Columbia MCB-50J, MCB-75J, MCB-100J, MCB-125J, MCB-150J Installation, Operation & Maintenance Manual

...
Page 1
Models
MCB-50J
MCB SERIES II
Cast Iron Gas Fired Boilers
For Forced Hot Water
INST ALLATION, OPERA TION &
MAINTENANCE MANUAL
C.S.A. Certifi ed
For Natural Gas Or Propane
Manufacturedby:
ECRInternational,Inc.
2201 Dwyer Avenue, Utica NY 13501 web site: www.ecrinternational.com
Tested For 100 psi
Working Pressure
ASME
P/N 240009038, Rev. B [04/2012]
Page 2
Figure 1 - Dimensions
DIMENSIONS
Table 1 - Dimensions
Boiler No.
50 ½" 11⅛"5½" 4" 30¾" 36¼" 5¾" 1¼"
75
100 ½" 15 7½" 6" 30¾" 37¼" 6" 1¼" 125 ½" 18⅞"9½" 6" 30¾" 37¼" 6" 1¼" 150 ½" 18⅞"9½" 7" 30¾" 37¾" 6¾" 1¼" 170 ½" 22¾"11½" 7" 30¾" 38¾" 6¾" 1¼"
200
* Propane gas inlet, all units, 1/2"
Natural Gas
Inlet*
½" 15 7½" 5" 30¾" 37¾" 5¾" 1¼"
½" 22¾"11½" 8" 30¾" 38¾" 7¾" 1¼"
ABCDEF
Dimensions
Pump size Supply &
Return Tappings
2
Page 3
TABLE OF CONTENTS
!
1 - Ratings & Data - Natural Gas & Propane Gas ..... 4
2 - Installation Procedure .................................... 5
3 - Ventilation & Combustion Air ........................... 6
4 - Connecting Supply and Return Piping ............... 7
5 - Vent Installation ...........................................12
6 - Vent System Modifi cation ...............................12
7 - Vent Damper Installation & Instructions ...........13
8 - Connecting Gas Service .................................14
9 - Electrical Section ..........................................15
10 - Wiring Diagram .........................................16
11 - Lighting Instructions ...................................17
12 - Normal Sequence of Operation .....................18
13 - General Instructions ....................................18
14 - Checking Gas Input Rate To Boiler .................20
15 - Control Function .........................................21
Safety Symbols & Warnings
The following defi ned symbols are used throughout this manual to notify the reader of potential hazards of varying risk levels.
!
DANGER
Indicates a hazardous situation which, if not avoided, WILL result in death or serious injury
KEEP THIS MANUAL NEAR BOILER
RETAIN FOR FUTURE REFERENCE
IMPORTANT: Read the following instructions COMPLETELY before installing!!
WARNING
!
Fire, explosion, asphyxiation and electrical shock hazard. Improper installation could result in death or serious injury. Read this manual and understand all requirements before beginning installation.
WARNING
!
Keep boiler area clear and free from combustible materials, gasoline and other fl ammable vapors and liquids.
DO NOT obstruct air openings to the boiler room. Modifi cation, substitution or elimination of factory
equipped, supplied or specifi ed components may result in personal injury or loss of life.
TO THE OWNER - Installation and service of this boiler must be performed by a qualifi ed installer.
TO THE INSTALLER - Leave all instructions with boiler for future reference.
When this product is installed in the Commonwealth of Massachusetts the installation must be performed by a Licensed Plumber or Licensed Gas Fitter.
!
WARNING
Indicates a hazardous situation which, if not avoided, could result in death or serious injury.
!
CAUTION
Indicates a hazardous situation which, if not avoided, could result in minor or moderate injury.
NOTICE
Used to address practices not related to personal injury.
3
Page 4
1 - RATINGS & DATA - NATURAL GAS & PROPANE GAS
Table 2 - Ratings and Capacities
Boiler
No.
(1)
Input
Mbh
(1)
Heating
Capacity Mbh
(2)
Net AHRI
Rating Water
Mbh AFUE
No.
of
Burners
(3)
Recommended
Air Cushion
Tank
Water
Content
(Gals.) 50J 50 52 36.3 83.5 1 15 2.4 75J 75 63 54.8 83.1 2 15 4.0
100J 100 83 72 83.0 2 30 4.0 125J 125 104 90 82.0 3 30 5.6 150J 150 124 107.8 83.0 3 30 5.6 170J 170 139 121 82.0 4 30 7.2 200J 200 165 143.4 82.0 4 30 7.2
EXPLANATORY NOTES
-- All boilers are design certifi ed for installation on noncombustible fl oor.
-- For installation on combustible fl oors use combustible fl oor kit.
-- Recommended chimney height 20 feet. In special cases where conditions permit, chimney height may be reduced to 10 feet. Refer to the latest revision of NFGC part 11.
-- Electric service to be 120 Volts, 15 Amps, 60 Hz.
-- The MEA number for the this boiler is 19-79-E.
(1) Input rating for sea level to 2,000 ft. (610m) above sea level.
United States, over 2000 ft (610m) above sea level. Reduce input rate 4% for every 1000 ft (304m) above sea
level.
(2) Net AHRI Water Ratings shown based on piping and pickup allowance of 1.15. Consult manufacturer before selecting
boiler for installations having unusual piping and pickup requirements, such as intermittent system operation, extensive piping systems, etc.
For forced hot water systems where boiler and all piping within area to be heated, boiler may be selected on basis of its heating capacity.
(3) Tank sized for non-ferrous baseboard or radiant panel systems. Increase size for cast iron baseboard and
radiation.
STANDARD EQUIPMENT: Boiler Jacket, Cast Iron Boiler Battery, High Limit Control, Intermittent Electric Ignition Pilot
System, Vent Damper Relay, Theraltimeter Gauge, Circulator With Return Piping To Boiler, Main Gas Burners, Gas Control (Includes Automatic Gas Valve, Gas Pressure Regulator, Intermittent Pilot, Safety Shutoff, Pilot Flow Adjustment, Pilot Filter), A.S.M.E. Relief Valve, Drain Valve, Spill Switch, Rollout Switch, Combination Gas Control, Automatic Vent Damper. Not Shown Are: Wiring Harness, Thermocouple, Non-linting Safety Pilot.
4
Page 5
2 - INSTALLATION PROCEDURE
!
WARNING
Improper installation, adjustment, alteration, service or maintenance could result in death or serious injury
.
1.
Installation must conform to the requirements of the authority having jurisdiction or, in the absence of such requirements, to the National Fuel Gas Code, ANSI Z223.1/NFPA 54.
2.
Where required by the authority having jurisdiction, the installation must conform to the Standard for Controls and Safety Devices for Automatically fi red Boilers, ANSI/ASME CSD-1.
3.
Boiler series is classifi ed as a Category I. Vent installation shall be in accordance with "Venting of Equipment ," of the National Fuel Gas Code, ANSI Z223.1/NFPA 54 or applicable provisions of the local building codes.
4.
Boiler has met safe lighting and other performance criteria with the gas manifold and control assembly on the boiler per the latest revision of ANSI Z21.13/CGA
4.9.
5.
Install boiler such that gas ignition system components are protected from water (dripping, spraying, rain, etc.) during appliance operation and service, (circulator replacement, condensate trap, control replacement, etc.).
6.
Locate boiler on level, solid base as near chimney as possible and centrally located with respect to heat distribution system as practical.
7.
Allow 24 inches (610mm ) at front and right side for servicing and cleaning.
8.
When installed in utility room, door should be wide enough to allow largest boiler part to enter, or to permit replacement of another appliance such as water heater.
!
WARNING
Fire hazard. Do not install boiler on combustible fl ooring or carpeting. Failure to follow these instructions could result in death or serious injury.
9.
FOR INSTALLATION ON NON-COMBUSTIBLE FLOORS ONLY - For installation on combustible fl ooring special base must be used. (See Repair Parts, Optional Kits Manual). Do not install boiler on carpeting. Minimum clearances to combustible construction are:
TOP ....................................18 IN. (457mm)
FRONT .........................................ALCOVE *
FLUE CONNECTOR ................. 6 IN. (152mm)
REAR ................................... 4 IN. (102mm)
CONTROL SIDE ..................... 9 IN. (229mm)
OTHER SIDE ........................... 3 IN. (76mm)
HOT WATER PIPING ................. 2 IN. (51mm)
NOTE: Greater clearances for access should supersede fire
protection clearances. * Defi nition of Alcove is three sided space with no wall in front of boiler. ANSI standard for alcove is 18 inches from front of appliance to leading edge of side walls as shown below.
Minimum Clearances to Combustible
Construction (as seen from above)
4"
9"
BOILER
Front
18"
5
3"
Page 6
3 - VENTILATION & COMBUSTION AIR
Provide combustion air and ventilation air in accordance with the section “Air for Combustion and Ventilation,” of the National Fuel Gas Code, ANSI Z223.1/NFPA 54 or applicable provisions of local building codes.
Provide make-up air where exhaust fans, clothes dryers, and kitchen ventilation equipment interfere with proper operation.
National Fuel Gas Code recognizes several methods of obtaining adequate ventilation and combustion air. Requirements of the authority having jurisdiction may override these methods.
• Engineered Installations. Must be approved by authority having jurisdictions.
• Mechanical Air Supply. Provide minimum of 0.35 cfm per Mbh for all appliances located within space. Additional requirements where exhaust fans installed. Interlock each appliance to mechanical air supply system to prevent main burner operation when mechanical air supply system not operating.
• All Indoor Air. Calculate minimum volume for all appliances in space. Use a different method if minimum volume not available.
о Standard Method. Cannot be used if known air
infi ltration rate is less than 0.40 air changes per hour. See Table 3 for space with boiler only. Use equation for multiple appliances.
3
Volume ≥ 50 ft
x Total Input [Mbh]
о Known Air Infi ltration Rate. See Table 3 for
space with boiler only. Use equation for multiple appliances. Do not use an air infi ltration rate (ACH) greater than 0.60.
• All Outdoor Air. Provide permanent opening(s) communicating directly or by ducts with outdoors.
о Two Permanent Opening Method. Provide opening
commencing within 12 inches of top and second opening commencing within 12 inches of bottom enclosure.
 Direct communication with outdoors or
communicating through vertical ducts. Provide minimum free area of 1 in
2
per 4 Mbh of total
input rating of all appliances in enclosure.
 Communicating through horizontal ducts.
Provide minimum free area of 1 in2 per 2 Mbh of total input rating of all appliances in enclosure.
о One Permanent Opening Method. Provide opening
commencing within 12 inches of top of enclosure. Provide minimum clearance of 1 inch on sides and back and 6 inches on front of boiler (does not supersede clearance to combustible materials).
• Refer to National Fuel Gas Code for additional
requirements for louvers, grilles, screens and air ducts.
• Combination Indoor and Outdoor Air. Refer to National Fuel Gas Code for application information.
Volume ≥ 21 ft3/ACH x Total Input [Mbh]
о Refer to National Fuel Gas Code for opening
requirements between connection indoor spaces.
Table 3 - Space With Boiler Only
Room Cubic Feet Volume
Input Mbh
Standard
Method
50 2500 10500 5250 3500 2625 2100 1750
75 3750 15750 7875 5250 3938 3150 2625
100 5000 21000 10500 7000 5250 4200 3500
125 6250 26250 13125 8750 6563 5250 4375
150 7500 31500 15750 10500 7875 6300 5250
170 8500 35700 17850 11900 8925 7140 5950
200 10000 42000 21000 14000 10500 8400 7000
Known Air Infi ltration Rate Method (ACH - Air Changes Per Hour)
0.1 0.2 0.3 0.4 0.5 0.6
6
Page 7
4 - CONNECTING SUPPLY AND RETURN PIPING
!
WARNING
Burn or Scald Hazard. Discharge line shall be installed to relief valve outlet connection to avoid burns, scalding, or water damage due to discharge of steam and/or hot water during operation.
Discharge line shall:
• connect to relief valve outlet and piped down to safe point of disposal. Check local codes for maximum distance from fl oor or allowable safe point of discharge.
• be of pipe size equal to or greater than that of the relief valve outlet over the entire length of discharge line;
• have no intervening shutoff valve between safety relief valve and discharge to atmosphere (do not plug or place any obstruction in discharge line.
• terminate freely to atmosphere where any discharge will be clearly visible and at no risk of freezing;
• allow complete drainage of the valve and the discharge line;
• be independently supported and securely anchored to avoid applied stress on the relief valve;
• be as short and straight as possible;
• terminate with plain end (not threaded);
• be constructed of material suitable for exposure to temperatures of 375° F (191°C); or greater.
Refer to local codes and appropriate ASME Boiler and Pressure Vessel Code for additional installation requirements.
Figure 2 - Safety Relief Valve
RELIEF VALVE
DISCHARGE
LINE
Check local
codes for
maximum
distance
from fl oor
or allowable
safe point of
discharge.
7
Page 8
4 - CONNECTING SUPPLY AND RETURN PIPING
Circulators in following illustrations are mounted on system supply side, mounting on system return side is also accept­able practice.
Figure 3 ­See Special Conditions, Page 9
Circulators Mounted on Supply System, Boiler Used In Confi guration with Chiller System.
1.
Boiler used in connection with refrigeration system, install so chilled medium is piped in parallel with boiler with appropriate valves to prevent chilled medium from entering boiler. See Figure 2.
2.
Boiler piping system of hot water boiler connected to heating coils located in air handling units where they may be exposed to refrigerated air circulation must be equipped with fl ow control valves or other automatic means to prevent gravity circulation of boiler water during cooling cycle.
3.
Hot water boilers installed above radiation level or as required by authority having jurisdiction must be provided with low water cut-off device.
4.
Boiler connected to heating system utilizing multiple zoned circulators, each circulator must be supplied with fl ow control valve to prevent gravity circulation.
5.
Hot water boilers and system must be fi lled with water and maintained to minimum pressure of 12 psi.
6.
Bypass piping is optional which gives ability to adjust supply boiler water temperature to fi t system or condition of installation. This method of piping, however, is not typically required for baseboard heating systems. Typical installations where bypass piping is used are as follows:
A. This method is used to protect boilers from
condensation forming due to low temperature return water. Generally noticed in large converted gravity systems or other large water volume
systems. Figures 4 and 5.
B. These methods are used to protect systems using
radiant panels and material they are encased in from high temperature supply water from boiler
and protect boiler from condensation.
NOTE#1: When using bypass piping, adjust
valves V1 & V2 until desired system temperature is obtained. See Figure 5, page 9.
NOTE#2: Bypass loop must be same size piping
as supply and return piping.
8
Page 9
4 - CONNECTING SUPPLY AND RETURN PIPING
Figure 4 - Bypass Piping With Mixing Valve
TO SYSTEM
WATER INLET
EXPANSION
TANK
FROM SYSTEM
CIRCULATOR
SHUT-OFF VALVE
PRESSURE REDUCER VALVE
CHECK VALVE
BOILER
BALL VALVE
3 WAY MIXING VALVE
ALTERNATE
CIRCULATOR
LOCATION
Figure 5 - Bypass Piping - Fixed Low Temp Only With Zone Valve
TO SYSTEM
BOILER
V2V1
ALTERNATE
CIRCULATOR
LOCATION
SYSTEM
CIRCULATOR
WATER INLET
EXPANSION
TANK
AIR SEPARATOR
HOSE BIB
FROM SYSTEM
CIRCULATOR
SHUT-OFF VALVE
7. Installation using circulators and zone valves are
shown in Figures 6 through 9. For further piping information refer to AHRI Installation and Piping Guide.
PRESSURE REDUCER VALVE
CHECK VALVE
BALL VALVE
ZONE VALVE
AIR SEPARATOR
!
WARNING
Burn and scald hazard. Safety relief valve could discharge steam or hot water during operation. Install discharge piping per these instructions.
8. Install discharge piping from safety relief valve. See
Warning, Page 7.
9
Page 10
4 - CONNECTING SUPPLY AND RETURN PIPING
Figure 6 - Single Zone System With DHW
Figure 7 - Multi Zone System With Circulators And DHW
10
Page 11
4 - CONNECTING SUPPLY AND RETURN PIPING
Figure 8 - Multi Zone System With Zone Valves And DHW (With Circulator)
Figure 9 - Multi Zone System With Zone Valves And DHW (With Zone Valve)
11
Page 12
5 - VENT INSTALLATION
WARNING
!
Boiler and venting installations shall be performed by a qualifi ed expert and in accordance with the appropriate manual. Installing or venting boiler or other gas appliance with improper methods or materials may result in serious injury or death due to fi re or to asphyxiation from poisonous gases such as carbon monoxide with is odorless and invisible.
!
WARNING
Do not connect boiler to any portion of mechanical draft system operating under positive pressure.
1.
Vent pipe must slope upward from the boiler not less then ¼ inch for every 1 foot (21mm/m) to vent terminal.
2.
Horizontal portions of venting system shall be supported rigidly every 5 feet and at the elbows. No portion of vent pipe should have any dips or sags.
3.
Boiler series is classifi ed as a Category I. Vent installation shall be in accordance with "Venting of Equipment," of the National Fuel Gas Code, ANSI Z223.1/NFPA 54 or applicable provisions of the local building codes.
4.
Inspect chimney. Verify chimney is constructed according to NFPA 211. Vent or vent connector shall be Type B or metal pipe having resistance to heat and corrosion not less than that of galvanized sheet steel or aluminum not less than 0.016 inch thick (No. 28 Ga).
5.
Connect fl ue pipe from draft hood to chimney. Bolt or screw joints together to avoid sags. Flue pipe should not extend beyond inside wall of chimney. Do not install manual damper in fl ue pipe or reduce size of fl ue outlet except as provided by the latest revision of ANSI Z223.13. Protect combustible ceiling and walls near fl ue pipe with fi reproof insulation. Where two or more appliances vent into a common fl ue, the area of the common fl ue must be at least equal to the area of the largest fl ue plus 50 percent of the area of each additional fl ue.
6 - VENT SYSTEM MODIFICATION
When an existing boiler is removed from a common venting system, the system is likely to be too large for the proper venting of the appliances sill connected to it. If this situation occurs, the following test procedure must be followed:
REMOVAL OF BOILER FROM VENTING SYSTEM
At the time of removal of an existing boiler, the following steps shall be followed with each appliance remaining connected to the common venting system placed in operation, while the other appliances remaining connected to the common venting system are not in operation.
1.
Seal an unused opening in the common venting system.
2.
Visually inspect the venting system for proper size and horizontal pitch and determine there is no blockage or restriction, leakage, corrosion and other defi ciencies which could cause an unsafe condition.
3.
Insofar as is practical, close all building doors and windows and all doors between the space in which the appliances remaining connected to the common venting system are located and other spaces of the building. Turn on clothes dryers and any other appliance not connected to the common venting system. Turn on any exhaust fans, such as range hoods and bathroom exhausts, so they operate at maximum speed. Do not operate a summer exhaust fan. Close fi replace dampers.
4.
5.
6.
7.
Place in operation the appliance being inspected. Follow the lighting instructions. Adjust thermostat so appliance will operate continuously.
Test for spillage at the draft hood relief opening after 5 minutes of main burner operation. Use the fl ame of a match or candle, or smoke from a cigarette, cigar or pipe.
After it has been determined that each appliance remaining connected to a common venting system properly vents when tested as outlined above, return doors, windows, exhaust fans, fi replace dampers and any other gas burning appliances to their previous condition of use.
Any improper operation of the common venting system should be corrected so the installation conforms with the National Fuel gas Code, ANSI Z223.1/NFPA 54. When re-sizing any portion of the common venting system, the common venting system should be re-sized to approach the minimum size determined using the appropriate tables in Chapter 13 of the National Fuel Gas Code, ANSI Z223.1/NFPA 54.
12
Page 13
7 - VENT DAMPER INSTALLATION & INSTRUCTIONS
DAMPER INSTALLATION
Follow Damper installation instructions provided with
damper. See Figure 10.
Figure 10 - Damper Motor Wiring
DAMPER INSTRUCTIONS
Figure 11 - Vent Damper Placement
UN-ACCEPTABLE DAMPER LOCATIONS
REFER TO DAMPER MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR POSITION OF DAMPER CONTROL BOX
ACCEPTABLE VENT DAMPER LOCATIONS
CHIMNEY
BOILER
1.
Verify only boiler is serviced by Vent Damper. Figure
HOT WATER HEATER
11.
2.
Clearance of not less than 6 inches (152mm) between Vent Damper and combustible material must be maintained. Additional clearance should be allowed for service of Vent Damper.
3.
Vent Damper must be in the open position when appliance main burners are operating.
4.
Vent Damper position indicator must be in visible location following installation.
5.
Thermostat's heat anticipator must be adjusted to match total current draw of all controls associated with boiler during heating cycle.
13
Page 14
8 - CONNECTING GAS SERVICE
!
!
CAUTION
WHAT TO DO IF YOU SMELL GAS
• Do not try to light any appliance.
• Do not touch any electrical switch; do not use any phone in your building.
• Immediately call your gas supplier from a neighbor’s phone. Follow gas supplier’s instructions.
• If you cannot reach your gas supplier, call the fi re department.
Figure 12 - Gas Piping
General
• Use piping materials and joining methods acceptable to authority having jurisdiction. In absence of such requirements National Fuel gas Code, ANSI Z223.1/ NFPA 54
• Size and install gas piping system to provide suffi cient gas supply to meet maximum input at not less than minimum supply pressure. See Table 4.
• Support piping with hooks straps, bands, brackets, hangers, or building structure components to prevent or dampen excessive vibrations and prevent strain on gas connection. Boiler will not support piping weight.
• Use thread (joint) compound (pipe dope) suitable for liquefi ed petroleum gas.
• Install fi eld sourced manual main shutoff valve, ground joint union, and sediment trap upstream of gas valve. See Figure 12.
Table 5 Natural Gas Propane
Min. Supply Pressure 5" w.c. 11" w.c.
Max. Supply Pressure 13.5" w.c. 13.5" w.c.
Manifold Pressure 3.5" w.c. 10.5" w.c.
MAXIMUM CAPACITY OF PIPE IN CUBIC FEET OF GAS/HOUR
(Gas Pressure = 0.5 psig or less, Pressure Drop = 5 in. w/c)
Table 4
Length of
Pipe (Feet)
10 175 360 680 1400
20 120 250 465 950
30 97 200 375 770
40 82 170 320 660
60 66 138 260 530
80 57 118 220 460
100 50 103 195 400
For additional information refer to the National Fuel Gas Code Handbook.
½” ¾” 1” 1¼”
Nominal Iron Pipe Size
!
DANGER
Fire Hazard. Do not use matches, candles, open fl ames, or other methods providing ignition source. Failure to comply will result in death or serious injury.
Leak Check Gas Piping
Pressure test boiler and gas connection before placing boiler in operation.
•
Pressure test over 1/2 psig (3.5 kPa). Disconnect boiler and its individual gas shutoff valve from gas supply system.
•
Pressure test at 1/2 psig (3.5 kPa) or less. Isolate boiler from gas supply system by closing manual gas shutoff valve.
•
Locate leakage using gas detector, noncorrosive detection fl uid, or other leak detection method acceptable to authority having jurisdiction. Do not use matches, candles, open fl ames, or other methods providing ignition source.
•
Correct leaks immediately and retest.
14
Page 15
9 - ELECTRICAL SECTION
!
WARNING
Electrical shock hazard. Turn OFF electrical power supply at service panel before making electrical connections. Failure to do so could result in death or serious injury.
ELECTRICAL WIRING See wiring diagrams on the following two pages for
details.
Electrically bond boiler to ground in accordance with requirements of authority having jurisdiction. Refer to National Electrical Code, ANSI/NFPA 70.
THERMOSTAT INSTALLATION
1.
Thermostat should be installed on inside wall about four feet above fl oor.
2.
NEVER install thermostat on outside wall.
3.
Do not install thermostat where it will be affected by drafts, hot or cold pipes, sunlight, lighting fi xtures, televisions, fi replace, or chimney.
4.
Check thermostat operation by raising and lowering thermostat setting as required to start and stop burners.
5.
Instructions for fi nal adjustment of thermostat are packaged with thermostat (adjusting heating anticipator, calibration, etc.)
15
Page 16
10 - WIRING DIAGRAM
Figure 13 -
Modifi cation, substitution or elimination of factory equipped, supplied or specifi ed components may result in personal injury or loss of life.
Integrated High Limit Electronic Ignition Control (240008781)
!
WARNING
16
Page 17
11 - LIGHTING INSTRUCTIONS
!
!
WARNING
If you do not follow these instructions exactly, a fi re or explosion may result causing property damage, personal injury or loss of life.
• This appliance is equipped with an ignition device
which automatically lights burner. Do NOT try to
light this burner by hand.
• Before operating smell all around appliance area for gas. Be sure to smell next to fl oor because some gas is heavier than air and will settle to the fl oor.
• Use only your hand to turn the gas shutoff valve. Never use tools. If valve will not turn
by hand, do not try to repair it, call a qualifi ed service technician. Force or attempted repair may result in fi re or explosion.
• Do not use this appliance if any part has been under water. Immediately call a qualifi ed
service technician to inspect appliance and to replace any part of control system and any gas control which has been under water.
OPERATING INSTRUCTIONS FOR INTERMITTENT PILOT SYSTEM
1.
STOP! Read the safety information to the left.
2.
Set the thermostat to lowest setting.
3.
Turn off all electric power to the appliance.
4.
This appliance is equipped with an ignition device which automatically lights the pilot. Do not try to light the pilot by hand.
Figure 16 - Intermittent Pilot
NOTICE
5.
6.
Before lighting any type of pilot burner (standing or intermittent), verify the hot water boiler and system are full of water to minimum pressure of 12 psi in the system, also verify system is vented of air. Set operating control of thermostat to “below” normal setting. Refer to following appropriate lighting instruction.
LIGHTING PROCEDURE FOR BOILER WITH INTERMITTENT PILOT SYSTEM
A. This appliance is equipped with an ignition device which
automatically lights the pilot. Do not try to light the appliance by hand.
!
CAUTION
WHAT TO DO IF YOU SMELL GAS
• Do not try to light any appliance.
• Do not touch any electrical switches; do not use any phone in your building.
• Immediately call your gas supplier from a
7.
8.
9.
10.
TO TURN OFF GAS TO THE APPLIANCE
1.
2.
3.
4.
neighbor’s phone. Follow the gas supplier’s instructions.
Turn gas control knob clockwise to “OFF.” Wait (5) minutes to clear out any gas. If you then smell
gas, STOP! Follow “What To Do If You Smell Gas” in the safety information to the left. If you don’t smell gas, go on to the next step.
Turn gas control knob counterclockwise to “ON.” Turn on all electric power to the appliance. Set thermostat to desired setting. If the appliance will not operate, follow the instructions
“
To Turn Off Gas To Appliance
service technician or your gas supplier.
Set the thermostat to lowest setting. Turn off all electric power to the appliance if service is
to be performed. Push in gas control knob slightly and turn clockwise
to "OFF." DO NOT FORCE.
Call qualifi ed service technician.
” , and call qualifi ed
• If you cannot reach your gas supplier, call the fi re department.
17
Page 18
12 - NORMAL SEQUENCE OF OPERATION
Thermostat actuates on call for heat, completing circuit to control. Completed circuit to control will fi rst activate circulator and damper which will close end switch inside damper. Completes circuit to ignition system, ignition takes place.
In event boiler water temperature exceeds high limit setting on boiler mounted high limit control, power is interrupted between control system and ignition system. Power remains off until boiler water temperature drops below high limit setting. Circulator continues to operate under this condition until thermostat is satisfi ed.
In event fl ow of combustion products through boiler venting system becomes blocked, blocked vent safety switch shuts main burner gas off. Similarly, if boiler fl ue-way becomes blocked, fl ame rollout safety switch shuts main burner
gas off. Figure 16. If either of these conditions occur, DO NOT ATTEMPT TO PLACE BOILER
BACK INTO OPERATION. CONTACT CERTIFIED SERVICE AGENCY.
Intergral Draft Hood
Burner
Door
Burners
Orifi ces
Figure 17 - Blocked Vent Safety Switch, Roll-out Safety Switch
Blocked Vent Safety Switch
Rollout Switch 4 Section Boiler
Base
Jacket Base Panel
Rollout Switch
2,3,5
Section Boiler
13 - GENERAL INSTRUCTIONS
Before seasonal start-up, have a certifi ed service agency check boiler for soot and scale in fl ues, clean burners and check gas input rate to maintain high operating effi ciency.
!
WARNING
This procedure should be followed to clean fl ue gas passageways:
1.
Label all wires prior to disconnection when servicing controls. Wiring errors could cause improper and dangerous operation.
Verify proper operation after servicing Service agency will verify system is fi lled with water to
minimum pressure and open air vents, if used, to expel any air accumulated in the system. Check entire piping system and, if any leaks appear, have them repaired.
Circulators need to be checked and maintained. Refer to circulator manufacturer's instructions.
Inspect venting system at the start of each heating season. Check vent pipe from boiler to chimney for signs of deterioration by rust or sagging joints. Repair if necessary. Remove vent pipe at base of chimney or fl ue and using a mirror, check vent for obstruction and verify vent is in good working order.
Boiler fl ue gas passageways may be inspected by a light and mirror. Remove burner door. lamp in fl ue collector through draft relief opening. With mirror positioned above burners, fl ue gas passageways can be checked for soot or scale.
Figure 17
. Place trouble
2.
3.
4.
5.
6.
When cleaning process is complete, restore boiler components to their original position. Use IS-808 GE silicone (available from distributor) to seal around fl ue collector and boiler castings.
Remove burners from combustion chamber by raising burners up from manifold orifi ces and pulling toward front of boiler.
Disconnect vent pipe from draft hood.
Remove top jacket panel.
Remove combination fl ue collector and draft hood from boiler castings by loosening nuts on hold down bolts located on each side of collector.
Place sheet of heavy paper or similar material over bottom of base and brush down fl ue passageways. Soot and scale will collect on paper and is easily removed with the paper.
With paper still in place in base, clean top of boiler castings of boiler putty or silicone used to seal between castings and fl ue collector. Verify chips are not lodged in fl ue passageways.
Figure 19
.
Figure 17
.
18
Page 19
13 - GENERAL INSTRUCTIONS
Figure 18 - Gas Burner Flame
Figure 19 - Combustion Chamber
BURNERS
ORIFICES
GAS VALVE
• Make visual inspection of main burner and pilot fl ames at start of heating season and again in mid-season. Main burner fl ame should have well defi ned inner blue mantel with lighter blue outer mantel. Check burner throats and burner orifi ces for lint or dust obstruction.
Figures 18
and 19.
• Pilot fl ame should envelop ⅜ to ½ inch of tip of ignition/ sensing electrode. See
Figure 20.
• To adjust pilot fl ame, remove pilot adjustment cover screw and turn inner adjustment screw counterclockwise
to increase or clockwise to decrease pilot fl ame. Be sure to replace cover screw after adjustment to prevent possible gas leakage. See Figure 16, Page 19.
• Check burners and pilot for signs of corrosion, rust or scale buildup.
• Area around boiler must be kept clear and free of combustible materials, gasoline and other fl ammable vapors and liquids.
• Free fl ow of combustion and ventilating air to boiler and boiler room must not be restricted or blocked.
• Inspect fi eld sourced low water cutoffs annually, or as recommended by low water cutoff manufacturer. Flush fl oat type low water cutoffs per manufacturer's instructions.
• Employ a qualifi ed service agency to make annual inspection of boiler and heating system. They are experienced in making the inspections outlined above, and, in event repairs or corrections are necessary, trained technicians make the proper changes for safe operation of the boiler.
Figure 20 - Gas Burner Pilot
19
Page 20
14 - CHECKING GAS INPUT RATE TO BOILER
• Adjust gas input to boiler by removing protective cap on pressure regulator increase input and counterclockwise
,
and turning screw clockwise to
to decrease
input.
• Manifold pressures are taken at outlet side of gas valve.
• To check for proper fl ow of natural gas to boiler, divide input rate shown on rating plate by heating value of gas obtained from local gas company. This determines number of cubic feet of gas required per hour.
• With all other gas appliances off, determine fl ow of gas through meter for two minutes and multiply by 30 to get hourly rate.
• Make minor adjustments to gas input as described above. See Figure 16 page 18.
• Change burner orifi ces if fi nal manifold pressure varies more than plus or minus 0.3 inches water column from specifi ed pressure listed on boiler rating plate.
• Primary air adjustment is not necessary, therefore air shutters are not furnished as standard equipment.
Figure 21 - High Limit Control Location
HIGH LIMIT
AND OPERATING
CONTROL
BURNER ACCESS
DOOR
GAS VALVE
CHECK SAFETY CONTROL CIRCUIT. Test ignition
system safety shutoff device after placing boiler in operation.
1.
Intermittent Pilot: With main burner operating, turn
Figure 15 page 19.
pilot gas adjusting screw clockwise until pilot gas is turned off. Within 90 seconds main gas control closes, shutting off gas to main burner.
2.
High Limit Control: Remove plastic cover and
note temperature setting. Refer to appendix A for adjustment procedure. Decrease setting to minimum and operate boiler. When boiler water temperature exceeds control temperature setting, control will open
circuit, closing automatic main gas valve. Figure 21.
20
Page 21
15 - CONTROL FUNCTION
1
HI TEMP illuminates when boiler water temperature
reaches high limit setting and remains lit until water temperature falls 10°. Prevents burner operation while this LED is on.
2
LWCO Active Indicates low water cut-off (LWCO)
function of limit control is active. When control is installed
with a well, LED is on at all times when control is powered.
Important: If control is installed with a well other than Electro-Well, LED will not illuminate indicating control is not providing low water cut-off functionality.
!
WARNING
Burn and scald hazard. Do not add water until boiler has fully cooled. Failure to follow these instructions could result in death or serious injury.
LWCO Low Water illuminates if boiler is in low water
3
condition. Limit control prevents burner operation during this condition.
Important: Have system checked by qualifi ed service agency prior to resuming operation.
ECONOMY Active Indicates thermal targeting function
4
is active and limit control is reducing boiler temperature to conserve fuel. Economy feature is activated using Economy dial.
ECONOMY TARGET Economy feature is active, limit
5
control continually sets target temperatures below high limit setting to maximize fuel effi ciency. When boiler water reaches target temperature, LED illuminates and burner shuts down. Boiler water will continue to circulate and heat the house as long as thermostat call continues. LED will stay lit until boiler temperature drops below differential set point at which point boiler will be allowed to fi re again.
Note: LED illuminates regularly during normal boiler operation.
6
LWCO TEST Button
To Test Low Water Cut-Off: Press and hold Test/Settings button for 5 seconds. Display will read LWCO.
LWCO TEST Red Low Water light will illuminate and burner circuit (B1
and B2) will de-energize. Note: Control must be installed with Electro-Well for low
water cut-off functionality.
LCO
21
Page 22
NOTES
Page 23
Date Service Performed Company Name & Tech Initials Company Address & Phone #
Page 24
COLUMBIA BOILER COMPANY
Main offi ces and factory
Pittstown, PA
Loading...