CRRFT$1dI:IN
OPERATOR'S MANUAL
WORKBENCH
SAFETY WARNINGS AND CAUTIONS:
- DO NOT stand on this product. You may fall which may cause personal
injury.
. WEAR SAFETY GLASSES AND GLOVES when cutting the banding
material. The bands may snap which may cause personal injury.
• BE CAREFUL when opening more than one drawer. The product may
bccome trustable and tip, which may cause personal injury, or product
dmnage.
- DO NOT mount this product on a truck bed or any other moving object.
This may cause personal injury or product d,-a'nage.
• DO NOT step in the drawers. You may fall which may cause personal
injury,
• Appropriately secure this product before moving it with a forklift.
• DO NOT alter this product in any manner. For example, do not weld
external lockbars or attach eieeWical equipment. This may cause product
damage _r personal injury.
• Weight limit on the top of the workbench is i ,750 pounds. If the limit is
exceeded, the product could collapse and cause personal injmy or product
damage.
• DO NOT LIFT oil molded organizational Wayto move the workbench.
This may cause damage to the workbench.
In the United States Call 1-800-366-7278 for Service Paris. outside
the United St_es call your loe_ distributor. Refer to Service Parts l)nm:dng for full
listhag _" Service Parts.
CONGRATULATIONS: You are now the mt,_ter of the latest "Home and
Hobby Do It Yourself" Workbench. Some assembly is required before
you czzn enjoy this versatile workbenck.
CAUTION: Read and follow all Safety Rules and Operating
Instructions before first use of this product.
Sears, Roebuck and Co., Hoffman Estates, IL 60179, EE. E. F1020
7 ...............
WORKBENCH FEATURES
o REAR STORAGE TROUGH WITH PENCIL TRAY
• MOLDED ORGANIZATIONAL TRAY - INCLUDES CUP
HOLDER AND MOUNTS TO EITHER SIDE
• PARTS TRAYS CAN BE MOUNTED TO EITHER SIDE
° EASY TO ASSEMBLE
• COMFORTABLE WORK HEIGHT
• LARGE WORK SURFACE
• TWO LARGE DRAWERS
TOOLS REQUIRED TO ASSEMBLE YOUR WORKBENCH:
3/g" WRENCH SQUARE (CARPENTERS)
SL,1LEWDR1VER,FLA_ RUBBER MAILEI"
1/8" DRILl, BIT DRILL
SCREWDRIVER, PHKL,IPS TAPE MEASURE
*SEE EXPLODED VIEW OF ALL COMPONENTS*
VIEW SHOWS LEFT SIDE ORGANIZATIONAL TRAY
ATTACHMENT
STEP 1: REMOVE ALL PARTS FROM THE CARTON.
STEP 2: ASSEMBLE TilE FRAME.
• Using (32) #14-10 x 5/8 blunt tip screws _ssemble the shelf, right side, left
side, front rail and back rail. Finger tighten, then adjust for squareness.
• Rails are assembled with slots showing on the top side.
• Wrench tighten once the unit is squm'e. Tighteaa screws to 80 in/lbs.
NOTE: It is recommended that the shelf be installed with flanges up.
.... ;._ illlLg vd_l ..........
NOTE: USE THE ASSEMBLED FRAME AS A WORK SURFACE WHEN
ATI'ACHING Tim TOP COMPONENTS.
STEP 3: ATTACH STORAGE TROUGH_ TO WOODEN TOP.
STEP 5:
• The organizational tray can be attached to
either side of the WORK SURFACE. To
mount to
other side reverse the top.
• Slide the organizational tray into the storage
trough. Use three #10-24 x 13/4" carriage
bolts, 114" washers and #10-24 nuts to attach.
STEP 6: ATTACH ASSEMBLED TOP TO FRAME.
NOTE: Instructions to follow are for centering the wooden top on the flame.
The top may be positioned differently to suit your needs.
• Place the top onto the frame by lining up the four top holes of the pegboard
pattern located on the left side, with the four holes in the organizational tray.
(See Fig. 1)
• Using a tape measure, measure an equal distance from the frame to the edge
of the wooden top, across the fi'ont. This will ensure proper alignment.
• USING A PENCIL, MARK 21-1ESIX HOLE LOCNIlONS INSIDE THE
FRAME AND UNDER THE TOP.
(See Fig. 2 )
ATTACH ORGANIZATIONAL TRAY TO TOP AND
STORAGE TROUGH.
! "%N
Attach joint to the inside end of either storage trough.
Slide each storage trough onto the wo(._lentop from each end.
Caution: If attachment is too difficult lubricate the bottom of the storage
trough with petroleum jelly or a nomstain equivalent.
STEP 4: ATTACH END CAPS TO STORAGE
TROUGH.
• Slide storage troughs together into the joint.
• Use one #8-32 x _A" screw to attach each end cap.
• The end cap opposite the org_lizational tray location
will be flush to the wooden top.
Fig. 1 Eg. 2
NOTE: Using adequate help ,carefully tam the top upside down.
• Drill sixholes 114" deep using a 1/8" drill bit.
• Replace the top onto the fi'ame and attach with six #14-10 x 5/8" pointed tip
screws in the top, _uadfour #t4-10 x 5/8" pointed tip screws in the
organizational tray,
CAUTION: Do not over tighten screws in the wooden top.
STEP 7: ATTACH CENTER SUPPORTS AND STIFFENER.
• Using four #14-10 x 5/8" blunt tip screws,
hang the center support from the front and _o_,n- _ IL
back rails.
NOTE: The stiffener may attachto either side
of the center support.
HARDWAREREQUIRED
@ E_ HEX ,LEAD #14-10 x 5,."8" (QTY 48)
0 _;_> I-EX HEAD :_14-10 × 5/8" (QTY 10)
0 _CARRIAGE BOLT t;lO 24 £ 1 374"
I_ B NLrF _I0-24 (QTY 3)
(_) @2_> ROLND lEAD _8-32 x ]/2' (QTY 2)
( BLUNT ] IP)
(F_IItTED TIP)
_OTY a_
B FlAT WASFER 1/4 ° (QTY 3)
BACK
RAIL
ORGAN IZATI OI",IAL TRAY 8, TOP
(LEFT SIDE OP]-ION SHOWN)
STORAGE _ END CAP, RH
TROUGH (2) /
f-
/
/
JO INT
\
ST I FFENER
CENTER
S IDE, LH
(2) PARTS TRAY
"--.IL,J
%
FRONT
(4) WORKBENCH
SLIDE
6" DRAV6R (2)