Crate & Barrel Farrow 52 Media Console with Towers Assembly Instruction

FARROW 52” MEDIA CONSOLE
Thank you for purchasing the Farrow 52” Media Con­sole. This page lists all the contents included in the box.
Please take time to identify the hardware as well as the individual components of this product. As you unpack and prepare for assembly, place the contents on a carpeted or padded area to protect them from damage.
ASSEMBLY HARDWARE
26 - spring washers
18 - small screws
18 - small flat washers
8 - large screws
Missing hardware? Please call
800.606.6387 for replacements.
8 - large flat washers
18 - small bolts
WALL MOUNTING HARDWARE
4 - small screws
4 - large screws
2 - wall straps
4 - wall brackets
TOOLS REQUIRED
allen wrench (included)
phillips head screwdriver
(We recommened the use of hand tools instead power tools)
8 - shelf pins
8 - large bolts
4 - plastic anchors
COMPONENTS
1 - top panel 1 - front frame
2 - adjustable shelves
1 - bottom panel
2 - door fronts
1 - back panel
1 - partition
4 - feet
2 - side panels
(1 left, 1 right)
Made in Vietnam - r02 Page 1 of 4
Customer Service 800.967.6696 | Latest instructions available at www.crateandbarrel.com
FARROW 52” MEDIA CONSOLE
foot
NOTE: Make sure front crossbars of side panels are positioned towards each other as shown
partition
right side panel
NOTE: Do not over tighten the bolts
bottom panel
1 Place bottom panel onto a clean, padded surface. Attach 4 feet to bottom panel with 2 large bolts, 2 spring washers and 2 large flat washers per foot as shown. Secure, but do not over tighten, bolts using an
allen wrench.
NOTE: Make sure crossbar of top panel is positioned towards the front of assembly as shown.
top panel
B
left side panel
A
A
2 A) With assistance of another adult, position bottom panel as shown. Attach left and right side panels to bottom panel with 3 large screws per side as shown. Secure, but do not over tighten, screws using a phillips head screwdriver.
B) Attach partition to bottom panel with 2 large screws as shown.
front frame
3 Fit pre-assembled dowels of left/right side panels and partition into corresponding holes of top panel. Attach top panel to left/right side panels and partition with 6 small bolts, 6 spring washers and 6 small flat
4 With the assistance of another adult, position assembled unit upright. Attach front frame to assembled unit with 12 small bolts, 12 spring washers and 12
small flat washers as shown, using a screwdriver.
washers as shown, using a screwdriver.
Made in Vietnam - r02 Page 2 of 4
Customer Service 800.967.6696 | Latest instructions available at www.crateandbarrel.com
FARROW 52” MEDIA CONSOLE
back panel
A
A
B
adjustable shelf
5 Attach back panel to assembled unit with 18 small screws as shown, using a screwdriver.
LOCKED POSITION
UNLOCKED POSITION
door front
6 A) Insert 8 shelf pins at desired shelf heights. B) Place 2 adjustable shelves into assembly as shown. Make sure that each shelf securely supported by each shelf pin.
CLEANING AND CARE
Clean surfaces with a dry or damp soft cloth. Do not use abrasive cleaners. Do not use furniture wax or polish as the wood is finished with a protective clear lacquer.
7 Push pins on top and bottom of door front down so that they are in the unlocked position. Fit door front into back groove of assembled unit. Push pins up to secure. Repeat for remaining door front using the front groove of unit. Assembly is now complete.
Made in Vietnam - r02 Page 3 of 4
Customer Service 800.967.6696 | Latest instructions available at www.crateandbarrel.com
Loading...
+ 6 hidden pages