1
GENERAL
Installation of the unit must be accomplished by
qualified electrical installation personnel working
to all applicable local and national codes.
Improper installation of product could cause injury
or damage.
This equipment is built to comply with applicable
standards for manufacturers. Included among
those approval agencies are: UL, NSF, ASME/Ntl.
Bd., CSA, CGA, ETL, and others. Many local
codes exist, and it is the responsibility of the
owner/installer to comply with these codes.
Note: Maximum voltage for LVD (low volt directive for Europe) to be 440 volts for CE marked
appliances.
INSPECTION / UNPACKING
Note: The electrical rating label is located on the
right console. Serial number, voltage, phase,
amperage and wattage are stated on this label.
1. Before unpacking visually inspect the unit for
evidence of damage during shipping.
2. If damage is noticed, do not unpack the unit,
follow "SHIPPING DAMAGE INSTRUCTIONS"
shown below.
3. Carefully remove unit from shipping carton.
Remove any packing material from unit. After
carefully unpacking check for "concealed"
damage. If damage is noticed, follow
"SHIPPING DAMAGE INSTRUCTIONS" shown
below.
4. Check the electrical rating label to ensure that
the unit is the correct voltage, phase, amperage and wattage are stated on this label.
5. A protective material has been applied to the
stainless steel panels. This material must be
removed immediately after installation, as heat
will melt the material and make it more difficult
to remove.
SHIPPING DAMAGE
INSTRUCTIONS
If shipping damage to the unit is discovered or
suspected, observe the following guidelines in
preparing a shipping damage claim.
1. Write down a description of the damage or the
reason for suspecting damage as soon as it is
discovered. This will help in filling out the claim
forms later.
2. As soon as damage is discovered or suspected,
notify the carrier that delivered the shipment.
3. Arrange for the carrier's representative to
examine the damage.
4. Fill out all carrier claims forms and have the
examining carrier sign and date each form.
INSTALLATION
Note: For clearance requirements, suggested
drain location and assembly details refer to
"SPECIFICATION DRAWING" on page #3.
1. Position the unit in it's permanent location, and
level the unit by turning the adjustable feet.
2. Once positioned
and leveled, permanently secure
the unit's rear
flanged feet to
the floor using
5/16" lag bolts
and floor
anchors (supplied by the installer). Three bolts are required
to secure each of the flanged feet.
3. Seal joints of flanged feet with a silicone
sealant.
INSTALLATION