Crane Dominator 80mm Series, Z9801PF, Z9801P Installation, Operation And Maintenance Instructions

INSTALLATION, OPERATING AND MAINTENANCE INSTRUCTIONS
Z9801P Z9801PF
These instructions cover the general notes for the following Z9801P & Z9801PF 80mm Series units;
units.
Combines essential control components
and connecting pipework into one compact, fully assembled unit ready to connect.
The 80mm Dominator Peak Pro is
compact and ultra lightweight.
The bypass valve unit comprises two 3
Way Ball valves.
Includes the Peak Pro (Pressure
Independent Control Valve) for optimum flow control.
The strainer unit has an integral filter and
pressure test point, plus drain cock/vent facility.
SYSTEM COMPONENTS
For detailed installation, operating and maintenance instructions for the system components that combine to make up the Z9801P/Z9801PF Series Dominator Peak Pro, please see the relevant sections of our website as below:
CFS_Z9801_0219
??????_v?
CRANE HOUSE, EPSILON TERRACE, WEST ROAD, IPSWICH, SUFFOLK IP3 9FJ
TELEPHONE: +44 (0)1473 277300 FAX: +44 (0)1473 277301 EMAIL: enquiries@cranefs.com
www.cranefs.com
Every effort has been made to ensure that the information contained in this publication is accurate at the time of publishing. Crane Ltd assumes no responsibility or liability for typographical errors or omissions or for any misinterpretation of the information within the publication and reserves the right to change without notice.
Designed and manufactured under quality management
systems in accordance with BS EN ISO 9001:2008
FM311 ISO 9001
For information on all other components and additional configurations please contact the Crane Technical Support Desk at: tech-enquiries@technicalbsu.com
www.cranebsu.com
80mm SERIES
Z9801P
Z9801PF
D995 PEAK PRO PICV D901/D902 METERING STATION
INSTALLATION, OPERATING AND MAINTENANCE INSTRUCTIONS
03
CRANE FLUID SYSTEMS DOMINATOR PEAK PRO 80MM SERIESCRANE FLUID SYSTEMS DOMINATOR PEAK PRO 80MM SERIES
02
INSTALLATION
The valve may be installed directly or remotely to a load (typically a Fan Coil Unit). The direction of flow should be such that the PICV is on the return from the load.
Temperature Range: -10 to 120*C | Pressure rating: PN16
MODES OF OPERATION
PREPARATION/FITTING
Steel tube: Cut square and de-burr internally and externally, thread to BS EN 10226-2 and fit
to Dominator using PTFE tape to BS7786:2006 or other recommended jointing compound. Other types of piping system can be used providing a suitable adaptor with a threaded end is utilised.
Whilst fitting pipe and/or adaptors it is important that the wrench is positioned close to the joint to be assembled, in order to avoid damaging the valve.
The Dominator Peak Pro shall be supported using proprietary mounting brackets or other suitable devices. This enables the pipework to be well supported and avoids undue strain on the joints of the Dominator Peak Pro.
OPERATION: BYPASS VALVE
The mode of operation has four primary modes of operation. it is factory set in Isolation / Flushing bypass mode. The mode of operation can be changed by operation of the ‘T@ balls as indicated in Figure 2.
ORIENTATION & HANDING
The Dominator has two unions fitted to allow for orientation and handing of the PICV, Strainer and Bypass valve.
MAINTENANCE
This valve is intended for group 2 liquids only, as defined by the pressure Equipment Directive 2014/68/EU.
For further assistance please call our technical helpline on +44 (0) 1473 277400 or email us at: enquireies@cranefs.com
Following a policy of continuous improvement, Crane Fluid Systems reserves the right to alter specifications shown in this document and the e-catalogue without prior notice.
INSTALLATION, OPERATING AND MAINTENANCE INSTRUCTIONSINSTALLATION, OPERATING AND MAINTENANCE INSTRUCTIONS
ISOLATION AND FLUSHING BYPASS
BACK FLUSHING
NORMAL OPERATION FORWARD FLUSHING
Loading...