Compaq 2T-QINTL-18 Installation Information

ProLiant 1850R Interlock Kit Installation Information
EK-1850R-IN. A01
May 1999
Introduction
The 2T-QINTL-18 interlock kit contains the components for installing the slide assemblies, the interlock system, and the shipping bracket on the rackmounted ProLiant 1850. The interlock system helps prevent cabinet instability by allowing only one system at a time to be pulled out of the cabinet. The shipping bracket is used to secure the ProLiant 1850 in the cabinet during shipment or when moving the cabinet to a new location.
The interlock system consists of a vertical rod, on which are mounted actuator latches for each product installed in the cabinet. These actuator latches engage the interlock actuator on the rear of rackmount systems. When a rackmount system is pulled out of the cabinet, the actuator latches rotate to prevent any other rackmount system that has an interlock actuator from being pulled out of the cabinet.
Table 1 lists the parts that are shipped with the 2T-QINTL-18 interlock kit. The callouts in column 1 refer to the part location in Figure 1.
Table 1 2T-QINTL-18 Interlock Kit Parts List
Figure 1 Callout
¡ ¢
Description Part Number Qty.
24 inch slide assembly 30-56075-01 1 pair Slide bracket, righ t front and left rea r 74-53881-01 2 Slide bracket, right rear and left front 74-53881-02 2 8-32 pan-head screw 90-06038-01 8 Flat washer, .190ID x .051THK 90-06660-00 8 Split washer, .171ID 90- 06690-00 8 8-32 hex nut 90-06561-00 8 Interlock actuato r 74-53871-01 1 Actuator latch 74-48997-02 1 Stabilizer bracket 74-48996-01 1 10-32 threaded nut ba r 74-48998-01 1 10-32 truss-head screw 90-00063-39 4 6-32 truss-head screw 90-00063-10 2 Flat washer, .286ID x .066THK 90-06676-00 2 Split washer 90-07797-00 2 Shipping bracket 74-53874-01 1 Flat washer, .221ID x .051THK 90-06664-00 2 10-32 Kep nut 90-06565-00 2
ProLiant 1850R Interlock Kit Installation Information
EK-1850R-IN 1
© Compaq Computer Corporation . 1999. All Rig hts Reserved.
® Compaq, ProLiant, and the Compaq logo are registered in the United States Patent and Trademark Office.
Installing the Slide Assemblies
The rackmount ProLiant 1850 requires 13.34 cm (5.25 in.) of vertical space or nine contiguous holes in a 48.26-cm (19-in) EIA cabinet.. The bottom hole in this installation area is id en tified as ho le 1 and the to p ho le is iden tified as hole 9 (see Figure 1).
In the following installation procedures, directions are referred to while viewing the rackmount ProLiant 1850 from the front of the cabinet. To install the slide assemblies, refer to Figure 1 and the following procedures:
1. Remove the inner races from the right and left slide assemblies . Set th e inner races aside.
2. Attach the right front slide bracket (P/N 74-53881-01) to the right slide assembly with two 8-32 pan-head
screws , flat washers , split washers , and 8-32 hex nuts .
3. Attach the right rear slide bracket (P/N 74-53881-02) to the right slide assembly with two 8-32 pan-head
screws , flat washers , split washers , and 8-32 hex nuts , but do not tighten.
4. Attach the left front slide bracket (P/N 74-53881-02) to the left slide assembly with two 8-32 pan-head
screws , flat washers , split washers , and 8-32 hex nuts .
5. Attach the left rear slide bracket (P/N 74-53881-01) to the left slide assembly with two 8-32 pan-head screws
, flat wash ers , split washers , and 8-32 hex nuts , but do not tighten.
6. Place the right front slide bracket on the inside of the right front rail and align the slide bracket hole with the
2nd hole of the installation area on the right front rail. Install an M6 screw in the 2nd h o le of the installation area to secure the right front slide bracket to the right front rail.
7. Place the right rear slide bracket on the inside of the right rear rail and align the slide bracket hole with the
2nd hole of the installation area on the right rear rail. Install an M6 screw in the 2nd hole of the installation area to secure the right rear slide bracket to the right rear rail. Tighten the two 8-32 pan-head screws and 8-32 hex nuts that secure the right rear slide bracket to the right slide assembly.
8. Place the left front slide bracket on the inside of the left front rail and align the slide bracket hole with the
2nd hole of the installation area on the left front rail. Install an M6 screw in the 2nd hole of th e installation area to secure the left front slide bracket to the left front rail.
9. Place the left rear slide bracket on the inside of the left rear rail and align the slide bracket hole with the 2nd
hole of the installation area on the left rear rail. Install an M6 screw in the 2nd hole of the installation area to secure the left rear slide bracket to the left rear rail. Tighten the two 8-32 pan-head screws and 8-32 hex nuts
that secure the left rear slide bracket to the left slide assembly.
10. Attach the right inner race to the right side of the ProLiant 1850 chassis and the left inner race to the left side of
the ProLiant 1850 chassis.
11. Pull both slide assemblies out fully to their locked positions, then lift the chassis and position it so that the inner
races fit into the front end of the slide assemblies. Push the chassis into the slide assemblies until it stops, then release the two locking levers and push the chassis all the way into the cabinet.
Caution
Do not lean or place extra weight on the ProLiant 1850 chassis when it is extended on the slides. The slides are only rated for 75 lbs.
2
Loading...
+ 2 hidden pages