CMP Huron Installation Instructions Manual

Huron (LDAL Cable Cleat)Huron
(LDAL Cable Cleat)
Features
Third party certification to IEC 61914:2009
5000 series aluminium
19 - 128mm in 23 sizes for trefoil formation /
application
Low Smoke & Fume (LSF) liners as standard
One or Two M10 fixing design
www.cmp-products.com
Cleat Installation Instructions
FI530 REV 0
CMP Cleat Installation Instructions
1. Place the cable cleat in desired
location on mounting surface and unhinge the cable cleat.
2. Insert base booster if required.
4. Tighten down to specified
torque rating of 8Nm (2 bolt option pictured).
6. Using supplied mouthpiece
fittings, tighten down to no more than 8Nm with 19mm nut spanner.
3. Secure cleat to the mounting surface
using 1x M10 bolt (3a) or 2 x M10 bolts (3b), adding a washing and nut on both sides.
5. Place the cable into the cleat
and pull the hinged arm over the cables.
Nut Spacer
Note: Cleat marking can be found on hinged arm
Booster
(3a)
(3b)
Loading...