CREE LIGHTING KBL Series, KBL WITH ML SENSOR, KBL WITH PML SENSOR, KBL Installation Instructions Manual

KBL Series
LED Luminaire
Universal Hook and Cord or Pendant Mount
IMPORTANT SAFEGUARDS
READ AND FOLLOW ALL
SAFETY INSTRUCTIONS
1. DANGER- Risk of shock- Disconnect power before installation.
DANGER – Risque de choc – Couper l’alimentation avant l’installation.
2. This luminaire must be installed in accordance with the NEC or your local electrical code. If you are not familiar with these codes
and requirements, consult a qualied electrician.
Ce produit doit être installé conformément à NEC ou votre code électrique local. Si vous n’êtes pas familier avec ces codes et ces
exigences, veuillez contacter un électricien qualié.
3. Suitable for damp location.
Convient aux emplacements humides.
4. Maximum ambient operating temperature: 9L, 12L, 18L (M) = 50°C and 24L (H), and 30L= 40°C.
Température ambiante maximale de fonctionnement:
9L, 12L, 18L (M) = 50°C et 24L (H), et 30L= 40°C.
5. MIN 90°C SUPPLY CONDUCTORS
LES FILS D’ALIMENTATION 90°C MIN.
6. Check to make sure that all input power connections have been properly made and the module is grounded to avoid potential electrical shock.
7. DO NOT lift luminaire by the power cord or any of the cables connected to the LED heatsink and LED driver.
INSTALLATION INSTRUCTIONS
INSTRUCTIONS D’INSTALLATION
KBL
KBL WITH ML
SENSOR
SAVE THESE INSTRUCTIONS
FOR FUTURE REFERENCE
NOTES:
Images used in this installation sheet are for illustration purpose,
there are different congurations of the luminaire.
For each mounting application below, when mounting to surface ensure that the mounting surface and customer supplied hardware is capable of supporting the weight of the luminaire.
The center of mounting is NOT the same as the center of luminaire.
TO INSTALL:
1
Luminaire Hook
Retainer Spring
Hook Adjustment Screws
1/2” (13mm) IP, 0.875” (22mm) O.D. Knockout
1 of 6
KBL WITH PML
SENSOR
HOOK AND CORD MOUNT
STEP 1:
Push down on retainer spring until top of spring is free of luminaire hook. See Figure 1.
STEP 2:
Slide hook into securely mounted customer supplied eye hanger and return retainer spring to original position. NOTE: The luminaire should already be factory set for correct balance. If necessary, the fixture may be balanced by loosening the hook adjustment screws on the top of the housing and sliding the hook as necessary for correct balance. Tighten hook adjustment screws when finished. See Figure 1.
STEP 3:
Make wiring connections per the Electrical Connections section. After electrical connections for luminaires with a sensor go to pages 4-6 for installation of sensor.
LPN00513X0001A4_D
2
Adjustment Screws
Pendant Slider Plate
3/4” (19mm) IP,
1.125” (29mm) O.D. Knockouts
3
4
“L” Channel
(4) Keyhole Slots
Pendant Mount Hole
3/4” (19mm) IP, 1.125”
(29mm) O.D.
Hinged Splice Box
1/2” (13mm) IP,
0.875” (22mm)
O.D. Knockouts
Hinged J-box
Hinged J-box
Screw
Add 2 Screws For Aluminum Reflectors
(4)
Luminaire
Mounting
Tabs
Locking Feature
PENDANT MOUNT
STEP 1:
Remove hinged splice box from top of housing by loosening screw and sliding box to the right and up from “L” channel. Unhook from hinge holes. See Figure 2 and 3.
STEP 2:
Remove hook, slider plate and cord and discard. Plug junction box knockout hole with provided junction box plug.
STEP 3:
Attach the supplied pendant mount slider plate using (2) supplied screws (Adjustment Screws). Use customer supplied 3/4” threaded pendant, along with two customer supplied locknuts (one for inside the hinged splice box and one for outside the splice box). Pull supply leads into position from customer supplied conduit. Note: If necessary, the luminaire may be balanced by loosening (2) screws for pendant adjustment on the top of the hinged splice box and sliding the adjustment plate as necessary for correct balance. Tighten (2) screws when finished. See Figure 2.
STEP 4:
Attach one end of the hinged splice box to luminaire by aligning hinge slots on Mounting Bracket with hinges (on splice box), and then inserting the hinges into the slots.
STEP 5:
Make wire connections per Electrical Connections and then push the leads into
hinged splice box. Close the hinged J-box and re-tighten the screw. See Figure 3.
STEP 6:
Secure other end of the hinged splice box to luminaire by sliding screw on Mounting Bracket up and over in “L” channel on the hinged splice box. See Figure 2.
STEP 7:
Secure luminaire to hinged splice box by tightening screw.
STEP 8:
For luminaires with a sensor go to pages 4-6 for installation of sensor.
2 of 6
REFLECTOR INSTALLATION
TOOL LESS REFLECTOR:
STEP 1:
5
Loosen Screws
Place the reflector over the luminaire mounting tabs so that the big reflector keyhole slots align with the tabs. See Figure 4. NOTE: For aluminum reflectors, insert two screws, provided with the reflector, for retention as shown in Figure 4.
STEP 2:
Turn the reflector counter-clockwise until it locks into place with the locking feature. See
Figure 4.
STEP 3:
To remove the reflector, depress locking tab and turn reflector clockwise.
LPN00513X0001A4_D
Loading...
+ 4 hidden pages