Coops & Feathers COFE1013 Installation & Assembly

A
B
C
Chicken Play Center Large
ASSEMBLY INSTRUCTIONS
3
"
1
1
2
42 pcs
4
1
"
8 pcs
4
1
"
2 pcs
2
D
E
F
4 pcs
1
1"
"
2
8 pcs
4 pcs
G
Model# 250-72
1 pcs
BACK LEFT
4
LEFT END
BASE
LEFT DECK
11
17
1
FRONT LEFT
BOTTOM FRAME
SUPPORT
FRAME
2
BASE
7
12
FRONT DECK
SUPPORT
FRAME SIDES
13
x2
CENTER DECK
SUPPORT
18
3
x4
UPPER
8
x2
BOTTOM FRAME
x2
TOP
FRAME PERCH
CENTER
SUPPORT
14
RIGHT END
BASE
19
FRONT RIGHT
UPPER RIGHT
REAR SUPPORT
DON’T BUILD THIS IN YOUR KITCHEN! IT WON’T FIT THROUGH THE
1
DOOR. SINCE THE CHICKEN PLAY ACTIVITY CENTER IS LARGE ONCE CONSTRUCTED, WE SUGGEST YOU BUILD EITHER OUTSIDE OR IN YOUR GARAGE OR BARN. IDENTIFY ALL PARTS AND HARDWARE THAT ARE INCLUDED WITH YOUR ACTIVITY CENTER. GRAB A SCREWDRIVER (OR HAND DRILL), A RUBBER MALLET AND IF YOU HAVE A CLAMP, IT WOULD BE HANDY. FIND A LEVEL PLACE TO BUILD IT AND AN EXTRA SET OF HANDS WOULD ALWAYS BE HELPFUL. START BUILDING!
YOU ARE GOING TO BUILD THIS ACTIVITY CENTER IN SECTIONS AND WILL BE STARTING WITH THE LEFT SIDE. GET PARTS #1-#6 AND SET THEM
AS THE IMAGE SHOWS. MATCH UP NOTCHES BEFORE INSERTING ANY OF THE PIECES TOGETHER.BEING THIS IS THE
2
PIECES ARE GOING TO FIT VERY SNUG, SO ENSURING IT IS SET SQUARE AND GENTLY USING A RUBBER MALLET MIGHTHELP.
PLACE #1 LEFT END BASE WITH THE TWO NOTCHES CLOSER TO THE GROUND FLAT AND INSERT #2 BACK LEFT BASE
A.
(NOTCH FACING FORWARD AND CLOSE THE GROUND) INTO #1 WITH THE TONGUE AND GROVE TOWARDS THE BACK. INSERT TWO #A SCREWS THROUGH PRE-DRILLED HOLES AND SECURE.
ALIGN ONE #3 UPPER FRAME SIDE ON THE BACKSIDE OF #2 AND SECURE WITH ONE #A SCREW ON THE
B.
BACK AND ONE #A ON THE SIDE. REPEAT WITH SECOND #3 UPPER FRAME SIDE BEHIND THE CENTER NOTCH ON #1 AND SECURE WITH ONE #A SCREW. (NOTE-THE OTHER TWO #3 UPPER FRAME SIDES AND ONE #4 TOP FRAME PERCH WILL BE USED ON THE OPPOSITE SIDE OF THE CENTER-SO SET THOSE ASIDE FOR NOW.)
REST #4 TOP FRAME ON TOP OF #3 SUPPORTS AND SECURE ONE #A SCREWS ON EACH SIDE THROUGH
C.
TOP PRE-DRILLED HOLES.
SECURE #5 BACK LEFT CENTER FRAME SUPPORT ON TOP FAR RIGHT OF #2. ENSURE THE PREDRILLED
D.
HOLES ARE LEFT SIDE FACING.
TAKE #6 UPPER LEFT REAR SUPPORT AND INSERT TONGUE/GROOVE END INTO #3 WITH NOTCH
E.
FACING FORWARD. SECURE #6 INTO #5 THROUGH THE PRE-DRILLED HOLE IN THE BACK USING ONE #B SCREW. THEN SECURE WITH ONE SCREW #A THROUGH THE PRE-DRILLED HOLE ON #3.
BOTTOM FRAME
SUPPORT
RIGHT FRONT
CENTER SUPPORT
23
DECK PLATFORM
5
CENTER FRAME
SUPPORT
9
LEFT FRONT
BOTTOM SUPPORT
15
BACK RIGHT
BASE
RIGHT DECK
20
FRAME
24
x2
LADDER
A
.
3
A
A
A
B
21
x4
SWING
SIDE
4
.
A
A
UPPER LEFT TOP FRAME
SUPPORT
10
x2
16
CENTER SUPPORT
HANGING TREAT
OF THE UNIT, THESE
BASE
A
.
1
x8
x1
6
CENTER
TOP SUPPORT
BACK RIGHT
22
x2
SWING
SEAT
25
BASKET
39
3
6
.
B
A
2
.
.
5
A
3
GET PARTS #7 FRONT LEFT BOTTOM FRAME SUPPORT & #8 CENTER BOTTOM FRAME SUPPORT. SET #7 WITH TONGUE AND GROOVE SIDE TO THE LEFT AND THE NOTCH ON RIGHT SIDE FACING UP. INSERT #8 TONGUE AND GROVE INTO SLOT ON BACKSIDE OF #7. SECURE WITH ONE SCREW #A.
TAKE BUILT SECTION AND INSERT TONGUE AND GROVE END OF #7 INTO NOTCH ON
A.
#1 LEFT END BASE AND TONGUE AND GROOVE END OF #8 INTO #2 REAR LEFT END BASE. SECURE WITH TWO #A SCREWS INTO THE OUTSIDE OF EACH END THROUGH PRE­DRILLED HOLES THAT HAVE BEEN INSERTED.
A
.
1
2
.
.
.
A
A
x3
.
7
A
4
4
.
LOCATE PART #9 LEFT FRONT CENTER SUPPORT AND ONE #10 CENTER TOP SUPPORT, INSERT #10 TONGUE AND GROOVE END INTO #9 AND SECURE WITH ONE SCREW #A INTO OUTSIDE PRE-DRILLED HOLE.
TAKE BUILT SECTION AND INSERT TONGUE AND GROOVE END OF #9 AND
A.
INSERT INTO #3 AND THE OTHER TONGUE AND GROOVE END OF #10 INTO #6. SECURE WITH TWO SCREWS #A INTO EACH END.
A
.
.
3
A
.
9
.
A
x4
A
5
GET PART #11 LEFT DECK FRAME AND INSERT THE TONGUE AND GROOVE BOTTOM INTO THE FAR-RIGHT SECTION TOP OF #7. SECURE BACK OF #11 LEFT DECK SUPPORT THROUGH PRE-DRILLED HOLE OF #9 WITH ONE SCREW #B.
TAKE #12 FRONT DECK SUPPORT AND INSERT INTO NOTCHED FRONT TOP
A.
SECTION WITH THE PRE-DRILLED HOLE FACING DOWN. SECURE WITH ONE SCREW
A
A
A
#A.
GET #13 CENTER DECK SUPPORTS (TWO) AND INSERT EACH NOTCHED AREAS OF
B.
#11 WITH ONE SCREW #A FOR EACH.
LEFT SIDE IS COMPLETE FOR NOW. SET ASIDE AND GET READY FOR THE RIGHT!
C.
A
B
x4 x1
PLACE #14 RIGHT END BASE WITH THE TWO NOTCHES CLOSER TO THE GROUND FLAT AND INSERT #15 BACK RIGHT BASE (NOTCH FACING FORWARD AND CLOSE THE GROUND) INTO #1 WITH THE TONGUE AND GROVE
6
TOWARDS THE BACK. INSERT ONE #A SCREW THROUGH PRE-DRILLED HOLE AND SECURE.
ALIGN ONE #3 UPPER FRAME SIDE ON THE BACKSIDE OF #2 AND SECURE WITH ONE #A SCREW. REPEAT
A.
WITH SECOND #3 UPPER FRAME SIDE BEHIND THE CENTER NOTCH ON #1 AND SECURE WITH ONE #A SCREW ON THE BACK AND ONE #A SCREW O THE SIDE.
REST #4 TOP FRAME ON TOP OF #3 SUPPORTS AND SECURE ONE #A SCREWS ON EACH SIDE THROUGH TOP
B.
PRE-DRILLED HOLES.
SECURE #16 BACK RIGHT CENTER FRAME SUPPORT DOWN INTO NOTCHED AREA ON TOP FAR LEFT OF #15.
C.
SECURE WITH ONE SCREW #A THROUGH PRE-DRILLED HOLE ON BOTTOM.
TAKE #17 UPPER RIGHT REAR SUPPORT AND INSERT TONGUE/GROOVE END INTO #3 WITH NOTCH FACING
D.
FORWARD ON RIGHT. SECURE #17 INTO #16 THROUGH THE PRE-DRILLED HOLE IN THE BACK USING ONE #B SCREW. NEXT SECURE WITH ONE SCREW #A THROUGH THE PRE-DRILLED HOLE ON #3.
A
x8
B
x1
13
12
.
.
.
.
16
13
.
.
8
A
.
.
10
.
6
B
9
.
.
7
.
11
A
A
A
B
4
.
.
3
.
.
17
A
15
.
3
.
.
14
A
A
A
A
A
7
GET PARTS #18 FRONT RIGHT BOTTOM FRAME SUPPORT AND #8 CENTER BOTTOM FRAME SUPPORT. SET #18 WITH TONGUE AND GROOVE SIDE TO THE RIGHT AND THE NOTCH ON LEFT SIDE FACING UP. INSERT #8 TONGUE AND GROVE INTO SLOT ON BACKSIDE OF #18. SECURE WITH ONE SCREW #A.
TAKE BUILT SECTION AND INSERT TONGUE AND GROVE END OF #18 INTO NOTCH ON #14 RIGHT
A.
END BASE AND TONGUE AND GROOVE END OF #8 INTO #15. SECURE WITH TWO #A SCREWS INTO THE OUTSIDE OF EACH END THROUGH PRE-DRILLED HOLES THAT HAVE BEEN INSERTED.
A
x4
8
A
8
18
A
.
.
15
2
A
.
.
14
.
A
A
.
LOCATE PART #19 RIGHT FRONT CENTER SUPPORT AND ONE #10 CENTER TOP SUPPORT, INSERT #10 TONGUE AND GROOVE END INTO #19 AND SECURE WITH ONE SCREW #A INTO OUTSIDE PRE­DRILLED HOLE.
A.
TAKE BUILT SECTION AND INSERT TONGUE AND GROOVE END OF #19 AND INSERT INTO #3 AND THE OTHER TONGUE AND GROOVE END OF #10 INTO #17. SECURE WITH TWO SCREWS #A INTO EACH END.
A
x3
9
GET PART #20 RIGHT DECK FRAME AND INSERT THE TONGUE AND GROOVE BOTTOM INTO THE FAR­LEFT NOTCHED TOP SECTION TOP OF #18. SECURE BACK OF #20 THROUGH PRE-DRILLED HOLE OF #19 WITH ONE SCREW #B IN BACK AND ONE #A SCREW THROUGH BOTTOM USING PRE-DRILLED HOLES.
RIGHT SIDE IS COMPLETE FOR NOW AND YOU ARE GOING TO CONNECT TO THE LEFT!
A.
A
20
19
.
10
.
.
3
.
.
17
.
A
B
.
19
18
.
A
B
x1 x1
10
ALIGN YOUR LEFT AND RIGHT SIDE AND MATCH THEM TOGETHER. YOU WILL SEE THE THREE TONGUE AND GROOVE DECK SUPPORTS WILL INSERT INTO THE NOTCHES ON THE FRONT AND THE BACK SECTIONS WILL ALIGN. WE SUGGEST USING YOUR CLAMP TO SECURE THESE TOGETHER IN THE FRONT.
SECURE THROUGH PRE-DRILLED HOLES ON RIGHT SIDE OF DECK WITH THREE #A
A.
SCREWS.
SECURE THROUGH PRE-DRILLED HOLES ON LEFT SIDE OF BACK CENTER SUPPORTS
B.
WITH TWO #C SCREWS.
A
C
x3 x2
A
C
C
A
A
A
11
NOW IT IS TIME FOR YOUR SWINGS. GRAB PARTS #21, #22 AND #D CHAINS.
INSERT TWO OF #D SCREW END INTO THE PRE-DRILLED HOLES ON
A.
UNDERSIDE OF #4 ON EACH SIDE.
HAND SCREW ONE #21 SWING SIDE INTO EACH #D CHAIN THROUGH PRE-
B.
DRILLED HOLES.
ATTACH #22 SWING SEAT TO BOTTOM OF #21’S AND SECURE THROUGH
C.
PRE-DRILLED HOLES ON THE BOTTOM WITH ONE #A SCREW ON EACH END ON BOTH SIDES. SUGGESTION NOTE-WE SUGGEST STARTING THE SCREWS THROUGH THE SEAT SO THE END OF THE SCREW JUST COMES THROUGH. THIS WILL MAKE IT EASIER TO ATTACH.
D
22
4
.
..
21
.
.
.
A
21
.
4
.
.
.
D
.
.
22
A
A
D
x4
x4
12
TAKE #23 DECK PLATFORM AND NEST ONTO TOP OF DECK FRAME (#12 & #20) NOTES-THERE ARE 2 PRE-DRILLED HOLES ON THE FAR END OF THE DECK. THOSE ARE TO ATTACH YOUR LADDERS, SO MAKE SURE THEY ARE ON THE FRONT ENDS FACING OUT.
SECURE WITH TWO #B SCREWS ON EACH SIDE THROUGH PRE-DRILLED HOLES.
A.
PLACE ONE #24 LADDER ON EACH SIDE TOP OF #23 DECK PLATFORM. ALIGN
B.
METAL BRACKETS OVER TOP OF PRE-DRILLED HOLES AND SECURE EACH SIDE WITH #E SCREWS.
ALIGN BASE OF #24 LADDER OVER #1 AND #14 BASE ENDS AND SECURE
C.
THROUGH PRE-DRILLED HOLES WITH #F SCREWS.
1
B E
F
13
x4
x8 x4
1. HAND SCREW #G HOOK INTO UNDERSIDE OF #12 THROUGH PRE-DRILLED HOLE.
GRAB #25 TREAT BASKET, FILLE WITH FRUITS, VEGGIES, CABBAGE AND
A.
MORE AND HANG FROM #G HOOK.
A
A
B
EEEE
B
F
F
EE
.
24
23
EE
.
.
.
B
B
F
F
.
14
G
x1
14
WE RECOMMEND EXTENDING THE LIFE OF YOUR CHICKEN ACTIVITY CENTER WITH OUTDOOR PAINT OR A CLEAR FINISH. IT HAS BEEN STAINED BUT USING A NON-TOXIC OUTDOOR PRODUCT OR A CLEAR POLYURETHANE WILL PROVIDE ADDITIONAL PROTECTION AGAINST RAIN, MOISTURE, HUMIDITY AND SNOW FOR MANY SEASONS TO COME. NOW! SET OUTSIDE FOR YOUR FREE-RANGE BIRDS OR WITHIN YOUR COOP AREA AND LET YOUR BIRDS ENJOY! AND DON’T FORGET THE YUMMIES IN THE TREAT BASKET FOR YOUR BIRDS!
25
.
G
Loading...