Cooper CEAG Webmodule ZB-S Operating Instructions Manual

Operating Instructions
Webmodule ZB-S
Target group: Skilled electricians
400 71 860 051 (A)
CEAG Notlichtsysteme GmbH
2
Operating Instructions Webmodule ZB-S
Index
1 Safety Instructions ........................................................................................ 3
2 Conformity with standards ........................................................................... 3
3 Technical data ................................................................................................ 3
3.1 Description / Scope of application ......................................................................... 3
4 Installation...................................................................................................... 3
4.1 Mounting ................................................................................................................. 3
4.2 Electrical connection ............................................................................................... 3
4.3 Commissioning the Webmodule on the ZB-S ........................................................ 4
4.4 Deactivate the webmodule on the control unit ZB-S .............................................. 4
4.5 Monitoring via an internet browser ......................................................................... 5
5 Homepage / Login ......................................................................................... 6
6 Submenus ...................................................................................................... 8
6.1 Overview ZB-S ........................................................................................................ 8
6.2 Overview SKU ......................................................................................................... 9
6.3 DLS/TLS/3PhW ..................................................................................................... 11
6.4 Settings ................................................................................................................. 12
6.5 Email-Messages .................................................................................................... 14
6.6 Other webmodules ................................................................................................ 15
7 Example of locating a luminaire failure ..................................................... 16
8 Data gets synchronized .............................................................................. 19
CEAG Notlichtsysteme GmbH 3
Operating Instructions Webmodule ZB-S
Service
Störung Failure
24V
+
-
PE
1 Safety Instructions
The Webmodule ZB-S shall
only be used for its intended purpose and in undamaged and perfect condition!
When working on the elec-
tronic device make sure that it is disconnected from the voltage! Pay attention to the different power supplies in mains or battery operation.
Observe the national safety
rules and regulations for prevention of accidents as well as the safety instruc­tions included in these ope­rating instructions marked with !
2 Conformity with
standards
Conform to: EN 60950-1. Developed, manufactu­red and tested acc. to ISO
9001.
3 Technical data
Supply voltage: 24 V DC Power consumption: < 1.5 W Connection: RJ45 Insulation class: III Degree of protection acc. to EN 60529: IP 20 Ambient temperature:
-10 °C .. +55 °C Connection terminal: 1,5 mm² Weight: 0,1kg Dimensions: 90 x 35 x 58mm
3.1 Description / Scope of application
The webmodule ZB-S for visualisation and monitoring of a central battery system ZB-S via local ethernet (LAN) with a customary WEB-brow­ser (e. g. Internet Explorer
TM).
Integrated mail-client for a comfortable and event based failure notification for up to 5 email addressees. Password protected access accounts capable of parametrisation.
Note: For operation of the web­module with a ZB-S system the following software-state must be installed in the con­trole module: P/F/H (Mega 128/RS485/ FTT 10A)
4 Installation
For the mounting and operation of
electrical apparatus, the respective national safety regulations as well as the general rules of engineering will have to be observed!
4.1 Mounting
Pay attention to tempera­tures outside the permitted range during operation. The permissible ambient tem­perature may not exceed 55°C. The module was designed for DIN rail mounting (2TE) to be only mounted in the cabinet. An external mounting out­side the ZB-S cabinet is not
permitted.
4.2 Electrical connection
Status/ Failure LED
Network connection RJ45
Service Pin
Connection of the 6-pole data cable to the control unit ST-S
+ - PE
24 V DC from DC/DC inverter
The webmodule ZB-S is supplied with 24V DC of the DC-DC inverter of the ZB-S. The PE connector must be connected to the protection earth (PE) in the ZB-S. Note: The DC-DC inverter can supply max. 20 pcs. further DLS/3Ph-busmodu­les/TLS-modules! The 6-pole data cable con­nects the webmodule with the ST-S control unit:
CEAG Notlichtsysteme GmbH
4
Operating Instructions Webmodule ZB-S
Connection of the data cable to the control unit ST-S
Note:
Keep the distance of the data cable between the webmodule and the con­trol unit ST-S as short as possible. Please avoid a wiring around the char­ging unit.
4.3 Commissioning the Webmodule on the ZB-S
After connection of the power supply (24V DC), the webmodule needs approx.
1.5 minutes for booting.
After the booting, the red LED of the webmodule flashes slowly. To log on the webmodule on the ST-S control unit, the service pin of the webmodule must be pressed for approx. 1 second. The menu „webserver setup“ appears in the display of the control unit of the ZB-S. During the log on procedure the display shows a lot of question marks. After approx. 3-5 seconds the display shows the standard settings of the webmodule:
The webmodule gets automatically activated to the control unit, which is displayed by the red LED (some seconds) of the con­trol unit and the webmo­dule. After 1-2 minutes the procedure is finished and the webmodule is ready to operate.
LED-display of the web­module:
LED flashes slowly: webmodule is not activated on the control unit. Status-LED flashes fastly 3x : when pushing the service pin for approx. 10 seconds the webmodule will be set back into delivery status.
Service pin of the webmo­dule:
Pressing the service pin for: 1 sec.: login/logout of the webmodule on the control unit ST-S
> 10 sec.: resets the modu­le to the delivery status
Attention! All programmed data get lost!
4.4 Deactivate the webmodule on the control unit ZB-S
The webmodule can be deactivated on the control unit. For this, the service pin of the webmodule has to be pressed for approx. 1 sec. The screen showed in the picture above appears. With the push button „arrow left“ or „arrow right“ the webmodule can be set as „not installed“. Press o.k. and back with menu button. Now the webmodule is off­line and the red LED flashes slowly.
CEAG Notlichtsysteme GmbH 5
Operating Instructions Webmodule ZB-S
During activities on the con­trol unit of the ZB-S, e.g. programming of luminaires, it is possible that the con­nection between the control unit and the webmodule is interrupted for a short time. This gets displayed by a red LED on the control unit or rather on the webmodule.
Direct access via IP-address:
. g.: 192.168.100.5
e
Furthermore the webbrow­ser shows „data is synchro­nized“. The connection will automatically be restored after a short time.
4.5 Monitoring via an internet browser
Functional schematic:
with HTTP via TCP
The webmodule allows a visualisation of a ZB-S/ US-S central battery system via ethernet. If the device shall be in­stalled in a factory intranet it is necessary to get all required information, like network settings or mail settings from the IT-depart­ment in charge (see chapter
6.4, Settings)
CEAG Notlichtsysteme GmbH
6
Operating Instructions Webmodule ZB-S
5 Homepage / Login
By entering the TCP/IP­address (s. 5.a: ex works:
192.168.1.200) in the internet-browser the home­page will open.
5.a
Ex works 2 logins are given which can be modified individual at anytime:
Loading...
+ 14 hidden pages