Crosswater WS2001RC Installation Instructions Manual

Page 1
THERMOSTATI C SH OW ER VALVE
WS2001RC
INSTALLATIO N IN ST RU CT IO NS
For any f ur th er inform at io n pleas e co nt ac t Cross wa te r on : 0845 87 3 88 40
Or visi t ou r we b-site at w ww. cr osswa te r.c o. uk
The m anufa cture r reser ves the r ight to m ake tec hnica l mod ifica tions w ithou t prior n otice .
Page 2
1
2
INTRODUCTION
This th er mosta ti c val ve i s su ita bl e fo r use w it h all wat er s ystem s up t o a maxim um opera ti ng pres su re of 5 .0 b ar, ( bey on d wh ich w e re comme nd p ressu re r educi ng valve s to b e fitte d) .
The the rm ostat ic v alv e ha s tw o out le ts t hat c an b e contr ol led sim ul taneo us ly.
The two m ai n outle ts a re co nt ro lle d by t he f low c on trol ca rt ridge s, c ommon ly u sed f or a main sh ow er head a nd a b ath s po ut .
NOT E: FOR IL LUSTR ATIV E PURPO SES HAN DLES AR E NOT S HO WN
DIMENSIONS
NOT E: ALL DIM ENSIO NS IN MIL LIMET RES
WS2001RC
PART S ID EN TI FI CATION
OPE N
CLO SE
120
275
0
90
0
90
OPE N
CLO SE
C
H
80
45X 45
147
78- 105
G3/ 4
C w2
H OT
TMV APPROVED INSTALLATIO NS
This th er mosta ti c val ve h as b een d es ig ned t o be c ompli an t with th e re quire me nts o f TMV2. N B fo r ins ta ll ati on s go ver ne d by t his l eg islat io n the CW ma rk ing (as p ic tur ed on valv e ab ove) mu st a lwa ys b e le ft vi si bl e for t he c ommis si oning p ro cess.
No liab il ity for i ns tal la ti on co st s wi ll be a cc epted I f, f or exam pl e, the ti li ng is t oo c lo se to the bod y of t he va lv e or e xpa nd in g foa m is u se d pre ve nting t he m arkin g of t he valv e being v is ible. On ce th e in sp ect io n ha s bee n ca rried o ut t he cove r pl ate can b e fi tte d.
FLO W CONTR OL
(BAT H FI LLE R)
MAI N OUTLE T (BAT H FI LLE R
BOD Y JET S
HAN DSET)
G3/4
G3/ 4
80
45X 45 45X 45
MAI N OUTLE T (BAT H FI LLE R
BOD Y JET S
HAN DSET)
FIX ING
LUG S
HOT
INL ET
MAI N OUTLE T
(SH OWER- FIXED H EAD)
HOT C HE CK
VALVE
& FILT ER
COL D CHECK VA LVE
&FI LTER
TEM PERATU RE
CON TROL
FLO W
CON TROL
(SH OWER)
MAI N OUTLE T
(SH OWER- FIXED H EAD)
FIX ING LUG
COL D INL ET
Page 3
3
4
INSTALLATIO N INSTALLATIO N
WS2001RC
NOTES :
Pleas e re ad thes e in str uc ti ons c ar ef ull y an d keep in a s af e place f or f uture r ef ere nc e. The ins ta llati on m ust c om pl y wit h al l Lo cal /N ation al Wa te r Suppl y Aut horit y Regul at ions/ By e law s an d Bu ild in g an d Plu mb in g Reg ul ation s (U K: BS67 00 ). This va lv e is a mixi ng d evi ce a nd t her ef or e req ui res the w at er supp li es to be reaso na bly bal an ced , ot he rwi se w e re com me nd a pres su re redu ci ng valv e to b e fitte d. The val ve i s fitte d wi th in te gr al WR C ap pr ove d si ngle ch ec k valve s ca rtrid ge s whi ch comma nd t he wate r su ppl y, th ere fo re t he th er mosta ti c valve i s pr otect ed a gai ns t cross -f low due t o un bal an ce d lin e pr es sur es a s requi re d by the Water S up ply (Wa ter Fit ti ngs ) Re gu lat io ns 1 999 . Fitti ng i solat in g val ve s to t he in le t fe eds i s re comme nd ed for ea se o f maint en anc e.
INSTAL LATI ON Remem be r to tu rn o ff t he ma in s wa ter s up ply bef or e conne ct ing t o an y exist in g pip e wo rk . War nin g! P le ase c he ck f or an y hi dden pi pe s and cab le s befor e dr ill in g holes i n th e wal l.
!
!
Posit io n the val ve o nto t he w al l and m ar k th e pos it ion of th e fi xing lu gs ( x4). Ma ke sure th e va lve is se t ba ck fr om t he f ron t fa ce of the w al l by the ap pr opria te d epth to allo w fo r plast er boa rd , fi lli ng a nd t ili ng e tc. (mi n. 7 8mm to ma x. 1 05mm se e dimen si on page ). Mount c as ting to t he w all u si ng s uit ab le f ixi ng s. Alway s le ave acc es s to th e fo ur f ron t ca rt rid ge s for ser vi cing. Once th e va lve has b ee n sec ur ed t o the w al l, t he bl ac k Plast ic D ust Cov er c an be tempo ra lly att ac hed t o th e va lve w it h th e scr ew s suppl ie d. Th is w ill pro te ct th e va lv e while t he r est of th e wo rk is c om pl ete d (s ee f ig 1) . Inlet s an d outle ts a re al l ta pp ed BS P. Mak e all p ip e work co nn ectio ns u sing a propr ie tary th re ad se al er.
Do not us e ta per ed t hr ead ed a da pto rs .
Blank o ff and se al t he op en o ut let i f it i s no t req ui red. Remov e th e Plast ic D ust C ov er. Tur n on supp li es an d te st a ll co nn ec tio ns f or w ate r ti ghtne ss . Remov e Ho t and Col d ch eck v al ve s, an d fl us h out t he i nstal la tion, c le an the fi lt ers and ref it . Apply a n ar row bea d of c lea r si li con e se al ant a ro und the b ac k edge of t he c over pl at e and car ef ully pr es s int o po si tio n. Fit the c on tro l kn ob s by li ni ng u p the f la t su rfa ce o f the val ve c over wi th t he grub screw o n th e handl e, t igh te n th e scr ew w it h the s up plied h ex agona l ke y (see fi g 2) .
3/4"
FIG . 2 FITTI NG CONT ROL HAN DLE SFIG . 2 FITTI NG CONT ROL HAN DLE S
FIX ING LUG S
FIG . 1 FITTI NG PLAS TIC DUS T COV ER
DUS T COV ER
FIX ING SCR EWS
FIX ING SCR EWS
COV ER PLATE
HAN DLE
Page 4
5
6
WS2001RC
STO P
THE RMOS TATIC
SPI NDLE
THE RMOS TATIC
CART RID GE
TEMPERATURE SETTING MAINTENANCE
To set the te mp era tu re , rem ov e th e handl e an d unscr ew t he ce nt re s cre w of the the rm ostat ic c ont ro l co ver. R ot at e the expos ed t hermo st ati c sp in dle ( cl oc kwi se for col d, a nd anti -c loc kw is e for h ot ) un til t he maxim um d esire d sh owe ri ng t emp er at ure
0
is set (4 2 C -s ugges te d maxim um p re-se t tempe ra ture) . Then li ne u p the scr ew h ead o n th e ba ck of the the rm ostat ic c ont ro l co ver w it h th e fir st stop on t he s top r in g it sel f. P us h the c on tr ol cover o nt o the spl in es an d ti gh ten t he c en tre screw, r ef it th e ha nd le. T he t her mo st at is now set t o it s new t em pe rat ur e an d can o nl y be incr ea sed or de cr eas ed b y re pea ti ng t his proce ss .
"
"
MAINTENANCE
Note: To av oid dam ag e, pl ea se r emo ve a ll c hro me parts b ef ore any m ai nte na nc e tak es p la ce.
THERM OS TATIC C ART RI DG ES
The 1 con ce aled th er mos ta ti c val ve s ho uld give tr ou ble fre e se rvi ce , bu t in th e ev en t of failu re , servi ci ng is s tr ai ght f or wa rd.
"
To rem ov e the the rm ost at ic c art ri dg e.
Undo th e ca rtrid ge c lam p nu t (t ake n ot e of the ori en tatio n of t he ca rt ri dge ) an d pu ll th e cartr id ge out us in g the t em pe rat ur e co ntr ol knob to a id r emova l. Wa sh t he ca rt ri dge w it h clean r un ning wa te r and m ak e su re th at a ny trapp ed d ebris h as b een r em ov ed. D ry a nd light ly g rease t he s eal s (o nl y use s il ic one greas e) a nd repl ac e the c ar tr idg e ma ki ng sure th at t he lo ca ti ng lu g is l oc ate d in t he reces s on t he hot si de o f the v al ve .
FLOW CO NT ROL C AR TRI DG E
The Flo w Co ntrol C ar tri dg e us es ce ra mi c dis cs w hich no rm ally la st i ndefi ni tel y un le ss debri s ma nages t o ge t bet we en t hem . Was h th e ca rtr id ge with c le an runn in g water, d ry a nd light ly g rease t he s eal .
FI LTE RS /C HE CK VA LVES
Th e ch ec k va lv es sto p cros s flow be tw ee n th e ho t and co ld sup plie s.
To cl ea n th e Ch ec k Va lv es .
Un do a nd r em ov e the Ch eck va lve. Usin g a pa ir o f pl ie rs r emov e the No n retu rn va lv e an d fi lt er. Was h th e fi lt er wit h clea n ru nn in g wa te r, dry and l ig ht ly g re as e th e se al s.
CARE OF Y OUR SHO WE R VALVE
We re co mmend c le ani ng t he v alv e wi th a s oft d am p cl oth . We st ro ngly ad vi se ag ai ns t the u se o f ALL cl ea nin g pr oduct s.
TROUBLE SHOOTING
SYM PTOM SOL UTION
After i ns tal la ti on th e sh ow er ru ns H OT or COLD a nd w ill not m ix .
Ho t an d co ld s up plie s are pl umbe d the wr on g wa y ro un d. Re mo ve t he t he rmos tati c cart ridg e, un do t he c la mp n ut and p ull th e cart ridg e ou t (u si ng t he t empe ratu re con trol k nob to a id r em ov al ). Re in st al l it w ith th e loca ting l ug poi ntin g aw ay f ro m th e in lets .
Sh ow er w il l no t run ho t enou gh whe n fi rs t in st al led.
Ma xi mu m te mp erat ure ne eds ad just ing, se e te mp er at ure se ttin g .
Co ld w at er t ra ckin g thro ugh th e valv e in to t he h ot w at er sys tem.
Ch ec k an d cl ea n the ch eck va lve ca rt ri dg es a nd fil ters l ocat ed und er th e ch ec k va lv es.
Very low f lo w or no flo w (g rav it y) .
Ch ec k ho t an d co ld fee ds (th e valv e will sh ut d ow n if e it her th e hot or c old su pply fa il s) .
FILT ER
NON R ETURN
VALVE
CHE CK VALVE
LOC ATIN G LUG
SEA LS(X3 )
THE RMOSTAT IC
CAR TR IDG E
CAR TR IDG E CLA MP NUT
LOC ATIN G LUG
Loading...