Mechanical Installation Instructions
Figure 1: Dimensions are for a ComNet™surface mount unit.
FVR10M
Installation Considerations
This fiber-optic link is supplied as
tandalone module. Units should be
a S
installed in dry locations protected
from extremes of temperature and
humidity.
Standalone Module:
The unit is provided with a mounting
e with a hole for two No.6 pan
plat
head screws (3-mm or 3.55-mm).
Attach the module to a solid piece
ood using two No. 6 pan head
of w
wood screws with a minimum
penetration into the wood of
3/4 inch. (Screw not supplied)
See figure 1.
1. Determine where the module will b
installed, and ensure that there is
adequate space at both ends for
making the various cable
connections and for reading the
diagnostic LEDs.
2. Attach the module to a flat surface
using two mounting screws.
(Not Supplied)
Power Sources - The product should only be operated from the recommended power source.
Use only a UL Class 2 indoor/dry or Class 3 outdoor/wet power supply.
e
WARNING: Unit is to be used with a Listed Class 2 or LPS power supply rated 9-12 VDC @ 1A.
WARNING: This unit should be installed in a restricted access location; available through the use
of a lock and key or other means of security. Access should be limited to service personnel who
have been instructed about the reasons for the restrictions to the location. Any and all
precautions should be taken and controlled by the authority responsible for the location.
INS_FVR10M_REVA
01/20/09
Page 1
FVR10M
INSTALLATION INSTRUCTIONS
SINGLE VIDEO RECEIVER
WITH MANUAL GAIN CONTROL
FROM: FVT11M, FVT20
MULTIMODE
OPTICAL
FIBER
LEDS: RED = “No Activity”
GRN = “Activity”
NOTE: RED DOES NOT MEAN “Error”
Communication Networks
3 Corporate Drive • Danbury, CT 06810 • USA
Tel:203-796-5300 • Toll Free:1-888-678-9427
www.comnet.net
BLACK WITH WHITE STRIPE
BLACK
INS_FVR10M_REVA
01/20/09
Page 2