Customer Service 800-967-6696 | http://www.crateandbarrel.com
ARCHETYPE LARGE BOX WALL SHELF
Thank you for purchasing the Archetype Large Box
Wall Shelf. This page lists all the contents included in
the box. Please take time to identify the hardware as
well as the individual components of this product. As
you unpack and prepare for assembly, place the
contents on a carpeted or padded area to protect
them from damage.
TOOLS REQUIRED
Phillips head screwdriver
Drill & 3/16" diameter drill bit
Attach lock
sleeves in
this position
x 2
1 Align holes in 4 lock sleeves with 4 holes in each long
panel. Insert 1 lock screw through each sleeve and into
the long panel. Make sure to orient lock sleeves as shown.
Fully tighten each screw with a phillips head screwdriver.
Made in China - r04
HARDWARE
2 - drywall anchors
8 - lock sleeves 8 - lock screws
1 - wall template
2 - wall screws
Missing hardware?
Please call
800.606.6387 for
replacements.
COMPONENTS
2 - short panels
2 Align lock sleeves with holes in the short panels. Make
sure keyhole hanging hardware on each short panel faces
the same direction. Firmly press all panels together until the
assembly is secure.
2 - long panels
IMPORTANT NOTE:
Make sure the keyhole
hanging hardware on
each short panel faces
the same direction
Page 1 of 2
Customer Service 800-967-6696 | http://www.crateandbarrel.com
ARCHETYPE LARGE BOX WALL SHELF
WALL MOUNTING INSTRUCTIONS:
The wall mounting hardware included with this shelf
is intended for drywall installation only. Be sure to
use hardware appropriate for your wall type.
Whenever possible, fasten screws directly into a wall
stud.
If you are unsure about your wall type or what
mounting method you should use, consult a
qualified professional or your local hardware store.
3 A. Determine wall mounting location. Please note that box shelf can be
mounted horizontally or vertically. Tape wall template into position making
sure both holes are level.
B. If attaching directly to a wall stud, do not use the wall anchors. Fasten
each screw directly into the stud.
C. Drill a 3/16"diameter hole at each end of the template where indicated.
D. Remove wall template and insert a phillips head screwdriver into the
wall anchor and insert into the holes while turning each anchor clockwise.
Fully tighten until the anchor is seated flush with the surface of the wall.
E. With a screwdriver, insert the screw into the hole of the anchor. Leave
3/16" of the screw protruding out from the surface of the wall.
4 Carefully align keyhole hardware on back side of the
short panels with the protruding screws in the wall and fit
securely into place.
Installation is now complete.
Made in China - r04
B
A
C
D
CLEANING AND CARE
Clean surfaces with a dry or damp soft cloth. Do not use
abrasive cleaners. Do not use furniture wax or polish as the
wood is finished with a protective clear lacquer.
Page 2 of 2