GEMINI
DATE:
PROJECT:
LOCATION:
-
-
-
GEMINI 100 SERIES
PRE-2014 MOTOR
REPLACEMENT
INSTRUCTIONS
MOTOR
INSTALLATION INSTRUCTIONS:
1. SHUT OFF AND LOCK OUT POWER TO FAN.
RUBBER
ISOLATOR
INLET
PLATE
FLAT WASHER
HEX NUT
WHEEL
CLAMP
2. REMOVE GRILLE
3. UNPLUG MOTOR CABLE FROM FIELD WIRING BOX.
4. REMOVE (4) SCREWS HOLDING INTERNAL ASSEMBLY
TO HOUSING AND PREPARE TO DIS-ASSEMBLE.
5. USE A ALLEN WRENCH TO LOOSEN CLAMP AND REMOVE FAN WHEEL.
6. REMOVE (4) HEX NUTS TO REMOVE MOTOR.
7. INSTALL MOTOR IN REVERSE ORDER AND REPLACE
INTERNAL ASSEMBLY MAKING SURE TO FASTEN RING TERMINAL
OF GREEN WIRE TO ONE OF THE (4) MOUNTING SCREWS IN
ORDER TO PROPERLY GROUND THE MOTOR.
8. CONNECT PLUG FROM MOTOR TO PLUG IN FIELD WIRING BOX.
9. RESTORE POWER TO FAN AND INSPECT FOR PROPER OPERATION.
10. REPLACE GRILLE.
INTERNAL ASSEMBLY
FAN WHEEL
FIELD WIRING BOX
GREEN GROUND WIRE TERMINAL MUST BE
FASTENED TO INTERNAL HOUSING SCREW
AS SHOWN.
GEMINI 100 SERIES WITH GRILLE REMOVED