Convotherm 4 Assembly Instructions Manual

Page 1
Stacking kit
Convotherm 4
UL, USA Assembly Instructions – Original, ENG
Page 2
Page 3
FOR THE INSTALLER, OPERATOR, RESPONSIBLE OWNER
FOR YOUR SAFETY
WARNING
Improper installation, adjustment, alteration, service or maintenance can cause property damage, injury and death. Read the installation, operating and maintenance instructions thoroughly before installing or servicing this equipment.
WARNING
Disconnect power at the main external power switch before servicing or repairing a combi oven.
WARNING
To reduce the risk of electric shock, do not remove or open cover. No user serviceable parts inside. Refer servicing to qualified personnel.
Disconnect power supply before servicing.
IMPORTANT
IT IS COMPULSORY TO POST INSTRUCTIONS WHICH ARE TO BE FOLLOWED IN THE EVENT THE USER SMELLS GAS. THESE INSTRUCTIONS MUST BE LOCATED IN A PROMINENT LOCA‐ TION, AND BE FULLY UNDERSTOOD BY ALL USERS OF THIS EQUIPMENT. THIS INFORMA‐ TION NEED TO BE OBTAINED FROM YOUR LOCAL GAS SUPPLIER.
ALL SERVICE MUST BE PERFORMED BY A QUALIFIED CONVOTHERM AUTHORIZED TECHNI‐ CIAN.
KEEP AREA FREE AND CLEAR OF COMBUSTIBLES.
Installation
Installation of this appliance must be done by a licensed professional when installed in the Common‐ wealth of Massachusetts.
The wiring diagram is located on the inner part of the side panel.
Customer documentation
The customer documentation is part of the combi oven.
Keep the customer documentation manuals handy at all times so that you can look up any required information.
Keep the customer documentation manuals for the entire life of the unit.
Carefully read the installation manual, the operating manual, and the operating instructions before using, handling, and working on this unit.
If you transfer the combi oven to a new owner, make sure to give the new owner the customer doc‐ umentation manuals as well.
Page 4
Page 5
Table of Contents
1 General 6
1.1 Environmental Protection 6
1.2 About These Assembly Instructions 7
2 For Your Safety 8
2.1 Basic Safety Instructions 8
2.2 Your Stacking Kit’s Intended Use 8
2.3 Additional Hazards and Safety Measures During Transport and Setup 9
2.4 Additional Hazards and Safety Measures During Installation, Placement into Operation, Maintenance, and Removal from Service
11
2.5 Additional Hazards and Safety Measures During Operation and Cleaning 13
2.6 Staff and Work Area Requirements 16
3 Stacking kit version layouts and components 18
3.1 Combinations allowed 18
3.2 Versions and Components 19
3.3 Center Adapter for Electrical Units 21
3.4 Center Adapter for Gas Units 23
3.5 6” base 25
3.6 12” base 26
3.7 Base with rollers 27
3.8 Marine Model Base 28
4 Planning for Setup and Assembly 29
4.1 Working Safely During Setup and Assembly 29
4.2 Installation Location Requirements 29
4.3 Required Tools and Materials 30
4.4 Basic installation procedure 31
5 Assembly 32
5.1 Installing the Exhaust Duct Extension on the Bottom Unit 32
5.2 The bottom combi oven is mounted on the base 35
5.3 Installing the Center Adapter 39
5.4 Installing the Top Unit 46
5.5 Wall Anchoring (Optional) / Marine Model / Retaining Element 57
5.6 Affixing Warning Labels 58
5.7 Additional Work 59
6 Placing into operation 60
6.1 Procedure for Placing the Unit into Operation 60
7 Cleaning and maintenance 61
7.1 Cleaning Work 61
7.2 Maintenance Work 61
8 Removing from service 62
8.1 Procedure for Removing the Unit from Service 62
Table of Contents
5
Page 6
1  General
Purpose of this section
This section explains how to use these assembly instructions.
1.1  Environmental Protection
Policy statement
Our customers' expectations, the legal regulations and standards we have to follow, and our compa‐ ny's reputation are what drives the quality and service behind all our products.
Our environmental management policy is not only designed to ensure that we are always in full com‐ pliance with all environmental laws and regulations, but also reflects our commitment to the environ‐ ment and to continuously improving our performance in this field.
In order to ensure that we meet all of our environmental goals while maintaining the high quality of our products, and that things stay this way, we have developed a quality and environmental management system.
This system meets the requirements set forth in ISO 9001:2008 and ISO 14001:2004.
Environmental protection measures
The following measures apply to this product:
Uses fully compostable packing products
Uses RoHS-compliant products
Complies with the REACH regulation
Recommends and uses biodegradable cleaning agents
E-waste recycling
Environmentally friendly disposal of old units through the manufacturer
Join us in our commitment to protecting the environment!
1 General
6
Page 7
1.2  About These Assembly Instructions
Purpose
These assembly instructions provide answers to the following questions:
What kinds of things are important to keep in mind when installing a stacking kit?
Customer documentation structure
The customer documentation is made up of the following:
Installation manual
Operating manual
Supplemental assembly instructions (these instructions)
Other required instructions
These assembly instructions are meant to supplement the operating and installation manuals for your unit and should only be used together with these manuals.
For more information on technical data, intended use, components, function, and safety, please refer to the manuals.
These assembly instructions are intended for installers and authorized customer service companies.
1 General
7
Page 8
2  For Your Safety
Purpose of this section
The purpose of this section is to provide you with all the information on hazards and safety measures that you will need (in addition to the unit safety information found in the operating and installation man‐ uals) in order to safely work with and on the stacking kit without putting yourself and others at risk.
Read this section very carefully.
2.1    Basic Safety Instructions
Basic Safety Instructions
The purpose of these instructions is to ensure that everyone working with and on the combi oven will be fully aware of all the risks, hazards, and safety requirements involved and will observe the warnings in the operating manual and on the combi oven. Failure to follow these instructions may result in death, injury, or property damage.
2.2  
 Your Stacking Kit’s Intended Use
Intended use
The stacking kit should only be used for the following purpose:
The stacking kit has been designed and built exclusively for stacking approved combi oven combi‐ nations.
Limitations on use
The following limitations on use must be observed:
Do not, under any circumstance, place a size 10.10 or 10.20 unit on top of a base with a foot height of 12"!
Do not, under any circumstance, place a size 10.10 or 10.20 unit on top!
The assembled stacking kit is not meant to be transported with a truck or forklift.
2 For Your Safety
8
Page 9
2.3    Additional Hazards and Safety Measures During Transport and Setup
Transportation and setup
When transporting and setting up the combi oven, keep the following hazards in mind and take the actions required in order to eliminate and/or minimize these hazards:
Risk / hazard Where and in which situations will
the risk/hazard exist?
What to do / safety equipment
Explosion hazard posed by gas leaks
Whenever the connections are not disconnected before moving the unit
Make sure to only have gas techni‐ cians from an authorized installation company work on the gas system
Disconnect the connections Safety device:
Wall anchoring kit
Risk of electric shock posed by live parts
Whenever replacing the bottom unit’s dry air intake
Work on the unit’s electrical com‐ ponents should be performed ex‐ clusively by a qualified electrician from an authorized service compa‐ ny
Work professionally
Before removing the covers:
De-energize all connections
Lock out and tag out all switches
Make sure that the unit is de-ener‐ gized
Crush hazard if the unit topples over
Whenever moving the units across uneven surfaces or after bumping into an obstacle
Whenever the connections are not disconnected before lifting
Whenever the unit is not posi‐ tioned correctly
Whenever the supporting surface is not stable and even
Secure the units so that they can‐ not topple over
Use suitable equipment and as‐ sembly aids to transport the units
Set up the units on an even and stable supporting surface
Disconnect the connections
Place the unit on the locating pins correctly and screw it in place
Safety device:
Wall anchoring kit (optional)
Locating pins and screw joints
Marine model: Feet that can be screwed onto the floor
Whenever the top unit is loaded with a lot of weight
When moving the stacking kit
When placing the unit on its back
Exercise caution when performing maintenance work
Risk of injury due to ex‐ cessive exertion
When stacking the stacking kit and the unit
Whenever using a spirit level to level the units
Whenever mounting the center adapter
When placing the unit on its back and then lifting it back up
Do not lift or carry too much weight!
Only with a sufficient number of people or suitable equipment
Risk of scalding posed by hot liquid
When lifting the unit
When placing the unit on its back
Let the unit cool down before mak‐ ing changes
Wear the required personal pro‐ tective equipment
2 For Your Safety
9
Page 10
Risk / hazard Where and in which situations will
the risk/hazard exist?
What to do / safety equipment
Risk of burns posed by hot surfaces
On the air vent
On the exhaust ducts
Everywhere on the inside
On the outside of the unit door
Let the unit cool down before mak‐ ing changes
Wear the required personal pro‐ tective equipment
Piercing hand hazard Whenever mounting the unit
Exercise caution when performing maintenance work
Wear the required personal pro‐ tective equipment
Pinch point hazard for hands and fingers
Whenever mounting the center adapter
Whenever mounting the top unit
Whenever moving stacking kits with rollers
When placing the unit on its back
Exercise caution when performing maintenance work
Wear the required personal pro‐ tective equipment
Slip hazard When flipping the unit over
Exercise caution when performing maintenance work
Always keep the floor around the unit dry
Shear hazard Whenever mounting the top unit Exercise caution when performing
maintenance work
Cut hazard
When knocking out the perforated knockout on the front plate and on the door contact switch’s holding plate
When knocking out the perforated knockout on the top unit’s bottom
Exercise caution when performing maintenance work
Wear the required personal pro‐ tective equipment
Remove the knockout as indicated in the instructions and deburr the corresponding edges
2 For Your Safety
10
Page 11
2.4    Additional Hazards and Safety Measures During Installation, Placement into Operation, Maintenance, and Removal from Service
Installation, placement into operation, maintenance, and removal from service
When installing and maintaining the combi oven, as well as when placing it into operation or removing it from service, keep the following hazards in mind and take the actions required in order to eliminate and/or minimize these hazards:
Risk / hazard Where and in which situations will
the risk/hazard exist?
What to do / safety equipment
Explosion hazard posed by gas leaks
Whenever the connections are not disconnected before moving the unit
Make sure to only have gas techni‐ cians from an authorized installation company work on the gas system
Disconnect the connections
Test the supply line for leaks
Test for leaks inside the unit
Safety device:
Retaining element
Burn and fire hazard posed by hot combus‐ tion exhaust air
Between the units
Whenever an excessive amount of heat is produced due to improper assembly
Do not use any gas exhaust system other than the specified one
Risk of electric shock due to damaged con‐ nection cable
Whenever transporting the unit
Whenever the connection cable is routed across sharp sheet metal edges
At the back of the unit
Whenever the unit is on rollers
Check the connection cable
Check the connection cable’s rout‐ ing
Risk of electric shock due to missing equip‐ ment grounding
On the unit and on neighboring met‐ al parts
Connect the units to a grounding system
Risk of electric shock posed by live parts
Whenever replacing the bottom unit’s dry air intake
Whenever connecting the auxiliary fans for the top unit’s center adapt‐ er
Work on the unit’s electrical com‐ ponents should be performed ex‐ clusively by a qualified electrician from an authorized service compa‐ ny
Work professionally
Before removing the covers:
De-energize all connections
Lock out and tag out all switches
Make sure that the unit is de-ener‐ gized
Before putting the unit into opera‐ tion, make sure that all electrical connections are undamaged and properly connected
Risk of electric shock due to moisture enter‐ ing the wiring compart‐ ment
On the unit
Improper assembly
Follow the instructions to assemble everything properly
2 For Your Safety
11
Page 12
Risk / hazard Where and in which situations will
the risk/hazard exist?
What to do / safety equipment
Crush hazard if the unit topples over
Whenever moving the units across uneven surfaces or after bumping into an obstacle
Whenever the connections are not disconnected before lifting
Whenever the unit is not posi‐ tioned correctly
Whenever the supporting surface is not stable and even
Secure the units so that they can‐ not topple over
Use suitable equipment and as‐ sembly aids to transport the units
Set up the units on an even and stable supporting surface
Disconnect the connections
Place the unit on the locating pins correctly and screw it in place
Safety device:
Wall anchoring kit (optional)
Locating pins and screw joints
Marine model: Feet that can be screwed onto the floor
Whenever the top unit is loaded with a lot of weight
When moving the stacking kit
When placing the unit on its back
Exercise caution when performing maintenance work
Contact with cleaning agents
When cleaning agent tubes are damaged or cut by sharp compo‐ nents
Follow the installation sequence in the instructions
Risk of scalding Whenever opening the bottom unit’s
door
Exercise caution when performing maintenance work
Fall hazard as a result of wet floors
When cleaning agent tubes are damaged or cut by sharp compo‐ nents
Check to make sure that the clean‐ ing agent tubes are routed properly
Pinch point hazard for hands and fingers
When installing the side panels
Exercise caution when performing maintenance work
Wear the required personal pro‐ tective equipment
Risk of burns posed by hot surfaces
On the exhaust duct
On the exhaust ducts
Everywhere on the inside
On the outside of the unit door
Wear the required personal pro‐ tective equipment
Let the units cool down before per‐ forming maintenance
Cut hazard
When knocking out the perforated knockout on the front plate
When knocking out the perforated knockout on the top unit’s bottom
Exercise caution when performing maintenance work
Wear the required personal pro‐ tective equipment
Remove the knockout as indicated in the instructions and deburr the corresponding edges
2 For Your Safety
12
Page 13
2.5    Additional Hazards and Safety Measures During Operation and Cleaning
Operation and cleaning
When operating and cleaning the combi oven, keep the following hazards in mind and take the actions required in order to eliminate and/or minimize these hazards:
Risk / hazard Where and in which situations will
the risk/hazard exist?
What to do
Explosion hazard posed by gas leaks
Whenever the connections are not disconnected before moving the unit
Disconnect the connections Safety device:
Wall anchoring kit
Burn and fire hazard posed by hot combus‐ tion exhaust air
Between the units
Whenever an excessive amount of heat is produced due to improper assembly
Do not use any gas exhaust system other than the specified one
Risk of electric shock due to damaged con‐ nection cable
Whenever transporting the unit
Whenever the connection cable is routed across sharp sheet metal edges
At the back of the unit
Whenever the unit is on rollers
Check the connection cable
Check the connection cable’s rout‐ ing
Risk of electric shock due to moisture enter‐ ing the wiring compart‐ ment
On the unit
Improper assembly
Follow the instructions to assemble everything properly
Contact with cleaning agents
When cleaning agent tubes are damaged or cut by sharp compo‐ nents
Follow the installation sequence in the instructions
Risk of scalding
Whenever opening the bottom unit’s door
Whenever removing GN contain‐ ers
Exercise caution when performing maintenance work
When handling bakeware contain‐ ing liquid food or food that will be‐ come liquefied during cooking, make sure to only slide the bake‐ ware into fully visible shelf levels, as well as to pull it out in a com‐ pletely horizontal position
Fall hazard as a result of wet floors
When cleaning agent tubes are damaged or cut by sharp compo‐ nents
Check to make sure that the clean‐ ing agent tubes are routed properly
Pinch point hazard for hands and fingers
When installing the side panels
Exercise caution when performing maintenance work
Wear the required personal pro‐ tective equipment
Risk of burns posed by hot surfaces
On the exhaust duct
On the exhaust ducts
Everywhere on the inside
On the outside of the unit door
Wear the required personal pro‐ tective equipment
Let the units cool down before cleaning
Moving units during operation
When moving units on a base with rollers while the combi ovens are running, keep the following haz‐ ards in mind and take the actions required in order to eliminate and/or minimize these hazards:
2 For Your Safety
13
Page 14
Risk / hazard Where and in which situations will the
risk/hazard exist?
What to do
Pinch point hazard (for multiple body parts)
When units are being moved on a base with rollers
Do not pull the base with rollers forward unless you are cleaning the combi oven case or the floor/ surface below the units, in which case you should make sure not to pull it forward by more than the 20” allowed by the attached re‐ taining element
Make sure to always lock the roll‐ ers when the units are running
Every day before using the units, check to make sure that the roll‐ ers are locked in position
Pinch point hazard (hand and foot haz‐ ard)
Risk of scalding posed by hot wastewater
Risk of scalding posed by hot, liquid food
Risk of electric shock posed by live parts
Gas explosion hazard
Skin and eye irritation hazard as a result of contact with cleaning agents
Pinch point hazard for hands and fingers
Risk of burns posed by hot surfaces
Moving units during cleaning
When moving units on a base with rollers while the combi ovens are being cleaned, keep the following hazards in mind and take the actions required in order to eliminate and/or minimize these hazards:
Risk / hazard Where and in which situations will
the risk/hazard exist?
What to do
All the risks and haz‐ ards listed below
When units are being moved on a base with rollers
Before moving the unit (to clean the combi oven’s case or the floor, for example), check to make sure that the retaining element de‐ signed to limit how much the base can move with the unit is attached.
De-energize the unit before mov‐ ing it
When moving the unit, make sure not to roll over any connection lines (electrical, gas, and water)
Pinch point hazard (for multiple body parts)
When units are being moved on a base with rollers
Pay attention to the utility and hose connections.
Use at least two people to move the unit
2 For Your Safety
14
Page 15
Risk / hazard Where and in which situations will
the risk/hazard exist?
What to do
Pinch point hazard (hand and foot hazard)
When units are being moved on a base with rollers
Keep the unit doors shut
Risk of scalding posed by hot wastewater
When units are being moved on a base with rollers
Let the units cool down
Immediately wipe or mop up any water that has leaked
Wear appropriate protective cloth‐ ing
Risk of scalding posed by hot, liquid food
When units are being moved on a base with rollers
Do not move units if there is any food still in them
Risk of electric shock posed by live parts
When units are being moved on a base with rollers
Pay attention to the utility and hose connections.
Gas explosion hazard When units are being moved on a
base with rollers
Pay attention to the gas supply line
Skin and eye irritation hazard as a result of contact with cleaning agents
When units are being moved on a base with rollers
Make sure that the connections are long enough
When moving the base, keep the cleaning agent canisters closed
Trip hazard as a result of utility and hose con‐ nections routed in the open
When cleaning behind units that have been pulled forward
Exercise caution when performing maintenance work
Fall hazard as a result of floors being wet with wastewater
When cleaning behind units that have been pulled forward
In front of the unit
Immediately wipe or mop up any water that has leaked
Make sure that the connections are long enough
Fall hazard as a result of floors being wet with cleaning agents
When cleaning behind units that have been pulled forward
In front of the unit
When moving the units, keep the cleaning agent canisters closed
2 For Your Safety
15
Page 16
2.6    Staff and Work Area Requirements
Staff requirements
The table below specifies the qualifications needed for each role. Provided that they have the required qualifications, a single person can take over more than one role if necessary.
Role Required qualifications Tasks
Combi oven own‐ er or the owner’s em‐ ployee who is re‐ sponsible for the unit and for the staff operating it
Is familiar with the rules involved in han‐ dling heavy loads
Briefed on all of the combi oven’s safety-relevant functions, mecha‐ nisms, and devices by the person placing the unit into operation so that the information can be relayed to all the staff operating the unit
Shown how the unit is operated by the person placing the unit into op‐ eration so that the information can be relayed to all the staff operating the unit
If necessary, helping out as direc‐ ted with transportation within the facilities and with setting up the unit
Mover
Trained in the use of forklifts and/or pallet jacks
Is familiar with the rules involved in handling heavy loads
Transporting the unit within the facili‐ ties
Service technician■Qualified staff from an authorized
service company
Has relevant technical training
Has unit-specific training
Is familiar with the rules involved in handling heavy loads
Is able to assess whether the unit’s power, gas, water, and drain connec‐ tions have been correctly set up.
If performing maintenance work on the gas system: Is part of the mainte‐ nance staff of a service company au‐ thorized by the gas utility
Setting up the unit
Installing the fully automatic oven cleaning system
Placing the unit into operation
Removing the unit from service
Gas technician
Is a technician authorized by the gas provider
Has relevant training
Qualified staff from an authorized service company
Connecting the unit to the gas con‐ nection at the facilities
Uninstalling gas connections
Electrician
Qualified staff from an authorized service company
Has relevant training
Is a qualified electrician
Connecting the unit to the electri‐ cal connection at the facilities
Uninstalling electrical connections
2 For Your Safety
16
Page 17
Role Required qualifications Tasks
Water and waste‐ water installer
Qualified staff from an authorized service company
Has relevant training
Connecting the unit to the water connection at the facilities
Uninstalling water connections
Connecting the unit to the drain connection at the facilities
Uninstalling the drain connection
Person placing the unit into operation (service techni‐ cian)
Is an employee from an authorized service company who is responsible overall for placing the unit into opera‐ tion
Has relevant technical training
Has unit-specific training
Is familiar with the rules involved in handling heavy loads
Is able to assess whether the unit’s power, gas, water, and drain connec‐ tions have been correctly set up.
Briefing the owner or the responsi‐ ble employee
Checking all steps and conditions as per the checklists
Work areas during installation and placement into operation
During installation and placement into operation, the work area for staff will be the entire area occu‐ pied by the unit and its surroundings.
2 For Your Safety
17
Page 18
3  Stacking kit version layouts and components
Purpose of this section
This section provides detailed information on the various stacking kit versions and components. The combi oven being used on the bottom is what determines which stacking kit you should choose.
3.1  Combinations allowed
Permissible combinations with 6.10 / 10.10 unit sizes
6.10 on 6.10 with 6” base height
6"
6”/8” (marine model)
6.10 on 10.10 with base height of
6"
6”/8” (marine mod‐ el)
6.10 on 6.10 with rollers, 4”/6” base height
6.10 on 10.10 with rollers, 4”/6” base height
6.10 on 6.10 with 12” base height
Permissible combinations with 6.20 / 10.20 unit sizes
6.20 on 6.20 with base height of
6"
6”/8” (marine model)
6.20 on 10.20 with base height of
6"
6”/8” (marine mod‐ el)
6.20 on 6.20 with rollers, 4”/6” base height
6.20 on 10.20 with rollers, 4”/6” base height
6.20 on 6.20 with 12” base height
3 Stacking kit version layouts and components
18
Page 19
3.2  Versions and Components
Component
Item number Version Unit type For the following units
3455861
3455864
Stacking kit with 6” base height ES/EB
6.10 on 6.10
6.10 on 10.10
6.20 on 6.20
6.20 on 10.20
3455868
3455869
Stacking kit with 6” base height Marine model (disappearing door)
ES/EB
6.10 on 6.10
6.10 on 10.10
6.20 on 6.20
6.20 on 10.20
3462090
3462091
Stacking kit with 8” base height Marine model (disappearing door)
ES/EB
6.10 on 6.10
6.10 on 10.10
6.20 on 6.20
6.20 on 10.20
3465632
3465634
Stacking kit with 6” base height Marine model (right-hinged door)
ES/EB
6.10 on 6.10
6.10 on 10.10
6.20 on 6.20
6.20 on 10.20
3465633
3465635
Stacking kit with 8” base height Marine model (right-hinged door)
ES/EB
6.10 on 6.10
6.10 on 10.10
6.20 on 6.20
6.20 on 10.20
3455862
3455865
Stacking kit with rollers, 4” base height
ES/EB
6.10 on 6.10
6.10 on 10.10
6.20 on 6.20
6.20 on 10.20
3462275
3462276
Stacking kit with rollers, 6” base height
ES/EB
6.10 on 6.10
6.10 on 10.10
6.20 on 6.20
6.20 on 10.20
3456266
3456267
Stacking kit with 12” base height
ES/EB
6.10 on 6.10
6.10 on 10.10
6.20 on 6.20
6.20 on 10.20
3456171
3456174
Stacking kit with 6” base height GS/GB
6.10 on 6.10
6.10 on 10.10
6.20 on 6.20
6.20 on 10.20
3456172
3456175
Stacking kit with rollers, 4” base height
GS/GB
6.10 on 6.10
6.10 on 10.10
6.20 on 6.20
6.20 on 10.20
3462277
3462278
Stacking kit with rollers, 6” base height
GS/GB
6.10 on 6.10
6.10 on 10.10
6.20 on 6.20
6.20 on 10.20
3456276
3456277
Stacking kit with 12” base height
GS/GB
6.10 on 6.10
6.10 on 10.10
6.20 on 6.20
6.20 on 10.20
3 Stacking kit version layouts and components
19
Page 20
Item number Version Unit type For the following units
Optional
3416730 Wastewater installation kit Two units
3423745 Single water connection kit Two units
3423747 Double water connection kit Two units (if there is soft water and hard water)
3455859 Wall anchoring kit for stacking
kit
One unit
3 Stacking kit version layouts and components
20
Page 21
3.3  Center Adapter for Electrical Units
Stacking kit parts: Center Adapter for Electrical Units
The figure below shows a size 6.20 center adapter for electrical units used as an example represent‐ ing all unit sizes:
1
3
8
6
5
7
11
12
15
16
17
18
13
2
4
9
10
14
No. Designation Qty.
1
Left side cover 1
2
Baffle 1
3
DIN 53085 M5 x 10 A2 serrated flange screw 2
4
M4 A4 serrated face nut 2
5
Closed moisture removal box 1
6
1.6” – 2.4” hose clamp 2 (for 10.10/10.20)
7
Sleeve 1 (for 10.10/10.20)
8
Intake duct 1 (for 10.10/10.20)
9
DN 50 gland grommet 1 (for 6.10/10.10)
2 (for 6.20/10.20)
10
Exhaust air bracket 1
11
Air vent extension 1 (for 6.10/10.10)
2 (for 6.20/10.20)
12
Fan 2
13
Rear cover 1
14
M4 x 10 A2 pan head screw 7
3 Stacking kit version layouts and components
21
Page 22
No. Designation Qty.
15
Right side cover 1
16
DIN 933 M8x40 screw 4
17a
DIN 7982 8 x 25 counter‐ sunk screw
(depending on the unit version)
5
17b
M5 x 25 A2 countersunk screw
5
18
Front cover 1
3 Stacking kit version layouts and components
22
Page 23
3.4  Center Adapter for Gas Units
Stacking kit parts: Center Adapter for Gas Units
The figure below shows a size 6.20 center adapter for gas units used as an example representing all unit sizes:
51 2 3 4 6
7
8 9 5 10 11 12 5 13
15
16
17
14
18
19
15
20
21
2223
No. Designation Qty.
1
Left side cover 1
2
Baffle 1
3
DIN 53085 M5 x 10 A2 serrated flange screw 2
4
Intake duct 1 (for 10.10/10.20)
5
M4 A4 serrated face nut 16
6
Closed moisture removal box 1
7
1.6” – 2.4” hose clamp 2 (for 10.10/10.20)
8
Sleeve 1 (for 10.10/10.20)
9
Exhaust gas flue box 1
10
Flue extension 1 (for 6.10/10.10)
2 (for 6.20/10.20)
11
Exhaust air bracket 1
12
DN 50 gland grommet 1 (for 6.10/10.10)
2 (for 6.20/10.20)
13
Exhaust duct 1
14
Exhaust duct cover 1
3 Stacking kit version layouts and components
23
Page 24
No. Designation Qty.
15
M4 x 10 A2 pan head screw 12
16
Heat shield 1
17
Air vent 2 (for 6.20/10.20)
1 (for 6.10/10.10)
18
Fan 2
19
Rear cover 1
20
Right side cover 1
21
DIN 933 M8x40 screw 4
22a
DIN 7982 8 x 25 countersunk screw
(depending on the unit version)
5
22b
M5 x 25 A2 countersunk screw 5
23
Front cover 1
3 Stacking kit version layouts and components
24
Page 25
3.5  6” base
Stacking kit parts: 6” base
The following figure shows a 6” base for a stacking kit:
1
2
3
4
5
6
No. Designation Qty.
1
Base 1
2
Adjustable foot 4
3
e S8 A2 P2 P3 serrated washer 4
4
DIN 931 M8 x 70 A2 P4 hex screw 4
5
DIN 7976 4.8 x 80 A2 P4 hex washer head self-tapping screw 2
6
DIN 931 M5 x 75 A2 P4 hex screw 2
3 Stacking kit version layouts and components
25
Page 26
3.6  12” base
Stacking kit parts: 12” base
The following figure shows a 12” base for a stacking kit:
1
2
4
6
5
3
No. Designation Qty.
1
Base 1
2
Adjustable foot 4
3
e S8 A2 P2 P3 serrated washer 4
4
DIN 931 M8 x 70 A2 P4 hex screw 4
5
DIN 7976 4.8 x 80 A2 P4 hex washer head self-tapping screw 2
6
DIN 931 M5 x 75 A2 P4 hex screw 2
3 Stacking kit version layouts and components
26
Page 27
3.7  Base with rollers
Stacking kit parts: Base with rollers
The following figure shows a base with rollers for a stacking kit:
78
1
2
3
4
5
6
No. Designation Qty.
1
Upper section of base 1
2
Rear roller (4” or 6” base height) 2
3
e S8 A2 P2 P3 serrated washer 4
4
DIN 931 M8 x 70 A2 P4 hex screw 4
5
DIN 7976 4.8 x 90 A2 P4 hex washer head self-tapping screw 2
6
DIN 931 M5 x 75 A2 P4 hex screw 2
7
Front roller (4” or 6” base height) 2
8
Leveling kit 1
3 Stacking kit version layouts and components
27
Page 28
3.8  Marine Model Base
Stacking kit parts: Marine Model Base
The following figure shows a marine model base for a stacking kit:
2
3
4
5
6
7
1
No. Designation Qty.
1
Foot retainer 4
2
Marine Model Base 1
3
Adjustable foot 4
4
e S8 A2 P2 P3 serrated washer 4
5
DIN 931 M8 x 70 A2 P4 hex screw 4
6
DIN 7976 4.8 x 80 A2 P4 hex washer head self-tapping screw 2
7
DIN 931 M5 x 75 A2 P4 hex screw 2
3 Stacking kit version layouts and components
28
Page 29
4  Planning for Setup and Assembly
Purpose of this section
This section provides information on the requirements that apply when setting up a stacking kit. It includes the basic installation steps involved, as well as information regarding the tools and materials you will need.
4.1    Working Safely During Setup and Assembly
For your and your employees’ safety
Familiarize yourself with the contents in the 'For Your Safety' section before your employees work with the combi oven for the first time and set all the rules that will be required accordingly.
Prerequisites
Check whether the following prerequisites are met:
The units have been de-energized.
The units have been disconnected from the water supply and the wastewater handling system.
The gas flow to the unit has been shut off.
The units are cold.
The oven cavities in both units are empty (rack, suction panel, sheet pans, etc.).
All reservoirs (collector, boiler, and drain box) and all hoses have been pumped dry in both units.
The grease filter for the top unit (if any) has been removed.
The cleaning agent connections have been removed.
All peripheral accessories (hoods and heat shields) have been removed.
The parts in the stacking kit have been unpacked and checked to make sure that they are com‐ plete.
The protective films on the covers have been removed before installation.
6.10/10.10: There are at least four people available for moving and lifting the unit or, alternatively, there is appropriate equipment available for doing so.
6.20/10.20: There are at least eight people available for moving and lifting the unit or, alternatively, there is appropriate equipment available for doing so.
4.2  Installation Location Requirements
Prerequisites
The following prerequisites must be met:
You have read and understood the combi oven’s installation manual.
Supporting surface
The supporting surface must have the following characteristics:
The supporting surface must be flat and level.
The supporting surface must be able to bear the sum of the unit weight (including the maximum permissible loading weight (see 'Technical Data' section in the installation manual)), the accesso‐ ries’ weight, and the stacking kit weight (stacking kit weights listed below).
4 Planning for Setup and Assembly
29
Page 30
Stacking kit weights
Depending on the specific size and version, the stacking kit will weigh between 66 and 110 lbs (not including any units or accessories).
Stacking kit combinations featuring electrical and gas units
The following applies to stacking kit combinations featuring electrical and gas units:
If the electrical unit is on the bottom: Use an electrical stacking kit (unit on ES/EB unit)
If the gas unit is on the bottom: Use a gas stacking kit (unit on GS/GB unit)
4.3  Required Tools and Materials
Required tools
6-mm Allen key
Socket wrench with a width across flats of 7 mm, 8 mm
Open-end wrench with a width across flats of 8 mm, 13 mm
Phillips screwdriver
File
Caliper / measuring tape
Spirit level
Material required
High heat silicone (enclosed in the package)
Lubricant (enclosed in the package)
Tools and materials for assembly
Store the pieces of lumber included with the packaging in a safe place for later use as assembly aids.
For 6.10/10.10 on the bottom and 6.10 on top: dimensions – 2.3” x 2.3” x 37”
For 6.20/10.20 on the bottom and 6.20 on top: dimensions – 2.3” x 2.3” x 43”
Store the eight styrofoam blocks included with the packaging in a safe place for later use as as‐ sembly aids.
Use a lifting device appropriate for the combi oven’s weight.
If necessary, you can request an installation video from Technical Customer Service.
4 Planning for Setup and Assembly
30
Page 31
4.4  Basic installation procedure
Basic installation procedure
The figures below show a stacking kit for gas units for stacking a size 6.10 unit on a size 10.10 unit. They are used as an example representing all unit sizes and unit models:
1.
Install the exhaust extension (if necessary)
2.
The bottom combi oven is mounted on the base
3.
Install the center adapter
4.
The top combi oven is installed
5.
The flue is installed
4 Planning for Setup and Assembly
31
Page 32
5  Assembly
Purpose of this section
This section provides detailed information on the assembly steps required for the stacking kit.
This section is intended exclusively for installers and authorized customer service companies.
Prerequisites
The following prerequisites must be met:
You have read and understood the 'For Your Safety' section.
5.1  Installing the Exhaust Duct Extension on the Bottom Unit
Checking the exhaust duct projection
1.
Use the caliper or a measuring tape to measure the pro‐ jection at the lowest point of the exhaust duct located at the rear right of the unit’s top panel.
6.10/10.10: one exhaust duct
6.20/10.20: two exhaust ducts Make sure that you measure the distance between the exhaust duct and the actual top panel (do not start meas‐ uring from the black gasket)
2.
If the height exceeds 0.6”, the exhaust duct extension does not need to be installed.
If the height is less than 0.6”, the exhaust duct extension needs to be installed.
Checking the exhaust duct’s chamfer
1.
Insert the enclosed exhaust duct extension into the ex‐ haust duct.
2.
Check to make sure that the chamfers match.
5 Assembly
32
Page 33
Installing the exhaust duct extension
1.
Clean the inside of the exhaust duct as far as you will be inserting the exhaust duct extension.
2.
Clean the outside of the exhaust duct extension.
3.
Apply a bead of high heat silicone all around the bottom of the exhaust duct extension.
4.
Insert the exhaust duct extension into the exhaust duct.
5 Assembly
33
Page 34
5.
Slide the exhaust duct extension as far as it will go into the exhaust duct.
6.
Wipe off the excess silicone.
7.
Check to make sure that the gap between the exhaust duct extension and the exhaust duct is completely filled with silicone.
8.
Check to make sure that the exhaust duct extension is centered inside the exhaust duct.
9.
If possible, let the silicone cure before installing the ac‐ cessories!
If you lift the accessories after assembly (before the sili‐ cone has cured), make sure to check once again that the exhaust duct extension is in the correct position.
5 Assembly
34
Page 35
5.2  The bottom combi oven is mounted on the base
The figures below show a stacking kit for gas units. They are used as an example representing all unit sizes and unit models.
Preparing the bottom unit
1.
Make sure that the bottom unit’s oven cavity is empty (re‐ move the racks, suction panel, sheet pans, etc.).
2.
Lift the bottom unit off from the shipping pallet.
6.10/10.10: There must be at least four people available
6.20/10.20: There must be at least eight people available
3.
Remove all screws from the shipping pallet.
4.a
With several people, carefully place the bottom unit on its back side on the shipping pallet.
To prevent damage to the rear panel, use a suitable sur‐ face (e.g., cardboard divider and styrofoam board from the packaging) to protect the unit.
Do not lift or carry too much weight during the process! Caution: Risk of injury due to excessive exertion!
4.b
In the case of units with a disappearing door, make sure not to damage the black block on the side!
5 Assembly
35
Page 36
5.a
Stacking kit with 6” or 12” base height Place the stacking kit base at the intended installation lo‐
cation and use a spirit level to level it by adjusting the feet.
5.b
1
2
Stacking kit with rollers (4” or 6” base height) Use the nuts included with the installation kit to install the
rollers on the stacking kit’s base (long rollers (1) in the back, short rollers (2) in the front). Place the base with rollers at the intended installation lo‐ cation and use a spirit level to level it
You can replace the small rollers with the big ones as necessary (in the back or front) in order to level the base.
6.
Remove the four feet.
Safely store the flat washers. You will be reusing them later.
5 Assembly
36
Page 37
7.
Before starting to fasten the base, remove the two retain‐ ing screws for the left side panel at the bottom of the unit.
8.
Install the water distributor, hoses, tubes, gas angle bracket, and cleaning agent lines as applicable.
Fastening the base
1.
Stacking kit with 6” or 12” base height
1.a
Use an open-end wrench with a width across flats of 13 mm and the four enclosed hex screws, the serrated washers, and the flat washers to fasten the base.
1.b
Additionally, fasten the two enclosed long hex screws on the left side of the base in order to ensure the outer case’s stability during setup.
Appropriate screws for the various stacking kit versions will be enclosed. Use self-tapping screws or metric screws depending on the version.
2.
Stacking kit with rollers
5 Assembly
37
Page 38
2.a
Use an open-end wrench with a width across flats of 13 mm and the four enclosed hex screws and the serrated washers to fasten the base with the rollers (rollers with lock in the front).
2.b
Use a socket wrench with a width across flats of 8 mm to lock the brakes. Notice: Release the brakes before moving the unit or the stacking kit.
3.
Mount the bend on the drain box’s drain. Secure the bend with a hose clamp.
4.
Put the unit back upright. Caution: Risk of injury!
5 Assembly
38
Page 39
5.3  Installing the Center Adapter
The figures below show a stacking kit for gas units. They are used as an example representing all unit sizes and unit models.
Preparation steps
1.
Remove the two long screws on the left side of the base. Remove the left side panel.
2.
Install the water distributor, hoses, tubes, gas angle bracket, and cleaning agent lines as applicable.
3.
10.10/10.20:
3.a
Disconnect the grounding cable from the spade terminal on the dry air intake.
3.b
Use a Phillips screwdriver to loosen the screw on the dry air intake pipe’s hose clamp until the clamp can be pulled over the spade terminal.
For all unit models:
4.a
Push the dry air intake pipe as far up as possible (1). Turn the venting valve to the right (2).
5 Assembly
39
Page 40
4b
Pull the dry air intake down. Dispose of the pipe that is cut at an angle. You will not be needing it anymore.
4.c
Turn the venting valve back to its original position. Make sure that the gasket is in its correct end position.
5.
Apply a bit of lubricant (e.g., soap) to the air vent(s).
6.
Remove the covers from the center adapter.
6.a
Front cover: Slightly pull the cover on the left side towards the front
and away from the magnet (1). Disengage the cover from the tab on the right (2) and re‐ move the cover.
5 Assembly
40
Page 41
6.b
Side covers: Disengage the left and right side covers from the tabs in
the front and back.
6.c
Rear cover: Use a Phillips screwdriver to unscrew the seven pan head
screws.
Remove the rear center adapter cover.
7.
Use a Phillips screwdriver to remove the five screws at the top of the unit. You will not be using these screws anymore.
8.
Place the center adapter on the bottom unit.
9.
Position the center adapter: Make sure to carefully place the center adapter in such a way that the exhaust vent goes into it smoothly. Make sure that the exhaust vent has no leaks.
5 Assembly
41
Page 42
Fastening the center adapter
1.
Before inserting the screws, squeeze silicone into the dril‐ led holes.
2.
Use the five enclosed countersunk screws to screw the center adapter in place. Use silicone with all five countersunk screws in order to secure the joint, make it water tight, and prevent water from penetrating the bottom unit. Appropriate screws for the various stacking kit versions will be enclosed. Use self-tapping screws or metric screws depending on the version.
Installing the moisture removal box
1.a
10.10/10.20 Slip the hose clamp (1) and the sleeve (2) onto the intake
duct.
1.b
After slipping the sleeve on all the way to its middle, se‐ cure it with the hose clamp.
5 Assembly
42
Page 43
2.a
Insert the bottom end of the intake duct into the dehumidi‐ fier valve’s gasket and slide the second hose clamp onto the sleeve.
2.b
Connect the grounding cable to the intake duct’s spade terminal.
3.
Apply lubricant to the moisture removal box’s pipe sec‐ tion. Carefully insert the moisture removal box. Make sure that the gasket is in its correct position and has a proper fit.
4.
Use the serrated face nuts to secure the moisture remov‐ al box on the unit’s top panel.
5 Assembly
43
Page 44
5.
Use the sleeve and the hose clamp to connect the intake duct and the bottom end of the moisture removal box. Make sure that the gaskets and the sleeve are in their correct position and have a proper fit.
6.10/6.20: Insert the bottom end of the moisture removal box into the
dehumidifier valve’s gasket.
6.
Install the left side panel.
For gas units only: Installing the flue parts
1.
Remove the exhaust gas flue box from the center adapt‐ er.
2.
Attach the two flue extensions to the two exhaust outlets. Notice: In the case of sprayer units, only one flue exten‐
sion is required.
3.
Place the exhaust gas flue box on the center adapter studs intended for this purpose.
5 Assembly
44
Page 45
4.
Use the serrated face nuts (M4) to secure the exhaust gas flue box.
5.
Install the rear cover. Notice: Depending on the specific stacking kit version, it may be necessary to open holes on the rear cover.
5 Assembly
45
Page 46
5.4  Installing the Top Unit
The figures below show an electrical stacking kit for stacking a size 6.10 unit on a size 6.10 unit. They are used as an example representing all unit sizes and unit models:
Preparing the top unit
1.
Make sure that the top unit’s oven cavity is empty (re‐ move the racks, suction panel, sheet pans, etc.).
2.
Set the left unit side down on two foam blocks (one at each end) (found in the packaging).
3.
Set the right unit side down on two groups of two foam blocks (one at each end).
4.
Remove the feet from the right unit side.
5.
Remove the two upper foam blocks on the right unit side and lower the unit.
6.
Add two more foam blocks underneath the left unit side (one at each end).
5 Assembly
46
Page 47
7.
Remove the feet from the left unit side.
8.
Make sure that the grease filter (if any) has been re‐ moved.
9.
Secure the bend.
10.
Remove the two upper foam blocks on the left unit side and lower the unit.
Setting up the unit on top
Suggestion for installation with a lifting device:
1.
Align both units in front of each other. Make sure that the units’ doors are closed.
2.
Move the lifting device underneath the unit. Make sure to position the lifting device’s forks next to the covers for the pumps and the drain box.
3.
Set down two pieces of lumber underneath in order to protect the unit. For 6.10/10.10 on the bottom and 6.10 on top: dimensions – 2.3” x 2.3” x 37” For 6.20/10.20 on the bottom and 6.20 on top: dimensions – 2.3” x 2.3” x 43” Make sure to position the pieces of lumber in such a way that the base components will not be damaged.
4.
Lift the unit.
5 Assembly
47
Page 48
5.
Place four groups of two foam blocks (enclosed with the packaging) on the center adapter – one in each corner.
6.
Move the top unit over the foam blocks and align it with the bottom unit.
Make sure that in each foam block group, the two foam blocks are perfectly aligned with each other.
7.
Carefully lower the top unit onto the foam blocks.
8.
Remove the two pieces of lumber.
9.a
Remove the two upper foam blocks on the right unit side.
9.b
Carefully lower the unit.
10.a
Remove the two upper foam blocks on the left unit side.
5 Assembly
48
Page 49
10.b
Carefully lower the unit.
11.a
Use a piece of lumber (1) to slightly lift the unit careful‐ ly. Remove the remaining foam blocks. Position the unit on the pins (2) on both sides.
11.b
Make sure that the four pins on the center adapter are in the correct position inside the corresponding holes at the bottom of the unit. Caution: Crush hazard!
12.
Use the enclosed hex screws (M8 x 40) to secure the unit on the center adapter at the locations where the four feet would be.
5 Assembly
49
Page 50
Making the electrical connection
1.
Remove the top unit’s left side panel.
2.
In the top unit’s electrical wiring compartment, on the left side, knock out the lower perforated opening for the grom‐ met.
3.a
Slit the grommet.
3.b
Push the grommet into the opening.
4.
Route the cable for the cooling fan. Caution: 12 V! Make sure not to damage the connection cable.
5 Assembly
50
Page 51
5.
Connect the stacking kit’s fan cable to the supply mod‐ ule’s 12 V terminals (+ and -). Caution: 12 VDC!
Make sure to route the cable properly inside the wiring compartment and to use the correct polarity when making the connections:
Stacking kit cable Power supply module Brown: +2T0 Blue: + Blue: -2T0 White: -
6.
Install the top unit’s left side panel.
Securing the drain pipe
1.
Remove the center adapter’s rear cover.
2.
Connect the top unit’s drain pipe to the bend.
3.
Insert the rear cover and fasten it using the seven pan head screws. Make sure that the drain connection is installed correct‐ ly. The drain pipe needs to go out towards the back through the intended opening on the rear cover. Notice: Depending on the specific version, it may be necessary to open holes on the rear cover.
Installing the air vent(s)
1.
Use a Phillips screwdriver to remove the three rear screws at the top of the top unit.
2.
Push the grommet into the opening on the mounting bracket (one or two openings depending on the specific unit version).
3.
Fasten the mounting bracket for the air vents using the screws you previously removed from the upper rear edge of the unit.
5 Assembly
51
Page 52
4.
Grease the grommet.
5.
Install the long air vent(s).
5 Assembly
52
Page 53
For gas units only: Installing the exhaust duct
1.
Place the exhaust duct on the studs intended for this pur‐ pose and use the four enclosed serrated face nuts (M4) to secure it.
2.
Use the three enclosed serrated face nuts (M4) to fasten the heat shield onto the exhaust duct cover.
3.
Use the six enclosed pan head screws (M4 x 10) to mount the exhaust duct cover on the exhaust duct.
5 Assembly
53
Page 54
Installing the connections
1.
Route the water and cleaning agent connections, all ca‐ bles, and the gas connection (in the case of gas units) through the opening on the rear panel. Make sure to install them correctly as specified in the in‐ stallation manual for your combi oven. Check all water and cleaning agent connections, as well as the gas con‐ nection (in the case of gas units), for leaks.
2.a
Setup for cleaning with two canisters.
2.b
Setup for cleaning with four canisters.
Installing the covers
1.
Install the center adapter’s left cover:
1.a
Use a socket wrench with a width across flats of 8 mm and the two serrated flange screws (M5 x 10) to fasten the center adapter’s baffle onto the left side cover.
5 Assembly
54
Page 55
1.b
Make sure that the baffle’s bent edge is at the top.
1.c
Mount the left cover on the center adapter using the mag‐ net/tab mechanism.
2.
Mount the right cover on the center adapter using the magnet/tab mechanism.
3.
On the top unit, bend the the door contact switch holding plate 90° downwards at the perforation.
5 Assembly
55
Page 56
4.
Knock out the appropriate perforated section on the front cover as required for the unit combination door being used.
Right-hinged door on bottom Right-hinged door on top
1 and 2
Disappearing door on bottom Disappearing door on top
--
Disappearing door on bottom Right-hinged door on top
2
Right-hinged door on bottom Disappearing door on top
1
Use a file to deburr the knockout edges.
5.
Open the top unit’s door.
6.
Mount the front cover.
7.
Put the suction panels and the racks back in place in both units.
8.
Use a spirit level to check once again that the unit is level.
5 Assembly
56
Page 57
5.5  Wall Anchoring (Optional) / Marine Model / Retaining Element
Wall anchoring
In order to minimize the risk of the stacking kit toppling over, the stacking kit can be secured to the wall using the enclosed wall anchoring kit for stacking kits (optional).
1.
Attach the wall bracket.
Marine model
Bolt or weld the bottom unit’s feet onto the floor.
Retaining element
Secure the unit before pulling the stacking kit out.
Make sure that the electrical and gas connections are not disconnected.
Use a suitable lifting device.
5 Assembly
57
Page 58
5.6  Affixing Warning Labels
Location of warning labels on the combi oven
The figure below shows a stacking kit used as an example representing all unit sizes:
Type and location of the warning labels that need to be affixed (if not affixed already)
The following warning labels need to be affixed at the defined locations on the combi oven.
Warning Location on combi oven
In general, on the left-hand side of the unit door, in area 2 (see 'Warning Labels on the Combi Oven'), depending on the setup used Right above the door handle if:
The unit’s upper edge is at a height greater than 47.2” or
The staff that will be using the unit consists primarily of semi-skilled employees (recommendation)
At the very top of the unit door if:
The unit’s upper edge is at a height of 47.2” or less
On the left-hand side of the unit door, in area 2 (see 'Warning Labels on the Combi Oven'), at a height of 63' relative to the kitchen floor
Combi oven tip-over hazard warning There is a risk of the combi oven toppling over when being moved. Exercise extreme caution when moving the combi oven.
Unit hookup damage and disconnection warning There is a risk of the unit’s hookups being damaged or disconnected when the combi oven is moved. Exercise extreme caution when moving the combi oven and take the connections’ length into account. Every time after moving it, secure the combi oven so that it cannot roll away by accident.
5 Assembly
58
Page 59
5.7  Additional Work
Overview of additional work required
For information on the following tasks and details, please refer to the installation manual for the combi oven:
Connecting the combi oven
Placing into operation and disposal
Special equipment and accessories
Technical data, scale drawings, and connection drawings
Checklists and Completing the Installation
5 Assembly
59
Page 60
6  Placing into operation
Purpose of this section
This section goes over how to place your combi ovens into operation once they are on the stacking kit.
6.1  Procedure for Placing the Unit into Operation
Meaning
This section is intended to provide commissioning staff with an overview of the prerequisites that must be met before placing the combi ovens into operation, as well as with information on how to place them into operation.
Prerequisites
The following prerequisites must be met:
You must have familiarized yourself with the work listed in the combi oven’s operating manual and, in particular, with the hazards involved in operating the unit.
Additional checks before placing the units into operation
Before putting the combi ovens into operation, and in addition to the prerequisites listed in the combi oven installation manual’s 'Placing Into Operation, Removal from Service, and Disposal' section, check to make sure that the following prerequisites are met:
You have used the required supply air and exhaust ducts for the bottom unit.
You have checked the connection cable and its routing.
You have connected the units to a grounding system.
You have checked the supply water and wastewater systems’ routing.
You have checked the cleaning agent tubes’ routing.
You have checked that the fans are connected correctly and are working properly.
You have checked that the door contact switch is working properly.
You have secured the units with a wall anchoring kit or with another method in order to ensure that they will not move.
In the case of marine models: You have bolted or welded the bottom unit’s feet onto the floor.
In the case of stacking kits on rollers: The rollers’ brake and swivel locks are locked.
In gas units: You are using the required gas exhaust system.
In gas units: You have checked for gas leaks.
In gas units: You have checked the exhaust gas readings.
Do not place the units into operation unless all specified prerequisites are met.
Placing into operation
To place the combi ovens into operation, follow the steps in the combi oven’s installation manual.
Customer briefing
Tell the customer about the following safety and operation-relevant requirements and information:
When running the bottom unit at high temperatures for a prolonged time, the top unit should also be turned on so that the fan cooling system will be activated.
The unit, the center adapter, the base, and the rollers are fastened to each other.
The covers (both left side panels) are properly installed back in place.
6 Placing into operation
60
Page 61
7  Cleaning and maintenance
Purpose of this section
This section provides information on the cleaning and maintenance schedules and explains how to clean and maintain your unit.
7.1  Cleaning Work
Prerequisites
Before performing any cleaning work, check to make sure that the following prerequisites are met:
You must have already read and understood how to perform the work described in “Cleaning In‐ structions” in the combi oven’s operating manual.
You must have already read and understood the additional hazards and safety measures listed in “For Your Safety” in these assembly instructions.
7.2  Maintenance Work
Prerequisites
Before performing any maintenance work, check to make sure that the following prerequisites are met:
You must have already read and understood how to perform the work described in “Maintenance Instructions” in the combi oven’s operating manual.
You must have familiarized yourself with the work listed in the combi oven’s installation manual and, in particular, with the corresponding hazards and safety measures.
You must have already read and understood the additional hazards and safety measures listed in “For Your Safety” in these assembly instructions.
You must have familiarized yourself with the stacking kit’s setup.
Maintenance that must be performed by Customer Service
The table below provides an overview of the intervals for the maintenance work that an authorized customer service company needs to carry out:
How often? What needs to be serviced?
annually
General maintenance
Check all connections
In addition to each annual maintenance rou‐ tine:
Clean the space between the two units
Check that the fans are working properly and clean them
How to do it
Follow the maintenance work instructions in the combi oven’s training manual and repair manual.
7 Cleaning and maintenance
61
Page 62
8  Removing from service
Purpose of this section
This section goes over how to remove your combi ovens from service if you are using them with a stacking kit.
8.1  Procedure for Removing the Unit from Service
Prerequisites
The following prerequisites must be met:
You must have familiarized yourself with the work listed in the combi oven’s installation manual and, in particular, with the hazards involved in removing the unit from service.
Additional checks before removing the units from service
Before removing the combi ovens from service, check to make sure that the following prerequisites are met:
The units have been de-energized.
The gas has been shut off.
The water has been shut off.
Do not remove the units from service unless all specified prerequisites are met.
Removing from service
To remove your units from service, undo all setup and installation work step-by-step in the opposite order (please refer to the “Assembly” section).
Do not move the unit before disconnecting all of its connections.
To remove the combi ovens from service, follow the steps in the combi ovens’ installation manual.
8 Removing from service
62
Page 63
Page 64
9762425_03 ENG_UL 07/18
CONVOTHERM ELEKTROGERÄTE GMBH
TA
LSTRASSE 35, 82436 EGLFING | GERMANY, T +49(0)88 47 67-0, F + 49(0)88 47 414
WW W.CONVOTHERM.COM
Stacking kit Convotherm 4
Serial No.
Item no.
Order No.
Additional technical documentation can be found in the download center at : www.convotherm.com
Welbilt off ers fully-integrated kitchen systems and our products are backed by KitchenCare® aftermarket parts and service. Welbilt’s portfolio of
award-winning brands includes Cleveland™, Convotherm®, Delfi eld®,
tkitchenSM, Frymaster®, Garland®, Kolpak®, Lincoln™, Manitowoc®,
Merco®, Merrychef® and Multiplex®.
© 2018 Welbilt Inc. All rights reserved.
Loading...