
TOTEM SHELVING
ASSEMBLY HARDWARE
Thank you for purchasing the Totem Shelving. This
page
lists all the contents included in the box. Please
take the time to identify the hardware as well as the
individual components
and prepare for assembly, place the contents on a
carpeted or padded area to protect them from damage.
Note: 2 people are required to safely assemble this product.
to this product. As you unpack
COMPONENTS
26 - cam
screws
26 - cams
4 - screws
WALL MOUNTING HARDWARE
2 - mounting
plates
Missing hardware?
Please call 800.606.6387 for replacements.
1 - wall
screw
TOOLS REQUIRED
phillips head screwdriver
(We recommend the use of hand tools over power tools)
26 - cam
covers
1 - wall
strap
26 - wood
dowels
1 - top panel 1 - bottom panel 4 - side panels
2 - back panels 1 - back leg
panel
Made in China - r05 Page 1 of 4
Customer Service 800.967.6696 | Latest instructions available at www.crateandbarrel.com
2 - side leg
panels

TOTEM
SHELVING
NOTE: Make sure arrows
on each cam point toward
the nearest edge with holes
A
B
1 A) Insert 6 cams and 6 wood dowels into back leg
panel as shown. Make sure arrows on each cam point
toward nearest edge with holes.
B) Insert 2 cams, 2 cam screws, and 2 wood dowels into
side leg panels as shown. Secure, but do not over tighten,
cam screws with a phillips head screwdriver.
2 Fit dowels of back leg panel into corresponding holes
of side leg panels. Using a screwdriver, turn each cam
clockwise until it securely engages the cam screw.
B
A
4 A) Fit dowels of leg assembly into corresponding holes
of bottom panel as shown. Secure all cams.
3 Insert 6 cam screws to underside of bottom panel
as shown.
Made in China - r05 Page 2 of 4
Customer Service 800.967.6696 | Latest instructions available at www.crateandbarrel.com
B) Insert 8 cam screws into top of bottom panel as
shown.

TOTEM
5 Insert 4 cams and 4 wood dowels into side panels
as shown.
SHELVING
NOTE: Make sure
grooves of side panels
face each other as
shown
B
A
6 A) Fit dowels of side panels into corresponding holes of
bottom panel as shown. Make sure grooves of side panels
face each other as shown. Secure cams.
B) Fit back panel into grooves of each side panel assembly
as shown.
7 Insert 8 cam screws into top panel as shown.
A
B
8 A) Fit dowels of side panels into corresponding holes of
top panel as shown. Secure cams.
B) Cover all exposed cams with cam covers.
Assembly is now complete.
Made in China - r05 Page 3 of 4
Customer Service 800.967.6696 | Latest instructions available at www.crateandbarrel.com

TOTEM
SHELVING
INSTRUCTIONS FOR ASSEMBLING ADDITIONAL SHELVES
With the assistance of another adult, carefully stack units.
Locate pilot holes on the back of each unit. Attach 2 mount-
ing plates onto back of both units with 4 screws. Using a
screwdriver, secure screws but do not over tighten.
Repeat steps for each additional shelf purchased.
NOTE: Do not stack over 4 units high.
SAFETY MOUNTING INSTRUCTIONS
For shelves stacked 2 units or higher, it is recommended that
the wall mounting hardware be installed. For safe mounting,
it is essential to use wall anchors appropriate to your wall
type (i.e. plaster, drywall, concrete, etc.). Mount to wood
studs whenever possible.
A. Insert large screw through wall anchor strap and into the
wall anchor.
B. Insert small screw through wall anchor strap and into the
top back of unit.
Mounting assembly is now complete.
NOTE:
If you are unsure about your wall type or what mounting
method you should use, consult a qualified professional
or your local hardware store.
CLEANING AND CARE
Clean surfaces with a dry or damp soft cloth.
Do not use abrasive cleaners. Do not use furniture
wax or polish as the wood is finished with a
protective clear lacquer.
NOTE: Insert screws 3/4"-1"
from the edge of the strap
wall
strap
wall
screw
wall
screw
(NOTE: Additional
screw not included.
Please consult your
local hardware store.)
WALL
Made in China - r05 Page 4 of 4
Customer Service 800.967.6696 | Latest instructions available at www.crateandbarrel.com