Cleveland SEL-30-TR Service Manual

Statement of Responsibilities
This document is for use by experienced and trained Qualified Cleveland Range, LLC Authorized Service Representatives who are familiar with both the safety procedures, and equipment they service.
Cleveland Range, LLC assumes no liability for any death, injury, equipment damage, or property damage resulting from use of, improper use of, or failure to use the information contained in this document.
Cleveland Range, LLC has made every effort to provide accurate information in this document, but cannot guarantee that this document does not contain unintentional errors and omissions.
The information in this document may be subject to technical and technological changes, revisions, or updates.
Cleveland Range, LLC assumes no liability or responsibility regarding errata, changes, revisions, or updates.
Qualified Cleveland Range, LLC Authorized Service Representatives are obligated to follow industry standard safety procedures, including, but not limited to, OSHA regulations, and disconnect / lock out / tag out procedures for all utilities including steam, and disconnect / lock out / tag out procedures for gas, electric, and steam powered equipment and / or appliances
All utilities (gas, electric, water and steam) should be turned OFF to the equipment and locked out of operation according to OSHA approved practices during any servicing of Cleveland Ran ge equipment
Qualified Cleveland Range, LLC Authorized Service Representatives are obligated to maintain up-to-date knowledge, skills, materials and equipment.
Cleveland Range, LLC
1333 East 179th St., Cleveland, Ohio, U.S.A. 44110
Ph: 1-216-481-4900 Fx: 1-216-481-3782 Visit our Web Site at www.clevelandrange.com
CLEVELAND RANGE SEL-R
SEQUENCE OF OPERATIONS
When using these instructions refer to the SEL-R wiring schematic.
1. Supply Voltage is sent to the normally open contacts of the element contactor
2. Supply Voltage is sent through the 1.5 amp fuse to the power switch
3. With the power switch in the on position, supply voltage is sent to the primary of the
main transformer.
4. 120 VAC is sent from pins 1 and 2 on the secondary of the main transformer through
the 1 amp fuse to the tilt interrupter switch.
If the skillet is in the down position 115 VAC is sent from the interrupter switch
through the high limit to pin 9 on the thermostat.
5. When the thermostat is calling for heat 115 VAC is sent to the coil of the element
contactor.
The normally open contacts of the element contactor close sending supply voltage
to the elements.
The elements will heat the skillet until the thermostat is satisfied.
6. When the thermostat is satisfied 115VAC is removed from pin 10 and the heat circuit
is de-energized.
7. If the skillet is equipped with the optional Power Tilt, 24 VAC is sent from terminals
3 and 4 of the secondary of the main transformer through the 15-amp fuse to the bridge rectifier
8. The AC current is rectified to DC voltage that is then filtered by the capacitor and
resistor and sent to the tilt switch.
9. When the switch is in the up position the DC motor is energized and the actuator
extends.
10. When the switch is in the down position the polarity is reversed and the motor is
energized to retract the actuator.
Loading...
+ 5 hidden pages