
High Bay
Rod mount kit | Kit de montage sur tige
Installation instructions I Consignes d’installation
M20
Securing Screw/
Vis de blocage
Fig 1. Fig 2. Fig 3.
en
Installation
Rod mount kits are designed to be mounted onto lighting trunking via a central M20 thread.
Do not use with Emergency high bay variants.
1. Remove hanging loop from the luminaire, by loosening the securing screw and then
disposing of the hanging loop component.
2. Taking the rod component, insert the M10 thread into the corresponding hole on the
luminaire and tighten. Fix into position by tightening the securing screw on the luminaire.
(Fig.1)
3. Mount the rod onto the M20 thread / mounting surface and fix into position by tightening
the securing screw on the rod component. (Fig.2).
Securing Screw/
Vis de blocage
fr
1.5m
Installation
Le kit de montage sur tige est conçu pour être monté sur une goulotte d’éclairage via un
filetage central M20. Ne pas utiliser avec les variantes de sécurité.
1. Retirez la boucle de suspension du luminaire en desserrant la vis de blocage. La boucle
de suspension peut être jetée.
2. Prenez la tige, insérez le filetage M10 dans le trou correspondant du luminaire et serrez.
Fixez en position en serrant la vis de blocage sur le luminaire. (fig.1)
3. Montez la tige sur le filetage M20 / la surface de montage et fixez en position en serrant
la vis de blocage sur la tige. (fig.2).
5 year warranty
5 ans de garantie
en
t +44 (0) 1604 495 151 I f +44 (0) 1604 495 095 I e sales@collingwoodgroup.com I w collingwoodlighting.com
Collingwood Lighting, Brooklands House, Sywell Aerodrome, Sywell, Northampton NN6 0BT, United Kingdom
fr
t +33 (0) 4 816 816 10 I f +33 (0) 4 816 816 11 I e ventes@collingwoodgroup.com I w collingwoodlighting.com
Collingwood Lighting, 43-47 Avenue de la Grande Armée, 75116, Paris, France
V1