Crate & Barrel Vintner Wine Tower, Vintner Wine Tower Black Assembly Instruction

VINTNER WINE TOWER
HARDWARE
Thank you for purchasing the Vintner Wine Tower. This page lists all the contents included in the box. Please take time to identify the hardware as well as the individual components of this product. As you unpack and prepare for assembly, place the contents on a carpeted or padded area to protect them from damage.
Note: 2 people are required to safely assemble this product.
COMPONENTS
16 - cams
1 - pull bolt
4 - shelf supports
Missing hardware? Please call 800.606.6387 for replacements.
16 - cam screws
40 - wood dowels
1 - large screw
16 - cam covers
28 - small screws
1 - plastic anchor
1 - pull
8 - medium screws
1 - wall screw
1 - wall strap
TOOLS REQUIRED
Phillips head screwdriver
1 - top panel
2 - side panels
(1 left, 1 right)
Made in China - r04 Page 1 of 6
Customer Service 800.967.6696 | www.crateandbarrel.com
1 - slotted panel
1 - large back panel
2 - drawer side panels
(1 left, 1 right)
1 - shelf 1 - drawer
2 - middle panels
1 - small back panel
2 - back wine racks
front panel
4 - legs
1 - bottom panel
1 - front top rail
1 - drawer back panel
2 - front wine racks
1 - front bottom rail
1 - drawer bottom panel
VINTNER WINE TOWER
top panel
A
middle
B
panel
Make sure arrows on each cam point towards edge with nearest holes
1 A) Insert 4 cam screws into the top panel as shown. Secure, but do not over tighten, screws with a phillips head screwdriver. B) Insert 8 cams into 2 middle panels. Make sure arrows on each cam point towards the nearest edge with holes. C) Insert 4 cam screws into the bottom panel as shown. Secure screws with a screwdriver.
C
bottom panel
B
A
left side panel
A
C
right side panel
C
2 A) Insert 8 cam screws into left and right side panels.
B) Insert 8 cams into left and right side panels. C) Insert 8 wood dowels into left and right side panels as shown. Press firmly to secure.
B
front wine rack
A
back wine rack
B
front top rail
C
front bottom rail
D
3 A) Insert 8 wood dowels into 2 front wine racks. B) Insert 8 wood dowels into 2 back wine racks. C) Insert 4 wood dowels into 1 front top rail. D) Insert 4 wood dowels into 1 front bottom rail.
Made in China - r044 Page 2 of 6
Customer Service 800.967.6696 | www.crateandbarrel.com
Loading...
+ 4 hidden pages