDs are red, it takes around 3 seconds.
2. Disconnect the AC/Grid power cord.
3. Disconnect all PV connectors.
4. When all LEDs are OFF, the inverter will totally shutdown.
User Manual 20 Hybrid CPSHB300ETR
Page 27
8 Maintenance
Once the internal battery’s discharge time is much lower than expected (< 10/30 minutes at 240W/120W load respectively), it is recommended to replace the battery. If the inverter always shows a Grid abnormal LED, please check the fuse inside the socket of AC-In/Grid module. If damaged please and replace it with a same rating one..
8.1 Replace the Internal Batteries
Danger to life due to high voltage Prior to performing any work on the product, always disconnect it from all sources and wait for 2 minutes at least.
Hot surface The inverter may be hot during operation. Before touching the inverter, shutdown and wait for 20minutes.
Risk of damage to the inverter Note the polarity of connection, reverse connection can cause fuse open and inverter can’t operate.
1. Turn the unit off and disconnect all connections: AC, PV, attached load, and external battery
connections; wait for at least 2minutes for any internal charge to dissipate.
2. Invert the unit and remove the 4-screws from the battery’s cover; (Fig. 8-1a).
3. Slide the cover towards front and lift it up; (Fig. 8-1b).
4. Turn the batteries to bring up their connectors; (Fig. 8-1c & d).
Battery
cover
1
2
Battery
a b c d
Fig. 8-1 Procedure of replacing batteries
5. Disconnect the 2 batteries from inverter and replace them with new ones.
6. Connect the new batteries to inverter, notice the polarity!
7. Assemble the inverter in reverse order.
DANGER
!
CAUTION
!
NOTICE
!
User Manual 21 Hybrid CPSHB300ETR
Page 28
8.2 Replace the Fuse
Danger to life due to high voltage
Prior to performing any work on the product, always disconnect it from
all sources and wait for 2 minutes at least.
Hot surface The inverter may be hot during operation. Before touching the inverter, shutdown and wait for 20minutes.
1. Turn the unit off and disconnect all connections: AC, PV, attached load, and external battery
connections; wait for at least 2 minutes for any internal charge to dissipate.
2. Pull out the fuse holder underneath the AC/Grid socket.
3. Replace the broken fuse with new one. Note the rating must be 6.3A/250V
4. P Place the fuse assembly back into the AC/Grid socket.
.
Fig. 8-2 Grid O/P fuse replacement
DANGER
!
CAUTION
!
User Manual 22 Hybrid CPSHB300ETR
Page 29
9 Decommissioning
9.1 Dismantling the Inverter
1. Disconnect the inverter as described in section 7.
2. Remove all connection cables from the inverter.
9.2 Packing the Inverter
If possible, always pack the inverter in its original carton and secure it with tension belts. If it is no longer available, you can also use an equivalent carton. The box must be capable of being closed completely and made to support both the weight and the size of the inverter.
9.3 Disposing of the Inverter
Do not dispose of faulty inverters or accessories together with household waste. Please accordance with the disposal regulations for electronic waste which apply at the installation site at that time. Ensure that the old unit and, where applicable, any accessories are disposed of in a proper manner.
Danger of burn injuries due to hot enclosure parts
Wait 20 minutes before disassembling until the housing has cooled
down.
CAUTION
!
User Manual 23 Hybrid CPSHB300ETR
Page 30
10 Specification
10.1 Specification of CPSHB300ETR
Table 10-1 Specification
CPSHB300ETR
PV Input
Max. input power 310W
Absolute max. input voltage 50Vdc
Full power voltage range 34-38Vdc
Operating voltage range 28-48Vdc
Rated input voltage 36Vdc
Max. input current 9Adc
MPP Tracker 1
Measurements deviation
Voltage: <2% Current: <2% Power: <3%
Battery Input (internal)
Battery type VRLA rechargeable battery
Operating voltage range 20-28.8Vdc
Nominal voltage 24Vdc (12Vdc*2)
Nominal Capacity 9Ah
Shutdown voltage
20V for >100W
21V for 30-100W
22V for <30W
Measurements deviation
Voltage: <2% Current: <2% Power: <3%
USB Charger
Nominal charge power 10W
Nominal voltage 5Vdc
Number of USB port 2
Max. charge current 2A/2A (per port/total)
Grid (AC)
Nominal voltage 230Vac, single phase
Frequency range 50/60Hz ± 0.3Hz
Voltage range -10%/+10%
Max. current bypass to load 3A
User Manual 24 Hybrid CPSHB300ETR
Page 31
Off-Grid Output (AC)
Nominal power 240W/300VA
Nominal voltage 230Vac, single phase
Nominal frequency 50/60Hz (default is 50Hz)
Overload capacity
105-125%, 1 minute 125-150%, 30 seconds >150%, immediately
Regulation
Safety
IEC 62109-1/-2
IEC62040-1
EMC
IEC 61000-6-1
IEC 61000-6-3
General
Indicator PV/Battery/On-Grid/Off-Grid LEDs
Button One button for ON, off, and select functions
Operation temperature range
-10-50
(de-rating above 40℃)
Storage temperature
-20-40
Relative humidity 0-95%
Operating elevation 0-2000m (0-6666ft)
Cooling Natural convection
Mechanical
Dimension (W*H*D, mm) 292*186*202
Weight 9kg
Package dimension
(W*H*D, mm)
380*305*290
10.2 Torque Values
Table 10-2 Torque values
Battery cover screws
10kgf.cm (0.98N.m)
User Manual 25 Hybrid CPSHB300ETR
Page 32
11 Contacts
If you have technical problems concerning our products, contact your installer or CyberPower. During inquiring, please provide below information:
1. Model Name
2. Serial Number
3. Detailed Error Description
Cyber Power Systems, Inc.
www.cyberpower.com
User Manual 26 Hybrid CPSHB300ETR
Page 33
Note
Page 34
Note
Page 35
Page 36
www.CyberPower.com
K01-0000591-00
Loading...