Crosley CAE5M14, CAE5M16, OPP5K, CAE5M12, CAE5M15 Installation Instructions Manual

...
|nstailation instruct"
READ BEFORE iNSTALLiNG UNiT
OPP5K Window Mounting
Your air conditioner is designed to install in standard double hung windows with opening widths of 23 to 36 inches (584 mm to 914 mm) (FIG, 1)
Lower sash must open sufficiently to allow-a clear vertical opening of 14-1/2 inches (368 ram). Side louvers and the rear of the AC must have clear air space to allow enough airflow through the condensel; for heat removal. The rear of the unit must be outdoors, not inside a building or garage.
NOTE: SAVE CARTON and these ]INSTALLATION INSTRUCTIONS fin future reference. The carton is the
best way to store unit during winter, or when not in use.
Some assembly is required, Please read these instructions carefully.
Mounting Hardware
3/4"screws
lock flame
sash lock
Qty.
7
When handling unit, be careful to avoid cuts from sharp metal edges and aluminum fins on
front and rear coils.
Before installing unit, the top rail must be assembled on the unit.
Top Rail Hardware Qty.
3/8" Screw- 4
Top Rail 1
TOOL NEEDED: __ T°'_' aiit
* Phillips Screwdriver
_z
A, Remove the air
conditioner from the Packa carton and place on a
flat surface, [Zig.A
B. Remove top rail from
the bottom of the packaging material as
shown in Fig. A
C. Align the hole in the
top rail with those in the top of the unit as shown in Fig. B
D, Secure the top rail to
the unit with the 3/8" Screws as shown in
Fig. C
Fig._
TOOLS NEEDED:
, Phillips Screw Driver * Drill (If pilot holes are needed)
NOTE: FOR SAFETY REASONS, ALL FOUR (4) SCREWS MUST BE SECURELY
FASTENED.
1 P/N 66129901121
How to Install
NOTE: Top Rail and Sliding Panels at each side are offset to provide the proper pitch to the rear of (5/16"). This is necessary for proper condensed water utilization and drainage. If you are not using the Side Panels for any reason, this pitch to the rear must be maintained!
Place unit on floor, a bench or a table. There is a Left and Right Window Filler P_mel - be sure to use the proper panel for each side.When installed
the flange for securing the panel in place to the window sill
will be facing into the room.
A. Hold the
Accordion Pmlel in one
hand _md
gently pull back the center to free
the open end. See Figure 2.
C.
D.
Once fl_epanel has been
installed on the side of the cabinet, make sum it sits
securely inside the frame
channel by making slight adjustments. Slide the top and bottom ends of the frame into the top and bottom rails of the cabinet. Figure 5.
Slide the panel all the way in and repeat on the other side.
NOTE: If storm window blocks AC, see FIG. 14.
Keep a firm grip on the air conditioner, carefully place the unit into the window opening so the
bottom of the air conditioner frame is against the
window sill (FIG. 6 & FIG. 6A). Carefully close the window behind the top rail of the unit.
B. Slide the flee end ("F'sectiou) of the panel into the
cabinet as shown in Figures 3A, 3B & 4. Slide the panel down. Be sure to leave enough space to slip the top and bottom of the frame into the rails on the cabinet.
Extend the side panels out against the window frame (FIG. 7).