Your ODC XR10Pontoon Boat comes in two separate cartons consisting of the following parts:
ALUMINUM FRAME
(1) Left Frame Member
(1) Right Frame Member
(1) Seat Support Frame Member with Underseat Lift and Lock Anchor System Attached
(10) Short Snap Pins
(1) Side Storage Pocket
(1) Rigid Grid Cargo Deck with motor mount (with protective bar for shipping attached)
(1) Anchor Line Storage Bag
(1) Plastic Padded Seat Back
(1) Plastic Padded Seat Bottom
OARS & OARLOCKS
(1) Pair 8 foot, 3 piece oars
(1) Pair bronze oarlocks, with split rings
(1) Pair Oar Stops
(2) Oarlock Bushings
WARRANTY CARD & PATCH KIT
STRIPPING APRON
(1) U-Bar
(1) Rod Holder
(4) Seat Screws
(2) Seat
Assembly Pins
PONTOONS
(1) Pair pontoons: Each pontoon consists of
30 oz. PVC thermal welded cover, 420 denier nylon
liner and 30 gauge PVC bladder with valve insert
and valve plate all pre-assembled.
(8) Cam-lock straps
(1) PUMP
Complete with a set of adapters
M
TTM
ODC XR 10
TTMM
OOUUTTDDOOOORR DDIISSCCOOVVEERRYY CCRRAAFFT
ASSEMBLY INSTRUCTIONS
I. PADDED SEAT ASSEMBLY
1. Assemble Seat Back to Seat Bottom using Seat Pins (see figure 1).
II. FRAME ASSEMBLY
NOTE: Your frame assembles using (10 ) Short Snap Pins and (4) Seat Screws for seat installation. Please fol­low instructions accordingly. See figure 3 for Snap Pin installation.
1.
Assemble Seat to Seat Support Frame Member using 4 Seat Screws (see figure 1).
2. Assemble Seat Support Member to Left and Right Frame Members using (4) Short Snap Pins (see figure 4).
3. Assemble U-Bar to back of Left and Right Frame Member, using (2) Short Snap Pins (see figure 4).
4. Remove Protective Support Bar and assemble Cargo Deck to back of Left and Right Frame Member using (2) Short
Snap Pins (see figure 4)
5. Assemble Foot Bars to front of Left and Right Frame Member (see figure 4).
6. See figure 9 and 11 for use of Underseat Lift and Lock Anchor System.
T
III. PONTOON INFLATION
NOTE: Use the large cone adapter provided with your pump. See figure 7 for a detail of the
valve assembly. Before inflation, be sure to fully seat each valve assembly into the pontoon, screwing tightly by hand. When fully seating valve assembly, be sure that the valve plate is in place around valve assembly and not restricting the valve assembly from a full seal. After inflating, be sure to fully seat the top cap on to each valve assembly, screwing tightly by hand. Both are required for an airtight seal.
Inflate each pontoon. The valve is located at the top center of each Pontoon (see figure 5).
1.
Inflate until firm (do not over inflate).
2. Again, be sure top valve cap and valve assembly are fully seated to achieve airtight seal.
PONTOON DEFLATION: Unscrew entire valve assembly from pontoon.
IV. ATTACH PONTOONS TO FRAME
NOTE: Always inflate Pontoons first, before attaching to frame.
Position inflated Pontoons under the Left and Right Frame Members with ODC XR10logo oriented to
1.
the outside.
2. Attach each Pontoon to frame using (8) Cam Lock Straps. Slip each strap through D-Ring on Pontoon, around
frame and pull tight through Cam Lock Buckle. NOTE: Be sure the straps are pulled tight through the Cam Lock Buckles (see figure 6).
V. OAR & OARLOCK ASSEMBLY
1. Slide the Oar Stop over the handle end of the Oar Shaft and tighten Oar Stops with nut and bolt provided.
2. Assemble 2 Oar Shaft pieces and Blades.
3. Place Oarlock Bushing over Oarlock shaft and place Oarlock into frame. Frame has 3 Oarlock postions for a
custom fit. Attach split ring at end of Oarlock shaft to secure Oarlock in place (see figure 8)