GENERAL
Installation of the unit must be accomplished by
qualified installation personnel working to all
applicable local and national codes. Improper
installation of product could cause injury or damage.
This unit is built to comply with applicable
standards for manufacturers. Included among
those approval agencies are: UL, NSF,
ASME/Ntl.Bd., CSA, ETL, CE, and others. Many
local codes exist, and it is the responsibility of the
owner/installer to comply with these codes.
INSPECTION
Before uncrating, visually inspect the unit for
evidence of damage during shipping. If damage
is noticed, do not unpack the unit, follow shipping
damage instructions.
SHIPPING DAMAGE
INSTRUCTIONS
If shipping damage to the unit is discovered or
suspected, observe the following guidelines in
preparing a shipping damage claim.
1. Write down a description of the damage or the
reason for suspecting damage as soon as it is
discovered. This will help in filling out the claim
forms later. If possible, take a polaroid picture.
2. As soon as damage is discovered or suspected,
notify the carrier that delivered the shipment.
3. Arrange for the carrier's representative to
examine the damage.
4. Fill out all carrier claims forms and have the
examining carrier sign and date each form.
INSTALLATION
The first installation step is to refer to the
SPECIFICATION SHEET or SPECIFICATION
DRAWING to determine the exact location of the
kettle.
CLEARANCE REQUIREMENTS TO
COMBUSTIBLE AND NONCOMBUSTIBLE
SURFACES:
RIGHT LEFT BACK
MKDT-12-T 0" 0" see below
MKDT-20-T 0" 0" see below
Clearance Requirements & Pour Path Drawing