Cleveland MKDT-20-T Installation Manual

MODELS:
MKDT-12-T, MKDT-20-T
SE95016 Rev. 4
Direct Steam Table Top Mixers
MKDT-12-T
MKDT-20-T
1333 East 179th St., Cleveland, Ohio, U.S.A. 44110
d
Enodis
For a complete Service Manual refer to www.clevelandrange.com
Operators Manual
Installation & Operation
Clev elan
For your safety
DANGER
Keep clear of pressure relief discharge.
IMPORTANT
Inspect unit daily for proper operation.
CAUTION
Surfaces may be extremely hot! Use protective equipment.
Keep hands away from moving parts and pinch points.
Do not fill kettle above recommended level marked on outside of kettle.
Wear protective equipment when discharging hot product.
Do not lean on or place objects on kettle lip.
SERVICING
Shut off power at main fuse disconnect prior to servicing.
GAS APPLIANCES
Do not attempt to operate this appliance during a power failure.
Stand clear of product discharge path when discharging hot product.
Ensure kettle is at room
0
temperature and pressure gauge is showing zero or less prior to removing any fittings.
Keep appliance and area free and clear of combustibles.
GENERAL
Installation of the unit must be accomplished by qualified installation personnel working to all applicable local and national codes. Improper installation of product could cause injury or damage.
This unit is built to comply with applicable standards for manufacturers. Included among those approval agencies are: UL, NSF, ASME/Ntl.Bd., CSA, ETL, CE, and others. Many local codes exist, and it is the responsibility of the owner/installer to comply with these codes.
INSPECTION
Before uncrating, visually inspect the unit for evidence of damage during shipping. If damage is noticed, do not unpack the unit, follow shipping damage instructions.
SHIPPING DAMAGE INSTRUCTIONS
If shipping damage to the unit is discovered or suspected, observe the following guidelines in preparing a shipping damage claim.
1. Write down a description of the damage or the reason for suspecting damage as soon as it is discovered. This will help in filling out the claim forms later. If possible, take a polaroid picture.
2. As soon as damage is discovered or suspected, notify the carrier that delivered the shipment.
3. Arrange for the carrier's representative to examine the damage.
4. Fill out all carrier claims forms and have the examining carrier sign and date each form.
INSTALLATION
The first installation step is to refer to the SPECIFICATION SHEET or SPECIFICATION DRAWING to determine the exact location of the kettle.
CLEARANCE REQUIREMENTS TO COMBUSTIBLE AND NONCOMBUSTIBLE SURFACES:
RIGHT LEFT BACK
MKDT-12-T 0" 0" see below
MKDT-20-T 0" 0" see below
Clearance Requirements & Pour Path Drawing
16.34
416mm
8.69
221mm
19.00
483mm
12.63
321mm
19.75
502mm
10.00
221mm
22.75
578mm
19.50
495mm
INSTALLATION
Loading...
+ 7 hidden pages