BWC Series
D E S I G N E D T O L E A D
Pedestal Kit Installation Instructions
WARNING: Improper installation, adjustment, alteration, service or maintenance can cause property
damage, injury, or loss of life. For assistance or additional information, consult a qualified installer,
service agency or the gas supplier. Read these instructions, and those supplied with the boiler itself,
carefully before installing.
This kit allows the BWC070, BWC090, and BWC120 to be floor mounted. See Figure 1 for basic pedestal dimensions.The
floor must be level, un-carpeted, and may be either combustible or non-combustible. Refer to the installation instructions supplied with the boiler, as well as applicable local codes, for additional location requirements.
Gas and system return piping can be routed through either the large obround knockouts on the sides of the pedestal or
through the rectangular opening in the back. The condensate drain hose can be routed through the small obround openings
located in the pedestal sides or back. It is recommended that the condensate trap, and any piping located inside the pedestal,
be mounted on the boiler prior to attaching the pedestal.
Electrical wiring may be routed through either the 7/8” knockouts in the side panels or through the rectangular opening in
the rear of the pedestal
Attach the pedestal to the boiler using the four 1/4-20 nuts and bolts supplied as shown in Figure 2. After tightening these
bolts, raise the boiler onto its feet, move to its final position and level using the adjustable leveling feet provided on the base.
Follow the installation manual supplied with the boiler to complete the installation.
CAUTION
This pedestal is
from abrasion and strain as required by the National Electric Code (ANSI/NFPA 70) or applicable
local codes.
not a listed electrical enclosure. Protect all wiring passing through the pedestal
Figure 1: Basic Pedestal Configuration (Shown with Boiler Mounted)
Manufacturer of Hydronic Heating Products
P.O. Box 14818 3633 I. Street
Philadelphia, PA 19134
Tel: (215) 535-8900 • Fax: (215) 535-9736 • www.crownboiler.com
Figure 2: Assembling Pedestal to Boiler
PN: 980059
Rev 0