Crate & Barrel Studio Compact Office Assembly Instruction

STUDIO COMPACT OFFICE
Thank you for purchasing the Studio Compact Office. This page lists all the contents included in the box. Please take time to identify the hardware as well as the individual components of this product. As you unpack and prepare for assembly, place the contents on a carpeted or padded area to protect them from damage.
Note: 2 people are required to safely assemble this product.
HARDWARE
16 - wood dowels
6 - small bolts
4 - file crossbars
(2 legal, 2 letter)
4 - cam screws
44 - screws 8 - flat
4 - hinges 2 - pulls 8 - shelf
TOOLS REQUIRED
phillips head screwdriver
flat head screwdriver
Missing hardware? Please call
800.606.6387 for replacements.
4 - cams 15 - allen
bolts
8 - spring
washers
washers
pins
allen wrench (included)
8 - large bolts
11 - barrel nuts
8 - drawer barrel nuts
COMPONENTS
1- bottom panel
2 - side panels
(1 left, 1 right)
1 - top panel
1 - tray
1 - partition 1 - fixed
shelf
1 - back panel
4 - legs
2 - adjustable shelves
2 - drawer sides
(1 left, 1 right)
Made in China - r06 Page 1 of 5
1 - drawer back
Customer Service 800.967.6696 | www.crateandbarrel.com
1 - drawer front
1 - drawer bottom
2 - doors
(1 left, 1 right)
STUDIO COMPACT OFFICE
A
fixed shelf
NOTE: Make sure threaded holes of each barrel nut is aligned with holes in panel edge.
B
partition
NOTE: Make sure arrows on each cam points towards nearest edge with holes.
1 A) Insert 4 cams and 4 wood dowels into fixed shelf as shown. Make sure arrows on each cam points towards nearest edge with holes. B) Insert 2 cam screws, 3 barrel nuts, and 2 wood dowels into partition as shown. Secure cam screws with a phillips head screwdriver. With a screwdriver, turn barrel nut so the threaded holes are aligned with holes in panel edge as shown.
A
right side panel
B
left side panel
2 A) Insert 5 wood dowels and 2 barrel nuts into right side panel as shown. B)Insert 2 barrel nuts, 5 wood dowels and 2 cam screws into left side panels as shown.
left side panel
fixed shelf
partition
3 Fit dowels of fixed shelf into left side panel and partition as shown. With a screwdriver, turn each cam clockwise until it securely engages each cam screw.
bottom panel
4 Fit dowels of assembled unit into corresponding holes of bottom panel. Insert 4 allen bolts into barrel nuts of assembled unit, using an allen wrench.
Made in China - r06 Page 2 of 5
Customer Service 800.967.6696 | www.crateandbarrel.com
STUDIO COMPACT OFFICE
back panel
5 Slide back panel thru grooves of left side panel of assembled unit as shown.
right side panel
A
B
6 A) Insert 1 allen bolt into barrel nut of partition. Secure bolt with an allen wrench. B) Fit dowels of right side panel into corresponding holes of assembled unit. Insert 2 allen bolts into barrel nuts of left side panel.
leg
8 Attach 4 legs to bottom panel with 2 allen bolts, 2 spring washers, and 2 flat washers per leg as shown. Secure bolts with an allen wrench.
top panel
9 Fit dowels of assembled unit into corresponding holes of top panel as shown.. Secure top panel with 6 small bolts, using a screwdriver.
Made in China - r06 Page 3 of 5
Customer Service 800.967.6696 | www.crateandbarrel.com
STUDIO COMPACT OFFICE
left and right doors
B
A
hinge
10 Attach 2 hinges to left and right doors with 3
screws per hinge as shown. Secure screws with a screwdriver.
drawer
A
front
A
B
11 A) Attach hinges of each door onto assembled unit with 6 screws per hinge as shown.
B) Attach pulls to left and right doors with 2 screws per pull as shown. Secure screws with a screwdriver.
left drawer
C
drawer front
side
B
drawer
left and right
B
drawer sides
right drawer
A
NOTE: Make sure threaded holes of each barrel nut is aligned with holes in panel edge.
12 A) Insert 4 barrel nuts into drawer front as shown. With a flathead screwdriver, turn nut so the threaded holes are aligned with holes in panel edge as shown. B) Insert 4 drawer barrel nuts into left and right drawer sides as shown.
Made in China - r06 Page 4 of 5
Customer Service 800.967.6696 | www.crateandbarrel.com
side
13 A) Attach right drawer side to drawer front and back with 4 large bolts as shown. Secure bolts with a screwdriver. B) Slide drawer bottom into grooves of drawer assembly as shown. C) Attach left drawer side to drawer assembly with 4 large bolts as shown.
bottom
drawer back
STUDIO COMPACT OFFICE
ORIENTATION FOR LETTER SIZE HANGING FOLDERS
ORIENTATION FOR LEGAL SIZE HANGING FOLDERS
A
A
B
B
14 Depending on the desired hanging file size (legal or letter), insert 2 file crossbars into corresponding slots of drawer assembly as shown.
15 A) Insert 1 screw into each hinge of assembled unit as shown. Secure screw with a screwdriver. B) Fit glides of drawer assembly into corresponding glides of assembled unit as shown.
A
A
B
adjustable shelves
17 A) Insert 8 shelf pins at desired shelf heights as shown. B) Place 2 adjustable shelves into assembled unit as shown. Make sure each shelf is securely supported by shelf pins. Assembly is now complete.
16 Fit pre-assembled glides of tray into corresponding glides of assembled unit as shown.
Made in China - r06 Page 5 of 5
Customer Service 800.967.6696 | www.crateandbarrel.com
CLEANING AND CARE
Clean surfaces with a dry or damp soft cloth. Do not use abrasive cleaners. Do not use furniture wax or polish as the wood is finished with a protective clear lacquer.
Loading...