Coef PERFORMANCE 250DV User Manual

Http://www.coef.it E-mail:info@coef.it
&VIDEO
C CAD
dbyP
Realize
3
1.0 INSTALLATION
The constructor is not be considered responsible in case of:
Improper use of the unit or use by not trained staff
Use in contrast with the directions on work safety
Wrong installation
Defective power supply
Serious lacks in the necessary maintenance
Unauthorized modifications and interventions
Use of spare parts that are not original or not specific for the unit
Total or partial inobservance of instructions
Unusual events
2.0 LAMP MOUNTING AND REPLACING
The units mounts high pressure lamp with external traditional striker.
The lamp must be changed if damaged or deformed by heat.
WARNING: switch off the projector before operating.
Read carefully the lamp builder’s instructions.
Wait at least 10 minutes after the projector has been switched off before operating again, in order to let it cool down and avoid the lamp explosion.
Wait 20 minutes in case you are operating with the bare hands in order to avoid burns.
Screw the two screws off (part.
A) and remove the round cover that’s supporting the lampholder.
Insert the lamp in the socket. Insert delicately the lamp in the projector support, driving it with the round cover.
Pay attention: the lampholder’s wires must correctly reenter in the projector. Block the cover screwing the screws
up ( part. A).
2.1 MIRROR MOUNTING OR REPLACEMENT
Remove the elastic band
that’s blocking the motor of scansion group. For the mirror replacement (C), screw the two screws (B) and remove the broken mirror. Install the new spare part (its support is already mounted by the factory) on the motor A, carefully closing, using an hexagonal screwdriver.
WARNING! The mirror is very delicate, so you must handle it with great care.
ZL-012701-01 ZL-012601-01
=Default value-factory assigned
Loading...
+ 22 hidden pages