CORNING CCH-CS, CCH-CF Quick Start Manual

Page 1
Splice Cassette (CCH-CS) and Termination Cassette (CCH-CF) for CCH and WCH
003-895, Issue 4
related literature | Search www.corning.com/opcomm. Click on “Resources/Standard Recommended Procedures.”)
003-876-QSG Closet Connector Housing (CCH) 1U/2U/3U Quick Start Guide 003-876-QSG-FR Closet Connector Housing (CCH) 1U/2U/3U Quick Start Guide (French) 003-876 Instruction, Closet Connector Housing (CCH) 1U/2U/3U 003-877-QSG Closet Connector Housing (CCH) 4U Quick Start Guide 003-877-QSG-FR Closet Connector Housing (CCH) 4U Quick Start Guide (French) 003-877 Instruction, Closet Connector Housing (CCH) 4U
Table of Contents
1. Precautions ................................................................. 1
2. Carton Contents .............................................................. 2
3. Preparing Housings for Cassette Installation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
4. Splice Cassette (CCH-CS) Installation — Tight Buffer or Loose Tube Fiber ................ 6
5. Splice Cassette (CCH-CS) Installation — Ribbon Fiber ............................... 9
6. Termination Cassette (CCH-CF) Field Termination — Tight Buffer Cable ................. 12
7. Termination Cassette (CCH-CF) Field Termination — Loose Tube/Ribbon or 250 µm Cable .. 12
1. Precautions
WARNING: Never look directly into the end of a ber that may be carrying laser light. Laser
light can be invisible and can damage your eyes. Viewing it directly does not cause pain. The iris of the eye will not close involuntarily as when viewing a bright light. Consequently, serious damage to the retina of the eye is possible. Should accidental eye exposure to laser light be suspected, arrange for an eye examination immediately.
WARNING: DO NOT use magniers in the presence of laser radiation. Diffused laser light can
cause eye damage if focused with optical instruments. Should accidental eye exposure to laser light be suspected, arrange for an eye examination immediately.
CAUTION: Recommend the use of safety glasses (spectacles) conforming to ANSI Z87, for eye
protection from accidental injury when handling chemicals, cables, or working with ber. Pieces of glass ber are very sharp and have the potential to damage the eye.
CAUTION: The wearing of cut-resistant safety gloves to protect your hands from accidental injury when using sharp-bladed tools and armored cable is strongly recommended. Use extreme care when working with severed armor. There will be a sharp edge where armor is cut. To minimize the chance of injury from the cut armor, cover the exposed edge with a wrap of electrical tape. To minimize the chance of injury from sharp-bladed tools, always cut away from yourself and others. Dispose of used blades and armor scrap properly.
CAUTION: Cleaved or broken glass bers are very sharp and can pierce the skin easily. Do not let these pieces of ber stick to your clothing or drop in the work area where they can cause injury later. Use tweezers to pick up cleaved or broken pieces of glass bers and place them on a loop of
tape kept for that purpose alone. Good housekeeping is very important.
STANDARD RECOMMENDED PROCEDURE 003-895 | ISSUE 4 | OCTOBER 2017 | PAGE 1 OF 12
Page 2
2. Carton Contents
2.1 CCH-CS:
• (1) Instruction, Splice Cassette for CCH Housings
• (2) Track, CCX-04U Housing / Module
• (1) Assembly, Back Stacker, CCH-01U, 02U, 03U
• (1) Base, Module
• (1) Cover, Module
• (1) Splice Tray, Module
• (1) Splice Holder, Module
• (1) Ribbon Tube
• (2) Tubing, Heatshrink, 2-in LG (used in Section 5.1, Step 8.)
• (1) Adapter, Tube (slit), 1/2-in, OD .300-inch, ID .170-inch
• (1) Splice Protector (Heatshrink) (T), IF, 12/pk (60mm)
• (4) Cable Tie, 1/8 x 4-in, white
• (1) Tubing, Braided, 1/4-in, FR PET, black (used in Section 4.3, Step 10 on right, and Section 5.2, Step 18)
2.2 CCH-CF
• (1) Instruction, Splice Cassette for CCH Housings
• (2) Track, CCX-04U Housing / Module
• 1) Assembly, Back Stacker, CCH-01U, 02U, 03U
• (1) Base, Module
• (1) Cover, Module
• (4) Cable Tie, 1/8 x 4-in, white
• (1) Tubing, Braided, 1/4-in, FR PET, black (used in Section 4.3, Step 10 on right, and Section 5.2, Step 18)
STANDARD RECOMMENDED PROCEDURE 003-895 | ISSUE 4 | OCTOBER 2017 | PAGE 2 OF 12
Page 3
3. Preparing Housings for Cassette Installation
3.1 Cassette Installation in CCH-01U, CCH-02U, or CCH-03U Closet Connector
Housing
Install rear stacker. Slide
4
into keyhole.
Slide covers
2 3
apart to remove.
1
Open front and back doors.
Remove:
4 Panel Clips
2 Blank Panels
TPA-3943
8 Routing Guides
1 Strain-relief Bracket
NOTE: FINAL ROUTING AND
INSTALLATION
7
8
60 cm
(24 inches)
60 cm
(24 inches)
STANDARD RECOMMENDED PROCEDURE 003-895 | ISSUE 4 | OCTOBER 2017 | PAGE 3 OF 12
6
5
TPA-3943
Page 4
3.2 Cassette Installation in CCH-04U Closet Connector Housing
Remove:
Open front and rear doors.
1
Remove:
2
12 Blank Panels
Remove:
3
24 Panel Clips
4
NOTE: FINAL ROUTING AND
Install: 12 Tracks in base
INSTALLATION
5
TPA-3943
8 Routing Guides
TPA-3944
Install:
7
10 Tracks in roof
6
9
Install cassettes (up to 12).
8
110 cm
(44
inches)
10
TPA-3945
STANDARD RECOMMENDED PROCEDURE 003-895 | ISSUE 4 | OCTOBER 2017 | PAGE 4 OF 12
Page 5
3.3 Preparing Splice Cassette
Single-fiber Orientation Mass Fusion Ribbon Orientation
NOTE: Rotate splice organizer 90-degrees from its factory-installed orientation meant for single bers to the orientation shown for ribbon ber splices.
1
TPA-3949
Remove cover.
Rotate organizer, if required.
3
Flex organizer to reinstall.
90°
TPA-3840
2
4
Organizer installed in orientation for ribbon storage.
TPA-3940
STANDARD RECOMMENDED PROCEDURE 003-895 | ISSUE 4 | OCTOBER 2017 | PAGE 5 OF 12
Page 6
4. Splice Cassette (CCH-CS) Installation — Tight Buffer or Loose
TPA-3930
Tube Fiber
4.1 Fiber Routing
1
NOTE: If using pigtail panels, remove the MIC
jacketing from the cable rst.
2
TPA-3928
3
Total Length:
NOTE: Be sure not to pinch bers when installing the tray
5
70 cm
27 inches
4
TPA-3929
STANDARD RECOMMENDED PROCEDURE 003-895 | ISSUE 4 | OCTOBER 2017 | PAGE 6 OF 12
Page 7
6
8
(130 inches)
TPA-3931
7
4.2 Incoming Cable Preparation
Strip Lengths for Splicing
1U/2U/3U Housing
4U Housing
TPA-3951
Strain-relief
Point
60 cm (24 inches)
210 cm (82 inches)
10
280 cm
(110 inches)
330 cm
9
TPA-3932
120 cm (48 inches)
120 cm (48 inches)
STANDARD RECOMMENDED PROCEDURE 003-895 | ISSUE 4 | OCTOBER 2017 | PAGE 7 OF 12
Page 8
4.3 Splicing Tight Buffer or Loose Tube Fiber
Cut to:
1
120 cm (48 inches) - 250 micron 90 cm (35 inches) - 900 micron
3
2
4
Strain-relieve to end of incoming cable.
Fold fiber over into cassette
5
and store under flanges.
TPA-3933
Repeat Step 5 on the other side of cassette. Loop and store all fiber under flanges.
6
TPA-3934
Replace cover.
7
Cover
8
STANDARD RECOMMENDED PROCEDURE 003-895 | ISSUE 4 | OCTOBER 2017 | PAGE 8 OF 12
Close cover.
9
TPA-3935
Page 9
TPA-3950
Store up to 96.5 cm (38 inches) of cable slack under cassette.
23 cm
(9 inches)
1
Cut 23 cm (9 inches) of protective tubing.
10
Tight-buffer Fiber
Protect tight-buffer fiber with braided tubing, if
Loose Tube Fiber
needed, for multiple cables or 24-fiber cables.
5. Splice Cassette (CCH-CS) Installation — Ribbon Fiber
5.1 Ribbon Fiber Preparation and Routing
Cut 23 cm (9 inches) of protective tubing.
1
2
TPA-3937
STANDARD RECOMMENDED PROCEDURE 003-895 | ISSUE 4 | OCTOBER 2017 | PAGE 9 OF 12
CRITICAL STEP: Slide tubing onto ribbon up to the fan-out body.
23 cm
(9 inches)
Ribbon Pigtail
Page 10
1
Strip Lengths
2
TPA-3928
Capture fibers and ribbon under flanges.
5
TPA-3939
Press plungers to install
8
adapter panel.
9
Ensure slack is properly managed.
5.2 Incoming Cable Preparation
Strain-relief
for Splicing
1U/2U/3U Housing
Point
6
60 cm (24 inches)
280 cm
(110 inches)
7
TPA-3938
10
TPA-3939
120 cm (48 inches)
TPA-3951
STANDARD RECOMMENDED PROCEDURE 003-895 | ISSUE 4 | OCTOBER 2017 | PAGE 10 OF 12
4U Housing
210 cm (82 inches)
120 cm (48 inches)
330 cm
(130 inches)
Page 11
1
Route as shown.
2
Bring pigtail ribbon from bottom layer into top layer.
Route as
6
shown.
Apply heat to heatshrink tube.
3
Slide heatshrink tube onto ribbon up to jacket.
4
9
Splice per the instructions provided with the splice equipment.
7
Place ribbons in tube; secure with cable tie.
10
Route as shown.
5
11
14
Store ribbon in slack storage area on bottom layer.
Route ribbon to bottom layer.
Store heatshrink tubing in splice organizer.
Replace and close cover.
12
13
8
Cut ribbons in center of organizer.
TPA-3941-2
Loosely secure ribbon with cable tie.
STANDARD RECOMMENDED PROCEDURE 003-895 | ISSUE 4 | OCTOBER 2017 | PAGE 11 OF 12
TPA-3942
Page 12
6. Termination Cassette (CCH-CF) Field Termination — Tight Buffer
TPA-4228
23 Inches
Cable
7. Termination Cassette (CCH-CF) Field Termination — Loose Tube/ Ribbon or 250 µm Cable
34 inches
TPA-3946
Corning Optical Communications LLC • PO Box 489 • Hickory, NC 28603-0489 USA 800-743-2675 • FAX: 828-325-5060 • International: +1-828-901-5000 • www.corning.com/opcomm
Corning Optical Communications reserves the right to improve, enhance, and modify the features and specications of Corning Optical Communications products without prior notication. A complete listing of the trademarks of Corning Optical Communications is available at www.corning.com/opcomm/trademarks. All other trademarks are the properties of their respective owners. Corning Optical Communications is ISO 9001 certied. © 2011, 2017 Corning Optical Communications.
All rights reserved.
STANDARD RECOMMENDED PROCEDURE 003-895 | ISSUE 4 | OCTOBER 2017 | PAGE 12 OF 12
Loading...