IMPORTANT - Advice and safety - Please read before installation
Please read these instructions carefully before starting installation
and keep in a safe place for future reference. ENSURE the room is well
heated and ventilated.
Check the contents of the pack carefully before installation. Bauhaus will
y product has
If any fault is found with materials or workmanship, it must be reported
immediately to the manufacturer. Remedial action will be taken, based on
information received, on condition that: 1. Full details are supplied to the
3. The manufacturer is informed of any damage/shortages prior to
installation. 4. The product has not been installed, or attempts have been
made to install.
We do not accept responsibility for any problems that may occur through
incorrect installation.
Advice & Safety
Plumber/
product guarantee maybe considered invalid. For a claim made under our
can be required.
tting to avoid
unnecessary damage occurring.
It is recommended that the furniture and accessories are installed after
product to be easily removed if required in the future.
This document has been prepared for your guidance, you must exercise
due care at all times.
Please note that some units are heavy. Always take care when lifting, and
follow health and safety guidelines. It is recommended that 2 people carry
out the installation of larger basin/vanity units over 30Kgs gross weight.
Warning! Please check for any hidden pipes or electrical cables before
When using power tools always follow the manufacturer’s user instructions.
studded/plasterboard walls, please use appropriate plasterboard
Please ensure the wall can take weight of units detailed above. Before
installing a wooden bathroom unit into a new property, extension or recently
plastered room we strongly advise the building/room is completely dry, well
ventilated and adequately heated.
Important pre-installation notes
To ensure full working use of the drawers we recommend the use of
Bauhaus basin furniture trap BTR0410W.
Care & Cleaning
Cast mineral marble products should be cleaned regularly with warm soapy
water, then rinsed with clean water and, if desired, dried and polished with
a soft cloth. Lime scale deposits can be removed using a 50:50 solution of
warm water and lime scale remover and soft clean cloth. We recommend
regular cleaning with Bauhaus Cream Polish SD150RW, specially
formulated to clean and help protect the surface of cast mineral marble
basins.
Do not use abrasive cleaners or bleach in this will permanently damage the
high gloss surface.
carcasses.
If any maintenance is required then it must be carried out by a
Plumber.
prior notice.
bathroom has
urniture
ions without
INSTALLATION INSTRUCTIONS
1
Basin & Basin Unit Installation
c
Top
c
a
a
1200
3D
80100
00
10
42
3D
Fe
www.camar.it/warning
Step 1Step 2
Removing the drawer
Pull the drawer out, lift slightly
aprox. 10 cm before the limit stop.
Step 3
113
mm
500 Basin Unit
438mm
Pull firmly horizontally until
the drawer audibly disengages,
then lift off.
700 Basin Unit
638mm
113
mm
Plan unit position
Decide on the position and height of the unit. The recommended
basin.
860mm 870mm
113
mm
300mm 310mm
860mm 870mm
1000 Basin Unit
Unit height dependent
on basin height
938mm
‘Wall bracket’ installation
Use the measurements above, to position the ‘wall brackets’.
a: Important: The measurements given
above are the maximum the brackets can
be spaced apart, the brackets must fit
within that measurement.
b: Mark the bracket fixing holes onto
the wall. Drill Ø 8mm holes, insert the
wall plugs on solid walls and attach the
brackets (c).
Important: If the basin unit and/or basin are not fitted level this
may result in the basin not draining correctly.
Position the unit on the brackets.
b
a
113
mm
52
mm
36 mm
438 - 638 - 938 mm
Removing bracket from the wall
Profile
c
2
Step 4
a: Check the unit is level.
If levelling is required, use
a screwdriver to adjust the
hanging position, as follows:
b: To lift or lower the unit,
adjust the screw shown.
c: To move the unit closer or
further from the wall, adjust the
screw shown.
Step 5
Basin Installation
a
DE0002SCW Basin is shown as
a typical example
a
b
c
c
a: Attach the tap to the basin
and carefully bed in the waste
using silicone
b: Carefully apply silicone to
the top edges of the unit.
c: Carefully position the basin
down onto the unit, ensure it is
at the back.
Connect the tap and waste.
Apply a bead of silicone to the
join between the basin/unit and
wall, on all 4 sides.
Apply silicon where the basin
overhangs the carcass.
Leave silicone, 24 hours to dry.
only
.
basin material which may in time cause the failure of the product. W
should be carefully bedded in silicone and the back nut hand tightened an in order to prevent similar stress related failures.
Worktop / Basin Installation
acb
Important: All cut edges MUST
be sealed with water proof
sealant or exterior wood varnish.
Step 6
Inserting the drawer:
Place the drawer on the extended slides.
a: Prepare worktop for tap/s
and basin. Cut holes where
required using a suitable sized
hole cutter.
b: Carefully apply silicone to
the top edges of the unit.
c: Carefully position the
worktop down onto the unit,
ensure it is centrally positioned
Connect the tap and waste.
Apply silicone to the join
between the worktop and wall,
down sides of the unit and
around the base of the basin.
Apply silicon where the basin
overhangs the carcass.
Leave silicone, 24 hours to dry.
Slightly lift the drawer at the front and then
push fully closed.
Drawer engages automatically!
Test to make sure the drawer operates correctly.
The hook situated on the back of the runner has
to be fixed in the metal side of the drawer.
3
RUNNER FITTINGS
Step 1
Removing the drawer front
Insert the screwdriver in the left screw
and slide it to the left.
The drawer front is now released and can be
removed.
Step 3
Eccentric height adjustment on both sides
Step 2
Drawer front installation
Insert the drawer front into the drawer
sides. The panel engages
automatically and is fixed.
Release locking screws
on both sides.
Step 4
Turn adjustment.
Only the right hand
side has to be operated
due to the integrated
lateral adjustment.
Adjust drawer front by means
of eccentric screws.
Side adjustment, right
Tighten locking screws.
Step 5
With rectangular railings,
tilt angle adjustment of
the front is via the front
panel holder.
3
Front tilt angle adjustment
4
Assembly and disassembly of cam bolt construction drawers.
Steps
Insert the screwdriver in the cam bolt and slide it to the left.
a
The front panel is now released and can be removed.
b
Insert the front panel into the drawer sides and repeat the
c
operation, insert the screwdriver in the cam bolt and slide it to
the right.
The drawer in installation.
d
For any further information please contact
Bauhaus on: 0345 873 8840
Or visit our web-site at:
www.crosswater.co.uk
The manufacturer reserves the right to make technical
Crosswater Glide II Single Drawer Unit.indd 528/2/12 13:35:27
5
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.