Coops & Feathers COFE1010 Installation & Assembly

A B
C
ASSEMBLY INSTRUCTIONS
3
"
1
1
1
1
41 pcs
4
"
7 pcs
4
"
8 pcs
2
D
E F
Chicken Play Center Small
Model# 250-71
1"
4 pcs
1 pcs
4 pcs
4
x2
1
LEFT
END BASE
6
REAR CENTER
SUPPORT
12
LEFT DECK
SUPPORT
2
FRONT
END BASE
7
FRONT
CENTER SUPPORT
13 14
TOP DECK
CONNECTOR
CENTER DECK CONNECTORS
MIDDLE SUPPORTS
x2
3
END BASE
x2
8
CENTER
RIGHT DECK
RIGHT
15
SUPPORT
1
IDENTIFY ALL PARTS AND HARDWARE THAT ARE INCLUDED WITH YOUR CHICKEN PLAY ACTIVITY CENTER. GRAB A SCREWDRIVER (OR HAND DRILL) AND A RUBBER MALLET. FIND A LEVEL PLACE TO BUILD IT AND AN EXTRA SET OF HANDS WOULD ALWAYS BE HELPFUL. START BUILDING!
CENTER
BASE SUPPORTS
9
x4
UPPER
16
DECK PLATFORM
10
x2
TOP FRAME
PERCH
17
SWING SIDE
19
x4
x2
SWING
SEAT
5
BACK END BASE
11
BACK UPPER
FRAME SUPPORT
18
x2
SWING SEAT
20
HANGING
TREAT BASKET
2
GET PARTS 1-5 AND SET THEM OUT AS THE IMAGE SHOWS. MATCH UP NOTCHES BEFORE INSERTING ANY OF THE PIECES TOGETHER. BEING THIS IS THE SNUG, SO ENSURING IT IS SET SQUARE AND GENTLY USING A RUBBER MALLET WILL HELP. INSERT #2 INTO #1 AND #3 FIRST. INSERT #4 (BOTH PIECES) INTO THE NOTCHES OF #2. TAKE YOUR TIME AND START WITH INSERTING #5 INTO #3 AND THEN WORK TO THE LEFT WITH ONE OF #4, THEN THE SECOND #3 AND FINALLY INTO #1. YOU WILL NEED TO SLIGHTLY ADJUST THE FRAME TO ENSURE A TIGHT FIT AND THAT ALL THE TONGUE AND GROOVES ARE FULLY INSERTED. SECURE TWO SCREWS (A) ON EACH OUTSIDE EDGE OF THROUGH THE PRE-DRILLED HOLES INTO EACH PART. SET ASIDE.
A
BASE
OF THE UNIT, THESE PIECES ARE GOING TO FIT VERY
x8
5
A
.
A
A
A
.
1
.
.
4
.
A
A
2
A
A
.
3
3
GET PARTS 6-8. THIS WILL BE YOUR
UPPER FRAME
. MATCH UP NOTCHES BEFORE INSERTING PIECES TOGETHER. ENSURE THE NOTCHES ON #6 AND #7 ARE CLOSEST TO THE TOP. INSERT TONGUE AND GROOVE ENDS ON PART #8 INTO #6 AND #7. YOU MIGHT NEED TO TAP LIGHTLY WITH RUBBER MALLET AND SECURE TOGETHER WITH FOUR SCREWS THROUGH PRE-DRILLED HOLES (A).
A
A
x4
4
GET PARTS 9 (4PC) & 10 (2PC). START WITH LEFT SIDE AND INSERT #9 INTO TONGUE/GROOVE ENDS OF #6 & #7. ENSURE THE TOP OF #9 HAS THE PRE-DRILLED HOLE ON THE TOP AND IS UPRIGHT. SECURE EACH WITH ONE SCREW (A) THROUGH PRE-DRILLED HOLES. SET ONE #10 ON BUILT END AND SECURE WITH TWO SCREWS (A) INTO TOP PORTION. REPEAT FOR OPPOSITE SIDE WITH TWO #9 USING THE SAME STEPS AND FINISH WITH THE OTHER #10 ON TOP.
A
.
9
A
6
.
A
A
A
.
.
.
8
.
.
7
A
10
.
9
.
A
12
6
.
A
13
10
A
.
9
.
A
x8
5
PLACE YOUR COMPLETED BASE UNIT FLAT AND NEST YOUR COMPLETED UPPER FRAME AS SHOWN IN THE IMAGE. TURN THE UNIT ON ITS SIDE FOR EASE IN INSERTING 8 SCREWS (A) INTO PRE­DRILLED HOLES. TURN UPRIGHT AND TAKE PART #11 AND INSERT TONGUE AND GROOVE INTO BASE WITH THE PRE-DRILLED HOLE FACING #6. SECURE WITH ONE SCREW (B) INTO PRE-DRILLED HOLE ON SIDE AND ONE SCREW (A) INTO BASE.
A
B
x9 x1
11
A
10
.
7
.
9
.
6
.
A
B
A
A
A
A
.
11
A
.
.
5
A
.
5
A
A
A
6
GET PARTS 12-15. THIS WILL BE YOUR OUT PARTS AS SHOWN IN IMAGE WITH NOTCHES/TONGUE/GROOVE ALIGNED PROPERLY. #12 ON THE LEFT, #13 AT THE TOP WITH THE PRE­DRILLED HOLE FACING DOWN, TWO #14’S ALIGNED IN THE CENTER AND #15 ON THE RIGHT. SET #15 ON ITS SIDE AND INSERT #13 AND THE TWO #14’S INTO THE TONGUE GROOVES. SET #12 ON TOP AND GENTLY PUSH INTO PLACE. THE RUBBER MALLET CAN BE GENTLY USED TO TAP UNIT TOGETHER. SECURE WITH THREE SCREWS (A) ON EACH SIDE. TWIST HOOK (E) INTO PRE­DRILLED HOLE ON UNDERSIDE OF #13.
A
E
x6 x1
DECK LOOKOUT SUPPORT
. LAYOUT
7
TAKE YOUR COMPLETED DECK LOOKOUT SUPPORT AND INSERT TONGUE/GROOVE BASE INTO NOTCHED HOLES ON FRONT OF UNIT AND INSERT. USE YOUR RUBBER MALLET GENTLY IF NEEDED TO TAP IN. SECURE BACK THROUGH PRE-DRILLED HOLES WITH TWO SCREWS (B). TURN ENTIRE UNIT ON BACKSIDE AND INSERT TWO SCREWS (A) INTO BASE OF DECK LOOKOUT SUPPORT. TURN UPRIGHT.
A
A
A
12
.
13
.
.
.
15
.
.
E
..
14
.
.
A
.
A
A
B
B
A
B
x2 x2
8
TAKE PART #16 AND SET ON TOP OF DECK LOOKOUT SUPPORT. SECURE WITH TWO SCREWS (B) ON EACH SIDE THROUGH PRE-DRILLED HOLES.
B
x4
A
A
B
B
16
.
B B
9
LOCATE FOUR CHAIN LINKS (F), FOUR-PART #17 AND TWO-PART #18 . INSERT TWO CHAIN LINKS (F) INTO EACH UNDERSIDE OF PART #17 IN PRE-DRILLED HOLES. GRAB THE FOUR #17 PARTS AND HAND TURN INTO EACH OF THE FOUR CHAIN LINKS (F). NEXT AND AS HELPFUL TIP­PRE-SCREW TWO OF (A) INTO PART #18 UNTIL JUST THE TIP OF THE SCREW COMES THROUGH. SECURE TWO SCREWS FOR EACH SIDE AND FULLY SECURE SCREWS (A) INTO EACH PART #17 (TOTAL OF FOUR).
A
F
x4 x4
10
TAKE TWO LADDERS-PART #19 AND SET METAL BRACKETS ON DECK LOOKOUT WITH BASES RESTING ON PART #1 ON THE LEFT AND PART #3 ON THE RIGHT. SECURE TOP WITH FOUR SCREWS (C) ON EACH SIDE THROUGH METAL BRACKETS AND THEN SECURE THE FEET BASES WITH TWO SCREWS (D) ON THE BOTTOM OF EACH SIDE.
DD
18
FF
17
.
.
.
FF
.
.
A
A
18
.
A
17
A
CC
CC
CC
C
D
x8 x4
11
GRAB PART #20, THE HANGING TREAT BASKET CAN BE FILLED WITH FRUITS, VEGGIES, CABBAGE OR MORE, AND HANG FROM HOOK (E).
12
WE RECOMMEND EXTENDING THE LIFE OF YOUR CHICKEN ACTIVITY CENTER WITH OUTDOOR PAINT OR A CLEAR FINISH. IT HAS BEEN STAINED BUT USING A NON-TOXIC OUTDOOR PRODUCT OR A CLEAR POLYURETHANE WILL PROVIDE ADDITIONAL PROTECTION AGAINST RAIN, MOISTURE, HUMIDITY AND SNOW FOR MANY SEASONS TO COME. NOW! SET OUTSIDE FOR YOUR FREE-RANGE BIRDS OR WITHIN YOUR COOP AREA AND LET YOUR BIRDS ENJOY! AND DON’T FORGET THE YUMMIES IN THE TREAT BASKET FOR YOUR BIRDS!
19
20
CC
.
.
.
DD
Loading...