![](/html/c7/c797/c797d801c96758aed306c4c098ddb94e82833edefd10230b03ee93e006484614/bg1.png)
Customer Service 800-967-6696 | http://www.crateandbarrel.com
VENETIAN BATH BASE CABINET
Thank you for purchasing the Venetian Bath
Cabinet Base. This page lists all the contents
included in the box. Please take time to identify the
hardware as well as the individual components of
this product. As you unpack and prepare for
assembly, place the contents on a carpeted or
padded area to protect them from damage.
Note: 2 people are required to safely assemble this
product.
BASE CABINET COMPONENTS
1 - top panel 1 - middle panel
1 - door panel
2 - side panels
(1 right, 1 left)
1 - drawer back
panel
Made in China - r06
2 - drawer side
panels (1 right, 1 left)
BASE CABINET HARDWARE
4 - small
wood screws
4 - flat
washers
2 - pulls
Missing hardware? Please call 800.606.6387 for
replacements.
8 - large
wood screws
4 - split
washers
8 - shelf
pins
12 - cam covers
4 - machine
screws
screws
TOOLS REQUIRED
Phillips head screwdriver
(included)
1 - base panel 2 - adjustable shelves
1 - back panel
1 - drawer front
panel
1 - drawer bottom
panel
2 - pull
screws
12 - cams12 - cam
Page 1 of 4
![](/html/c7/c797/c797d801c96758aed306c4c098ddb94e82833edefd10230b03ee93e006484614/bg2.png)
Customer Service 800-967-6696 | http://www.crateandbarrel.com
VENETIAN BATH BASE CABINET
B
1 A. Insert 4 cams into the middle shelf as shown.
Make sure the arrow on each cam points towards edge
with dowels.
B. Insert 2 cam screws into the inner holes of each side
panel as shown. Secure with the phillips head
screwdriver.
3 Fit cam screws of remaining side panel into the
middle shelf. Secure both cams by turning clockwise
with a phillips head screwdriver.
Made in China - r06
Make sure
arrow on
each cam
points towards
edge with
dowels
x 2
A
Cam in
unlocked
position
Cam in
locked
position
B
2 A. Fit middle panel into position, aligning cam screws and
dowels as shown.
B. Secure middle panel by turning each cam approximately
90ยบ clockwise with a phillips head screwdriver until secure.
A
Base
Panel
C
B
Top
Panel
4 Insert 4 cam screws into the inner holes of the base
panel and secure with the screwdriver.
B. Insert 4 cam screws into the inner holes of the top
panel and secure with the screwdriver.
C. Turn side panel assembly upright and insert 8 cams,
making sure arrows on cams point towards edges with
dowels.
Make sure arrow
on each cam points
towards edge with
dowels
Page 2 of 4
![](/html/c7/c797/c797d801c96758aed306c4c098ddb94e82833edefd10230b03ee93e006484614/bg3.png)
Customer Service 800-967-6696 | http://www.crateandbarrel.com
VENETIAN BATH BASE CABINET
B
A
5 A. Attach base panel to side panel assembly, aligning all
cam screws and dowels. Secure cams with the screwdriver.
B. Slide back panel into slot at back of side and base
panels.
7 Turn case assembly around. Attach top and base of
back panel with 4 machine screws, 4 split washers and
4 flat washers as shown. Secure with a phillips head
screwdriver.
Made in China - r06
x 4
6 Fit top panel onto assembly and secure by turning 4
cams clockwise.
8 Insert 8 shelf pins at desired shelf heights. Place 2
adjustable shelves into position, making sure they are
firmly supported by the shelf pins.
Page 3 of 4