Supplementary Installation Instructions
Sheet 1 of 1
Torque Sequence and Visor attachment
for all XL Fixtures
Warning
that all sources of power are turned off. All
work must meet local/national codes and be
performed by a certified electrician.
mount fixtures vertically.
: Before starting any work ensure
Torque Sequence and Specifications
10
3
2
5
8
7
6
1
4
9
1.
To remove door, loosen all ten captive door screws and carefully remove door.
2.
To seal door, tighten each door screw in the order specified above.
3.
Using torque allen driver, and beginning with screw one, tighten screws to five(5) inch pounds of torque.
4.
Next, tighten second screw to five(5) inch pounds of torque.
5.
Continue through all screws, following the above sequence, tightening each door screw to five(5) inch pounds of
torque.
6.
Repeat sequence tightening all screws to final then(10) inch pounds of torque.
Do not
Securing Visor to XL Fixture
1.
To secure visor to
2.
Secure visor using all four(4) 10-32 x 1/2" Pan head screws.
any
XL fixture, slip visor over previously tightened captive door screws.
10-32 x1/2"
Pan head screws
(4x)
THRU hole for
captive door screw
(x7)
ADY080875 REV A(ECN080377)