I
When installing or using this track system, basic safety precautions should always be
ollowed including the following
f
1. Read all of these installation instructions before installing the track system.
2. Save these instructions and refer to them when additions to or changes in the
rack configuration are made.
t
3. Do not install this track in damp or wet locations.
4. Do not install any part of this track system less than 5 feet above the floor.
5. Track is to be installed on ceiling only.
. Disconnect electrical power before adding to or changing the configuration of
6
the track.
7. Do not attempt to energize anything other than track lighting fixtures on the
rack. To reduce the risk of fire and electrical shock, do not attempt to connect
t
ower tools, extension cords, appliances and the like to the track.
p
. CAUTION: This track system is not intended for use with power supply cord or
8
convenience receptacle adapter.
9. The track system is to be supplied by one or two 240V/120V 60Hz single
hase system with grounded neutral.
p
0. The track should be supported as follows:
1
Every four feet. Complexity of curve will dictate more supports at apex of
curve on track.
11. CAUTION: The maximum capacity of the track system is 20A per 120 volt cir-
cuit and 25A on the 12 volt circuit. When installing, do not exceed the capacity
of your circuits. Check fuses and circuits carefully before installing.
SAVE THESE INSTRUCTIONS
RAIL ARCHITECTURAL FLEXIBLE HALO
DIRECTIVES D’INSTALLATION
LF603, LF604, LF605, LF606
IRECTIVES DE SÉCURITÉ IMPORTANTES
D
Lors de l’installation ou de l’utilisation de ce sytème de rail, certaines mesures de
écurité élémentaires doivent être prises, y compris les mesures suivantes.
s
1. Lire la totalité de ces directives d’installation avant d’installer le système de rail.
2. Ranger ces directives et s’y reporter si des ajouts ou des changements doivent
tre effectués sur le rail.
ê
3. Ne pas installer ce rail dans les endroits mouillés ou humides.
4. N’installer aucun élément de ce système de rail à moins de 5 pieds du sol.
5. Plafond installation seulement.
. Couper le courant avant de procéder à tout ajout ou changement sur le rail.
6
. Ne pas tenter de mettre sous tension autre chose que les lampes à partir du rail.
7
Pour atténuer les risques d’incendie et de choc électrique, ne pas tenter de
rancher des outils, rallonges et appareils électriques et des dispositifs du même
b
enre sur le rail.
g
. ATTENTION : Ce système de rail n’est pas destiné à être utilisé avec des cor-
8
dons ou des adaptateurs d’alimentation électrique.
9. Le rail doit être alimenté par un ou deux réseaux monophasés de 240 V / 120 V
t 60 Hz avec neutre à la terre.
e
0. Le rail doit être soutenu comme suit :
1
À chaque longueur de quatre pieds. La complexité des courbes peut nécessiter
d’autres supports à l’apex de chaque courbe du rail.
11. ATTENTION : La capacité d’intensité maximale du système de rail est de 20 A
par circuit de 120 volts et de 25 A pour le circuit de 12 volts. Ne pas dépasser
ces intensités lors de l’installation. Bien vérifier les fusibles et les circuits avant
l’installation.
GARDER CES DIRECTIVES
TRACK CROSS SECTION
120V
120V
Circuit #1
Neutral
Neutre
120V
120V
Circuit #2
Neutral
Neutre
12V
Circuit
Cooper Lighting • 1121 Highway 74 South • Peachtree City GA 30269 • 770-468-4800
703218
HALO
®
HALO ARCHITECTURAL FLEXIBLE TRACK
INSTALLATION INSTRUCTIONS
LF603, LF604, LF605, LF606
OWER HUB CONNECTOR 4"
P
(LF604 & LF606) Fig. 1
tep 1. After bending track, locate POWER HUB CONNECTOR. Using a plumb bob
S
or laser sight, mark hole on ceiling for mounting assembled HUB SPACER
and HUB COVER.
tep 2. Drill appropriate hole size in ceiling to install toggle bolt.
S
Step 3. Insert toggle bolt screw through washer and HUB SPACER/HUB COVER
Step 4. Install POWER HUB CONNECTOR on cover and turn clockwise to secure.
S
S
S
POWER HUB CONNECTOR (LF604 & LF606) Fig. 2
S
Step 2. Drill appropriate hole size in ceiling to install toggle bolt.
Step 3. Insert toggle bolt screw thru CEILING COUPLER with toggle on opposite site.
Step 4. Thread DOVETAIL STEM onto DOVETAIL COUPLING.
Step 5. Slide CEILING HANGER onto DOVETAIL STEM.
Step 6. Install COLLAR onto the end of DOVETAIL STEM with the 2 set screws
Step 7. Align DOVETAIL STEM with CEILING COUPLER. Slide CEILING HANGER
Step 8. Clamp TRACK JAWS provided with TRACK onto track 2 inches from TRACK
Step 9. Insert track into POWER HUB CONNECTOR until fully seated.
Step 10. Secure track with set screws provided. Unscrew center cap to access set
ssembly with toggle nut on opposite side. Install assembly into ceiling and
a
ighten securely.
t
ighten HUB COVER SET SCREW.
T
tep 5. Clamp TRACK JAWS provided with TRACK onto track 2 inches from TRACK
end.
tep 6. Insert track into POWER HUB CONNECTOR until fully seated.
tep 7. Secure track with set screws provided. Unscrew CENTER CAP to access
set screws for securing center track section.
tep 1. After bending track, locate POWER HUB CONNECTOR. Using a plumb bob or
aser sight, mark hole on ceiling for mounting CEILING COUPLER.
l
Install assembly into ceiling.
provided.
into CEILING COUPLER and install with the set screws provided.
end.
screws for securing center track section.
FIG. 1
RAIL ARCHITECTURAL FLEXIBLE HALO
DIRECTIVES D’INSTALLATION
LF603, LF604, LF605, LF606
CONNECTEUR D’ALIMENTATION 4"
LF604 et LF606) Fig. 1
(
tape 1. Après avoir courbé le rail, localiser le CONNECTEUR D’ALIMENTATION. En
É
utilisant un fil à plomb ou un viseur laser, marquer au plafond l’emplacement
’un trou destiné au montage de la CALLE D’ESPACEMENT DU
d
ONNECTEUR et le COUVERCLE DU CONNECTEUR.
C
Étape 2. Effectuer un percement d’un diamètre approprié pour installer le boulon à
ailettes.
tape 3. Passer la tige du boulon à ailettes à travers la rondelle, la CALLE
É
É
É
Étape 6. Passer le rail dans le CONNECTEUR D’ALIMENTATION et l’appuyer bien
Étape 7. Serrer le rail avec les vis de blocage fournies. Dévisser le BOUCHON
CONNECTEUR D’ALIMENTATION (LF604 et LF606) Fig. 2
Étape 1. Après avoir courbé le rail, localiser le CONNECTEUR D’ALIMENTATION. En
Étape 2. Faire un trou du bon diamètre en perçant le plafond pour y placer le boulon à
Étape 3. Insérer la partie filetée du boulon à ailettes à travers le RACCORDEMENT
Étape 4. Visser la TIGE DE QUEUE D’ARONDE sur le RACCORDEMENT DE
Étape 5. Glisser le SUPPORT DE PLAFOND sur la TIGE DE QUEUE D’ARONDE.
Étape 6. Monter le COLLET sur la TIGE DE QUEUE D’ARONDE en utilisant les 2 vis
’ESPACEMENT DU CONNECTEUR et le COUVERCLE DU
D
CONNECTEUR (avec les ailettes à l’opposé). Installer l’ensemble sur le
lafond et bien serrer.
p
tape 4. Installer le CONNECTEUR D’ALIMENTATION sur le couvercle et le faire
tourner dans le sens horaire pour le fixer. Serrer la VIS DE BLOCAGE DU
COUVERCLE DU CONNECTEUR.
tape 5. Serrer la PINCE DE RAIL fournie avec le RAIL pour la fixer à 2 pouces de
l’extrémité du RAIL.
n place.
e
ENTRAL pour accéder aux vis de blocage et fixer la partie centrale du rail.
C
se servant d’un fil à plomb ou d’un dispositif de visée à laser, marquer au
plafond l’emplacement des trous de fixation du RACCORDEMENT DE PLAFOND.
ailettes
DE PLAFOND (les ailettes doivent être de l’autre côté du RACCORDEMENT). Installer l’ensemble sur le plafond.
QUEUE D’ARONDE.
de blocage fournies.
LF604,
LF606
(4 inch)
TRACK JAW
PINCE DE RAIL
SET SCREW
VIS DE BLOCAGE
TRACK
RAIL
CENTER CAP
BOUCHON CENTRAL
REMOVEABLE
INSERT
AMOVIBLE
INSERTION
TOGGLE
AILETTES
HUB SPACER
HUB COVER
COUVERCLE
WASHER
RONDELLE
HUB COVER
SET SCREW
VIS DE
BLOCAGE
POWER HUB
CONNECTOR
CONNECTEUR
D’ALIMENT
SET SCREW
VIS DE BLOCAGE
ATION
FIG. 2
LF604,
LF606
CEILING HANGER
SUPPORT DE PLAFOND
DOVETAIL STEM
TIGE DE QUEUE
TRACK JAW
PINCE DE RAIL
D’ARONDE
TRACK
RAIL
SET SCREW
VIS DE
BLOCAGE
CENTER CAP
BOUCHON CENTRAL
TOGGLE
AILETTES
CEILING COUPLER
RACCORDEMENT
DE PLAFOND
SET SCREW
VIS DE BLOCAGE
COLLAR
COLLET
SET SCREW
VIS DE
BLOCAGE
POWER HUB
CONNECTOR
CONNECTEUR
D’ALIMENT
ATION
SET SCREW
VIS DE BLOCAGE
REMOVEABLE
T
INSER
AMOVIBLE
INSERTION
Cooper Lighting • 1121 Highway 74 South • Peachtree City GA 30269 • 770-468-4800 703218