CPS FlexOM Gateway V2 Quick Start Guide

Page 1
Quick Guide for FlexOM Gateway V2
4/13/2023 Revision 4
Page 2
Table of Contents
Product Features
Product Specifications
-- -- Dimensions and Interfaces
-- -- Typical System Design and Diagrams
-- -- Safety Precautions
Hardware Installation
-- -- List of Required Tools and Materials
-- -- Option 1: Internal Wire-box Installation
2
3
6
10
11
14
16
16
17
-- -- Option 2a: DIN Rail Side Mounting (in External DAS Box)
-- -- Option 2b: DIN Rail Flat Mounting (in External DAS Box)
-- -- 4G Cellular Antenna Installation (FlexOM-4G V2 only)
-- -- Daisy Chain Wiring
Using the CPS Connect Pro App
-- -- Check the Internet Connection
-- -- Modbus Device Settings
-- -- Modbus TCP
-- -- Reset / Restart
21
24
26
27
28
28
31
32
33
CPS Warranty Policy
34
Page 1
Page 3
Product Features
The FlexOM Gateway V2 is an IoT cloud-based gateway that allows the integration of various hardware and system scenarios
Connect multiple CPS inverters and other devices to a single RS485 daisy chain
RS485 pass-thru allows third-party controller to act as a client in parallel with the FlexOM Gateway V2
Enables diagnosis of RS485 wiring issues through the CPS FlexOM portal
Modbus TCP pass-thru (Third-party controllers can read/write commands to CPS inverters through Modbus TCP.)
Easy mass deployment and configuration via the CPS Connect Pro app using built-in BLE
Reduces the need for truck rolls via remote firmware updates
Page 2
Page 4
Product Specifications
RS485 Interface
No. of Ports
Protocol
Modbus RTU Mode
Terminator for RS485
Isolation
AUX Interface
No. of Ports
Protocol
Modbus RTU Mode
1 (A: 6-Pin Connector or B: 5-Pole Terminal Block)
Modbus RTU
Client
120 ohms
2.5 kV
1 (3-pole Terminal Block)
Modbus RTU
Server (RS485 Pass-thru)
Terminator for RS485
Isolation
Ethernet Interface
10/100BaseTX Ports (RJ45 connector)
Connect to the Cloud Applications
SCADA controllers on the same LAN subnet
120 ohms
2.5 kV
1
MQTT
Modbus TCP
Page 3
Page 5
Modbus TCP
Mode
Max. No. of Client Connections
Cellular Interface (FlexOM-4G V2 product only)
Cellular Standards
No. of SIM Slot
Cellular Antenna Connectors
Bluetooth Interface
Standard
Antenna
Server
2
LTE-FDD/LTE-TDD, WCDMA
1
1 SMA female
BLE 4.2
Built-in
Power Parameters
Input Voltage
Power Consumption
Power Connector
Environmental Limits
Operating Temperature
Storage Temperature
Ambient Relative Humidity
9 to 24 Vdc
2.5 W, Max. 5 W
Terminal Block
-30°C to 85°C (-22 to 185°F), Natural convection
-40 to 85°C (-40 to 185°F)
5 to 85% (non-condensing)
Page 4
Page 6
Physical Characteristics
Housing
IP Rating
Dimensions
Weight
Standards and Certifications (DoC)
CE-EMC
Plastic
IP 20
70 mm / 100 mm / 28 mm (2.76 in x 3.94 in x 1.10 in)
73g ( 0.16 lb )
EN 55032
EN 55035
EN 61000-3-2
EN 61000-3-3
CE-RED
CE-LVD
FCC SDoC
FCC ID
EN 301 908
EN 300 328
EN 301 489-1 / -17 / -52
EN 62368-1
EN 62368-1
Part 15B
Part 15C
Page 5
Page 7
Dimensions and Interfaces
0.83 in (21 mm)
Dimensions without DIN rail housing
1.26 in
(32 mm)
3.98 in (101 mm)
2.72 in (69 mm)
4.06 in
(103 mm)
Dimensions with DIN rail housing
Page 6
3.03 in
(77 mm)
Page 8
Dimensions and Interfaces
B
Vin GND A+ B- G
5-PIN Port B: External DAS box installation (see installation options 2a and 2b)
Caution:
If the length of either the cable connecting to the RS485 port or the AUX port of the gateway is over 1000 meters, the switch for the 120 ohm terminating resistor corresponding to the port must be set to ON.
Default
ON
1
Terminating Resistance Switch
Power Switch
A
Caution:
Before configuring the gateway, ensure the power switch is set to ON.
POWER ON
Module Socket
6-PIN Port A: Internal wire-box installation (see installation option 1)
Ethernet Port
Terminating Resistance Switch
AUX Port
A+ B- G
Page 7
Page 9
Dimensions and Interfaces
SIM Card Slot
Internet Interface: 4G wireless (FlexOM-4G V2 only)
Connector for 4G antenna
Internet Interface: Ethernet
Note:
Confirm the gateway model by checking the model number and SN listed on the label on top of the
gateway card.
The FlexOM Gateway V2 cards must have an Internet connection to enable remote data
communications via the CPS Portal.
The standard FlexOM Gateway V2 requires an Internet connection via the Ethernet port.
The FlexOM-4G Gateway V2 includes a pre-installed SIM card and 5-year 4G cellular plan.
The FlexOM-4G Gateway V2 may not use, be configued with, or be activated with a third-party
SIM card.
Page 8
Page 10
Dimensions and Interfaces
Internet Interface: Ethernet (FlexOM Gateway V2)
The FlexOM Gateway V2 requires a connection to the Internet using Ethernet. Any LAN
firewall ports must be opened before commissioning the FlexOM Gateway V2.
The following ports must be opened both ways (for incoming and outgoing
communications):
TCP 1884 with destination IP 47.254.52.209
(mqtt.chintpowersystems.com)
Internet Interface: 4G (FlexOM-4G Gateway V2 only)
The FlexOM-4G Gateway V2 includes a pre-installed SIM card and is compatible with
AT&T, T-mobile, and Verizon networks. The standard 4G cellular data plan period is 5
years.
Once the FlexOM-4G Gateway V2 is powered on and the 4G antenna has been installed
(see page 26), it will automatically select and connect to the provider network with the
strongest or most stable signal.
Page 9
Page 11
LED Indicators
APP Connect
Indicates whether the CPS Connect Pro app is connected to the gateway and whether the device is being configured
Light Off
Blink
Light On
BLE Hardware Error
No Active Connection
Phone Connected
RS485 Device
Indicates whether the RS485 devices are connected to the gateway and whether there is a RW command to the daisy chain being executed
Light Off
Found Nothing
Light On Some Devices Found
IP ACK
Indicates whether the gateway acknowledges and is connected to the CPS portal or target server via the Internet protocol (IP)
Light Off
Blink
Light On
Unable to connect to LAN router or 4G base station
Connected to a LAN router or 4G base station, but not yet connected to the target server
Connected to the target server
Page 10
Page 12
Typical System Design and Diagrams
The following diagrams in Figure 1: RS485 Pass-Through, Figure 2: Modbus/TCP
Pass-Through, and Figure 3: Multiple Devices Using One RS485 show the various options
for connecting and managing data transmission from the RTU devices (inverters, weather
instruments, etc.) to the CPS portal or an optional third-party data logger or SCADA.
The FlexOM Gateway V2 can be connected to a third-party datalogger/controller by
connecting RS485 cable to the AUX port to enable the equivalent of a direct transmission
connection with the daisy chain.
Inverters
RS485 Cable
B
5-PIN Port B: External DAS Box Installation
Model A Model A
A
6-PIN Port A: Internal Wire-Box Installation
RS485 Cable
Model A
Daisy Chain (up to 32 devices)
CPS Portal
3rd Party Data Logger / SCADA
3rd Party Portal
Figure 1: System Diagram for RS485 Pass-Through
Page 11
Page 13
Typical System Design and Diagrams
Modbus/TCP Pass-through
The FlexOM Gateway V2 can be used as a Modbus/TCP server when connected to a third-party SCADA system, and will forward various commands to the daisy chain.
Inverters
RS485 Cable
B
5-PIN Port B: External DAS Box Installation
Model A Model A
A
6-PIN Port A: Internal Wire-Box Installation
Model A
Daisy Chain (up to 32 devices)
CPS Portal
Ethernet Cable
3rd Party Data Logger / SCADA
3rd Party Portal
Figure 2: System Diagram for Modbus/TCP Pass-through
Page 12
Page 14
Typical System Design and Diagrams
Connecting Multiple CPS Inverters and Other Devices Using One RS485
The FlexOM Gateway V2 allows users to connect different CPS inverter models and third-party weather sensors (supplied by others) in the same daisy chain via RS485.
The default baud rate for theFlexOM Gateway V2 is 9600 baud. This setting can be changed manually. Ensure all devices in the RS485 daisy chain are set to the same baud rate.
Please check with CPS America regarding hardware compatibility prior to installation and commissioning. CPS Hotline (choose option #2): +1 855-584-7168
RS485 Cable
B
5-PIN Port B: External DAS Box Installation
Inverters
Model A Model B
A
Meter Weather
Sensor
Daisy Chain (up to 32 devices)
6-PIN Port A: Internal Wire-Box Installation
RS485 Cable
3rd Party Data Logger / SCADA
Figure 3: System Diagram for Multiple Devices Using One RS485
Page 13
CPS Portal
Page 15
Safety Precautions
NOTICE
Before performing operations, read through this manual and follow all the precautions included to prevent accidents. The safety precautions provided in this document do not cover all possible safety precautions. CPS shall not be liable for any consequence caused by the violation of the safety operation regulations and design, production, and usage standards.
Declaration
CPS shall not be liable for any consequence caused by any of the following events:
Transportation
The storage conditions do not meet the requirements specified in this document.
Violation of the operation instructions and safety precautions in this document for installation, cable connecting, and maintenance.
Operation in extreme environments which are not covered in this document.
Unauthorized modifications to the product or software code.
Installation or use in environments which are not specified in related international standards.
Changes or modifications not expressly approved by the party responsible for compliance could void the user's authority to operate the equipment.
Personnel Requirements
Only qualified electrical technicians are allowed to install and operate the FlexOM
Gateway V2.
Operation personnel should receive professional training.
Operation personnel should read through this document and follow all the precautions.
Operation personnel should be familiar with the safety specifications about the electrical system.
Operation personnel should understand the composition and working principles of the grid-tied PV power system and local regulations.
Page 14
Page 16
Safety Precautions
Installation
Ensure that the FlexOM Gateway V2 is not connected to a power supply and is not powered on before starting installation.
Ensure that all electrical connections comply with local electrical standards.
DANGER
High voltage may cause electric shock and serious injuries during FlexOM Gateway V2 operation.
Do not touch components such as AC cables, circuit breakers and connectors while the
FlexOM Gateway V2 is energized.
Maintain the FlexOM Gateway V2 with sufficient knowledge of this document and proper tools and testing equipment.
Before performing maintenance tasks, power off the FlexOM Gateway V2 and
perform lockout/tagout (LOTO) of the source circuit.
For personal safety, wear personal protective equipment (PPE), including insulated gloves and eye protection.
Page 15
Page 17
Hardware Installation
The FlexOM Gateway V2 card can be installed one of two ways:
Option 1: Attached internally to the existing communications board within the inverter wire-box
Option 2: Mounted via DIN rail to an external DAS box
In addition, a 4G cellular antenna must be installed in the FlexOM-4G Gateway V2 model, regardless of which installation option is selected from the list above.
FlexOM Gateway V2
Tools Required for Installation
-- #1 Phillips screwdriver (4” shank length)
Accessory Kit includes:
-- (3) M/F M3 x 12mm standoffs
-- (3) Pan Phillips M3 x 7mm screws
-- Flathead screwdriver (3/32” or 2.5 mm)
-- Hex driver (3/16” socket)
-- Wire strippers (30-14 AWG)
-- Wire cutters
-- (2) Flat Phillips M4 x 10mm screws
-- (1) 3-pin connector plug (3.5mm pitch)
-- (1) 5-pin connector plug (3.5mm pitch)
-- (1) DIN rail clip*
-- (1) Translucent cover and opaque base*
*Only required for installation option 2
Page 16
Page 18
Hardware Installation Option 1: Internal Inverter Wire-box Installation
The FlexOM Gateway V2 card can be installed inside the inverter wire-box with no external power source required. The card can be mounted within the wire-box for all CPS
inverters excluding the 250/275 kW and the legacy 36 kW inverter models.
Ensure that the inverter AC and DC switches are in
the OFF position before installing the FlexOM
Gateway V2 inside the inverter wire-box.
CPS Portal Primary MQTT
Inverter Inverter
RS485
When the inverters are monitored via the FlexOM Gateway V2, a unique RS485 address for each inverter must be assigned using the HMI (LCD or CPS Connect Pro app). Refer to the specific CPS inverter User Manual for instructions on setting and assigning the RS485 Modbus address.
Inverter
Router
Wire-Box
+ CPS Connect Pro App
The FlexOM Gateway V2 can support a maximum of up to 32 inverters or devices connected to the daisy chain network.
Page 17
Page 19
Hardware Installation Option 1: Internal Inverter Wire-box Installation
Inverter Communication Board
Remove the screws that attach the
1
inverter communication board in the wire-box using a #1 Phillips bit. Replace the screws with the stand­offs included in the accessories kit.
Repeat this process for each of the (3) screws and standoffs while keeping the communication board in place.
Inverter RS485 Port
Torque standoffs to 7 in-lbs using a
2
3/16” socket hex driver.
6-PIN Port A: Internal Wire-Box
A
Installation
3
After all standoffs have been inserted, install the FlexOM Gateway V2 by carefully aligning the 6-PIN Port A with the 6-PIN header in the upper left-hand corner of the communication board.
Install the (3) screws removed in step 1 into the standoffs to secure the FlexOM Gateway V2 in place and torque to 7 in-lbs using a #1 Phillips bit.
6-PIN Header
Page 18
Page 20
Hardware Installation Option 1: Internal Inverter Wire-box Installation
4
Connect the RS485 inverter daisy chain to the inverter communication board using pins A+, B-, and G in the Connector provided in the inverter accessories kit when mounting inside the inverter wire-box. Check the inverter User Manual for RS485 installation
instructions.
FlexOM Gateway V2 uses a two-wire Modbus RS485 multipoint serial line system.
Shielded, twisted pair, 22 AWG, stranded cable such as Belden 3106A is recommended for the daisy chain.
Once pins A+, B-, and G in the Connector are connected, then insert the Connector into the terminal block in the port on the bottom of the inverter communication board (behind the
FlexOM Gateway V2 as shown below).
If applicable, connect the 3rd Party Datalogger to the AUX port in the bottom left-hand corner of the FlexOM Gateway V2 using the 3-PIN
A+ B- G
RS485 3rd Party Data Logger
(connected to FlexOM
Gateway V2 card)
Use the Connector supplied in the inverter accessories
Connector provided in the accessories kit.
FlexOM
Gateway V2
Card
Inverter
Communication
Board
A+ B- G
RS485 Inverter Daisy Chain
(connected to inverter
communication board)
kit to connect to the RS485 daisy chain via the inverter communication board. This may be a 5-PIN, 6-PIN, or
8-PIN Connector depending on the inverter model.
Page 19
Page 21
Hardware Installation Option 1: Internal Inverter Wire-box Installation
NOTE: If connecting to the Internet via Ethernet, follow step 5 below. If connecting via 4G, skip to steps 1-3 on page 26 and return to this page to complete hardware installation by following step 6 below.
5
To connect to the Internet via Ethernet, insert the RJ45 LAN cable into the Ethernet port of the FlexOM Gateway V2.
The LAN connection must be able to access the Internet without port filtering behind the firewall (see note on page 9 regarding LAN firewall ports).
POWER ON
Power Switch
Ethernet Port
Turn the DC switch on the inverter into the ON position to power the inverter and
6
the FlexOM Gateway V2.
Ensure the Gateway Power Switch is set to ON and an LED indicator is ON before
7
closing the inverter wire-box enclosure.
Page 20
Page 22
Hardware Installation Option 2a: DIN Rail Side Mounting (in External DAS Box)
The FlexOM Gateway V2 card can also be installed inside an external DAS box and mounted with a DIN rail clip. Installation options 2a (side mounting) and 2b (flat mounting) on the following pages describe these steps.
#1 Phillips Screw Driver (4” shank length)
M4 Flat Head Screw
DIN rail Clip
2
Install the FlexOM Gateway V2 onto the base of the housing and tighten it at the positions shown in the figure with the standoffs provided in the accessories kit.
Cover
1
As shown in the figure, use a screwdriver to insert and secure the DIN rail clip and the upper cover of the housing together with M4 flat head screws.
Torque to 7 in-lbs using 3/16” socket hex driver.
Base
Page 21
Page 23
Hardware Installation Option 2a: DIN Rail Side Mounting (in External DAS Box)
3
Align and close the upper and lower housings according to the positions of the screw holes, and use a #1 Phillips screwdriver to fasten the two parts together with M3 screws.
To ground the FlexOM Gateway V2 once
4
5
installed in the DIN rail enclosure, clamp the ground wire into the screw at the position shown in the figure.
Mount the housing within the DAS box using the DIN rail clip.
Page 22
Page 24
Hardware Installation Option 2a: DIN Rail Side Mounting (in External DAS Box)
Connect the RS485 inverter daisy chain to the FlexOM Gateway V2 card using pins
6
A+, B-, and G in the 5-PIN Connector provided in the accessories kit.
FlexOM Gateway V2 uses a two-wire Modbus RS485 multipoint serial line system.
Shielded, twisted pair, 22 AWG, stranded cable such as Belden 3106A is recommended for the daisy chain.
Connect DC power to the FlexOM Gateway V2 card using pins Vin and GND in the
5-PIN Connector provided in the accessories kit, then insert the Connector into the 5-PIN Port B as shown below.
5-PIN Port B: External DAS Box
B
Installation
POWER ON
Vin GND A+ B- G
RS485 Inverter Daisy Chain
NOTE: If connecting to the Internet via Ethernet, follow step 7 below. If connecting via 4G, skip to steps 1-3 on page 26 and return to this page to complete hardware installation by following step 8 below.
Power Switch
Ethernet Port
To connect to the Internet via Ethernet, insert the RJ45 LAN cable into the Ethernet port
7
of the FlexOM Gateway V2.
The LAN connection must be able to access the Internet without port filtering behind the firewall (see note on page 9 regarding LAN firewall ports).
Ensure the Gateway Power Switch is set to ON and an LED light is ON and visible before
8
closing the DAS box enclosure.
Page 23
Page 25
Hardware Installation Option 2b: DIN Rail Flat Mounting (in External DAS Box)
1
Put the parts in position in the order of a, b, c, and tighten the corresponding screws and standoffs.
Torque to 7 in-lbs using 3/16” socket hex driver.
a
DIN Rail Clip
b
c
M4 Flat Head Screw
12mm Standoffs
2
To ground the FlexOM Gateway V2 once installed in the DIN rail enclosure, clamp the ground wire into the screw at the position shown in the figure.
3
Mount the housing within the DAS box using the DIN rail clip.
Page 24
Page 26
Hardware Installation Option 2b: DIN Rail Flat Mounting (in External DAS Box)
Connect the RS485 inverter daisy chain to the FlexOM Gateway V2 card using pins
4
A+, B-, and G in the 5-PIN Connector provided in the accessories kit.
FlexOM Gateway V2 uses a two-wire Modbus RS485 multipoint serial line system.
Shielded, twisted pair, 22 AWG, stranded cable such as Belden 3106A is recommended for the daisy chain.
Connect DC power to the FlexOM Gateway V2 card using pins Vin and GND in the
5-PIN Connector provided in the accessories kit, then insert the Connector into the 5-PIN Port B as shown below.
5-PIN Port B: External DAS Box
B
Installation
POWER ON
Power Switch
Vin GND A+ B- G
RS485 Inverter Daisy Chain
NOTE: If connecting to the Internet via Ethernet, follow step 5 below. If connecting via 4G, skip to steps 1-3 on page 26 and return to this page to complete hardware installation by following step 6 below.
Ethernet Port
5
To connect to the Internet via Ethernet, insert the RJ45 LAN cable into the Ethernet port of the FlexOM Gateway V2.
The LAN connection must be able to access the Internet without port filtering behind the firewall (see note on page 9 regarding LAN firewall ports).
Ensure the Gateway Power Switch is set to ON and an LED light is ON and visible before
6
closing the DAS box enclosure.
Page 25
Page 27
Hardware Installation 4G Cellular Antenna Installation (FlexOM-4G V2 only)
Screw one end of the antenna cable into the cable connector of the gateway (applicable to FlexOM-4G model only).
Pass the SMA end of the coaxial antenna cable through the disassembled cable gland
Before closing the cover of inverter wire-box or external DAS box, check again that the gateway’s power switch is set to ON.
POWER ON
3
2e
2d
parts in sequence, then tighten the cable glands again.
Mount the 4G antenna as high as possible on a metallic structure.
2c
2b
2a
FlexOM-4G Gateway V2 Accessory Kit includes (in addition to standard accessories):
-- (1) IP65 4G cellular antenna
-- (1) Antenna coaxial cable (3m)
-- (1) Cable gland
-- (1) Antenna mounting bracket
-- (1) Pre-installed SIM chip
1
Screw the N-Type end of the coaxial antenna cable into the antenna.
Page 26
Page 28
Daisy Chain Wiring (All FlexOM V2 Models and Configurations)
FlexOM Gateway V2 uses a two-wire Modbus RS485 multipoint serial line system. Shielded,
twisted pair, 22 AWG, stranded cable such as Belden 3106A is recommended for the daisy chain.
Ensure that all devices in the daisy chain are properly connected according to each device’s 5-PIN or 3-PIN terminal block as shown in the diagram below.
Note that the daisy chain must be connected to the terminal block in the inverter communication board for internal wire-box installation (see installation option 1) or to the 5-PIN terminal block in the FlexOM Gateway V2 for external DAS box installation (see installation options 2a and 2b).
Vin GND A+ B- G
RS485 Cable
5-Pole RS485 Port B Terminal Block on gateway or on the inverter’s communications board
A+ B- G
Inverters
Model A Model B
Daisy Chain
3-Pole AUX port Terminal Block on gateway or on the inverter’s communications board
Meter
RS485 Cable
Weather
Sensor
Page 27
3rd Party Data Logger / SCADA
Page 29
Using the CPS Connect Pro App
Scan the QR code with a mobile phone to complete the CPS
Connect Pro app download and installation.
Or search for “CPS Connect Pro” in the Apple Store (iOS) or the Google Play Store (Android).
The screenshots shown in the following pages are from the iPhone version of the CPS Connect Pro app. The Android user interface may look slightly different but the setup procedure will be the same as shown.
Page 28
Page 30
Check the Internet Connection
NOTE: No WiFi dongle is required to interface or activate the FlexOM Gateway V2. The Gateway will connect to the Internet via Ethernet or 4G, and the Gateway will connect to the CPS Connect Pro app via Bluetooth.
Make sure your phone can connect to the Internet when you run the app for the first time. The CPS Connect Pro app needs to sync important data from the cloud.
Click "smart link" and the app will prompt you to obtain some phone permissions. If there is no abnormal prompt, click "next" in the upper-right corner to proceed.
Page 29
Page 31
During the process of connect­ing and entering the gateway configuration interface, the CPS
Connect Pro app will prompt
detailed information in case of
SN barcode The BLE name includes the SN
The gateway SN is included in the BLE signal name, and the app will list the scanned signals. Select the SN consistent with the target gateway label and click to enter.
any abnormality. This feature makes it easy for users to diagnose problems.
Page 30
Page 32
Connecting the gateway to the Internet is the most important step.
During the activation process, once the gateway is powered on it will attempt to connect to the Internet via 4G by default. If this attempt fails, it will automatically attempt to connect via Ethernet.
The gateway may also be manually configured to connect via Ethernet. To switch from a 4G to an Ethernet connection, click on "Internet Settings" and select "Ethernet.
Enter the correct Ethernet IP information and click “Save” in the upper right corner.
If the Status is displayed as “Online” the gateway is connected to the target server.
When the gateway status becomes “Online” the gateway will automatically create related objects on the portal, and the administrator can remotely set the required parameters.
Page 31
Page 33
Modbus Device Settings
The gateway is configured with a default modbus ID range.
Click "Scan Daisy Chain" and the gateway will scan the daisy chain.
After scanning, a device list will appear with the default ID.
The user can either rescan the target IDs individually in the list, or scan the daisy chain in full.
By clicking “Modbus ID Range” the user can manually edit the modbus ID range.
The existing modbus ID must be deleted by clicking the minus-sign button before a new ID can be assigned.
A unique Modbus ID must be assigned to each inverter.
Once all Modbus devices have been found and identified, click “Save” in the upper right corner.
Page 32
Page 34
Completing Installation
After configuring Modbus settings, the site name, gateway name, country, and time zone may all be specified within the CPS Connect Pro app.
To finalize all settings and complete installation, click “Next.” A new window with the message “Installation Success” will appear.
Once the FlexOM Gateway V2 or FlexOM-4G Gate-
way V2 is installed and activated, it is recommended
to contact the CPS Hotline to request confirmation that the gateway and attached RTU devices are populated in the CPS Monitoring Portal.
CPS Hotline (choose option #2): +1 855-584-7168
Reset / Restart
To restart or reset the FlexOM Gateway V2 and clear all current setting parameters, select “More..” from the main menu. The Settings menu shown on the left will appear.
Clicking "Reset" will clear all the current FlexOM
Gateway V2 setting parameters and restore the
factory settings.
Clicking "Reboot", will automatically power off and restart the FlexOM Gateway V2 without changing the current setting parameters.
Page 33
Page 35
CPS Warranty Policy
The warranty policy of this product is specified in the contract; otherwise, the standard warranty is
2 years.
For service, Chint Power Systems America will provide local support.
For warranty terms, please refer to the CPS America accessories warranty policy in place at time of
purchase.
If your product requires troubleshooting or warranty service, contact your installer or dealer. If you
are unable to contact your installer or dealer, or the installer or dealer is unable to provide service,
contact the CPS America hotline: +1 855-584-7168
Page 34
Page 36
Page 35
Service Hotline: 855-584-7168
CHINT POWER SYSTEMS AMERICA CO., LTD.
Email: AmericaSales@chintpower.com
Website: www.chintpowersystems.com
Loading...