INSTALLATION, OPERATING AND MAINTENANCE INSTRUCTIONS
Z9801P
Z9801PF
These instructions cover the
general notes for the following
Z9801P & Z9801PF 80mm
Series units;
• Flow management system for fan coil
units.
• Combines essential control components
and connecting pipework into one
compact, fully assembled unit ready
to connect.
• The 80mm Dominator Peak Pro is
compact and ultra lightweight.
• The bypass valve unit comprises two 3
Way Ball valves.
• Includes the Peak Pro (Pressure
Independent Control Valve) for
optimum flow control.
• The strainer unit has an integral filter and
pressure test point, plus drain cock/vent
facility.
SYSTEM COMPONENTS
For detailed installation, operating and maintenance instructions for the system components
that combine to make up the Z9801P/Z9801PF Series Dominator Peak Pro, please see the
relevant sections of our website as below:
CFS_Z9801_0219
??????_v?
CRANE HOUSE, EPSILON TERRACE,
WEST ROAD, IPSWICH,
SUFFOLK IP3 9FJ
TELEPHONE: +44 (0)1473 277300
FAX: +44 (0)1473 277301
EMAIL: enquiries@cranefs.com
www.cranefs.com
Every effort has been made to ensure that the information contained in
this publication is accurate at the time of publishing. Crane Ltd assumes
no responsibility or liability for typographical errors or omissions or
for any misinterpretation of the information within the publication and
reserves the right to change without notice.
• Designed and manufactured under quality management
systems in accordance with BS EN ISO 9001:2008
FM311 ISO 9001
For information on all other components and additional configurations please contact the
Crane Technical Support Desk at: tech-enquiries@technicalbsu.com
www.cranebsu.com
80mm SERIES
Z9801P
Z9801PF
D995 PEAK PRO PICV D901/D902 METERING STATION
INSTALLATION, OPERATING AND MAINTENANCE INSTRUCTIONS