DANGER
Keep clear of pressure relief discharge.
IMPORTANT
Inspect unit daily for proper operation.
CAUTION
Surfaces may be extremely hot! Use protective equipment.
Keep hands away from moving parts and pinch points.
Do not fill kettle above recommended level marked on outside of kettle.
Wear protective equipment when discharging hot product.
Do not lean on or place objects on kettle lip.
SERVICING
Shut off power at main fuse disconnect prior to servicing.
GAS APPLIANCES
Do not attempt to operate this appliance during a power failure.
Stand clear of product discharge path when discharging hot product.
Ensure kettle is at room
0
temperature and pressure gauge is showing zero or less prior to removing any fittings.
Keep appliance and area free and clear of combustibles.
GENERAL
Installation of the unit must be accomplished by qualified installation personnel working to all applicable local and national codes. Improper installation of product could cause injury or damage.
This unit is built to comply with applicable standards for manufacturers. Included among those approval agencies are: UL, NSF, ASME/Ntl.Bd., CSA, ETL, CE, and others. Many local codes exist, and it is the responsibility of the owner/installer to comply with these codes.
INSPECTION
Before uncrating, visually inspect the unit for evidence of damage during shipping. If damage is noticed, do not unpack the unit, follow shipping damage instructions.
SHIPPING DAMAGE INSTRUCTIONS
If shipping damage to the unit is discovered or suspected, observe the following guidelines in preparing a shipping damage claim.
1. Write down a description of the damage or the reason for suspecting damage as soon as it is discovered. This will help in filling out the claim forms later. If possible, take a polaroid picture.
2. As soon as damage is discovered or suspected, notify the carrier that delivered the shipment.
3. Arrange for the carrier's representative to examine the damage.
4. Fill out all carrier claims forms and have the examining carrier sign and date each form.
INSTALLATION
The first installation step is to refer to the SPECIFICATION SHEET or SPECIFICATION DRAWING to determine the exact location of the kettle.
CLEARANCE REQUIREMENTS TO COMBUSTIBLE AND NONCOMBUSTIBLE SURFACES:
RIGHT LEFT BACK
MKDT-12-T 0" 0" see below
MKDT-20-T 0" 0" see below
Clearance Requirements & Pour Path Drawing
16.34
416mm
8.69
221mm
19.00
483mm
12.63
321mm
19.75
502mm
10.00
221mm
22.75
578mm
19.50
495mm
INSTALLATION
ASSEMBLY
12 Gallon Models
Base Mounting Diagram - Bottom view
1. Table-top models (12 gallon) must be positioned on a firm, level stand, or existing counter top, and bolted in place. These models are supplied with four threaded mounting bushings welded to the underside of the base.
2. Install service requirements as required (see below).
3. Once the kettle is secure and service utilities installed, screw tilt handle into the threaded hole provided at the right side of kettle.
20 Gallon Models
Base Mounting Diagram - Bottom views showing leg locations & utilities
1. Position on a firm, level surface, and bolt the four flange feet in place.
2. Install service requirements as required (see below).
3. Once the kettle is secure and service utilities installed, screw tilt handle into the threaded hole provided at the right side of kettle.
RECOMMENDED PIPING SCHEMATICS
(all service connections shown supplied by others)
Recommended Piping Schematic
STEAM
All steam plumbing to and from the kettle and steam boiler should be thoroughly cleaned and inspected for dirt and debris before final connection to the kettle are made.
Generally, kettles require 1/2" i.p.s. pipe, 10-45 psi steam pressure. If the steam supply pressure exceeds 45 psi, a pressure reducing valve is required. The steam inlet is at the right side of the kettle, as seen from the front.
CONDENSATE
Maximum pressure rating on kettles is 50 psi. It is highly recommended that a pressure relief valve equal to or less than this pressure be installed on the incoming steam line close to the kettle.
A steam condensate trap must be plumbed to a drain, using minimum 1/2" NPT plumbing. The condensate line is limited to a maximum rise of 10 feet in order for the steam pressure to adequately force the condensate through the plumbing. Any higher rise requires a pump.
If the steam boiler to which this kettle is installed has a condensate return (closed loop system), a 1/2" steam strainer, a 1/2" steam trap, and a 1/2" check valve must be installed on the output (condensate) side of the kettle.
PRESSURE REDUCING
VALVE
STRAINER
STEAM
TRAP
CHECK
VALVE
STRAINER
UNION
BALL
VALVE
MANUAL STEAM VALVE
CONDENSATE
RETURN
STEAM
IN
UNION
TO DRAIN OR BOILER CONDENSATE LINE
0.95" 24mm
27.10"
688mm
0.95"
24mm
20.85"
528mm
29.00"
737mm
2.63" 67mm
22.75" 578mm
23.75"
603mm
2.63"
67mm
29.00"
737mm
CONDENSATE RETURN
STEAM
IN
FLANGED FEET
14.50"
368mm
2.25" 57mm
2.19" 56mm
19.00"
483mm
19.50"
495mm
10"
254mm
1.25"
32mm
1.63"
41mm
23.88"
606mm
5/16" - 18 THREADED BUSHINGS
CONDENSATE RETURN
STEAM
IN
ELECTRICAL
ENSURE THE ELECTRICAL SUPPLY MATCHES THE KETTLE'S REQUIREMENTS AS STATED ON THE RATING LABEL.
This kettle is built to comply with applicable standards of manufacturers. Included among these approval agencies are UL, NSF, ASME/Ntl. Bd., CSA, ETL, and others. Many local codes exist, and it is the responsibility of the owner and installer to comply with these codes.
The electrical supply must match the power requirements specified on the kettle’s rating plate. The copper wiring must be adequate to carry the required current at the rated voltage. Refer to the Specification Sheet for all electrical specifications.
Note: Maximum voltage for LVD (low volt directive for Europe) to be 440 volts for CE marked appliances.
POTABLE WATER
The water faucet (optional) with swing spout, requires 1/2 inch O.D. copper tube plumbing for hot or cold water supplies to the faucet (SPK ­cold water connection only, DPK - hot and cold water connection).
INSTALLATION CHECKS
Although the kettle has been thoroughly tested before leaving the factory, the installer is responsible for ensuring the proper operation of kettle once installed.
Final Installation Check
1. Partially fill the kettle with water.
2. Slowly turn the steam control valve's knob to
the open position.
3. Release the safety valve, ensuring that the steam escapes freely. Stay clear of steam exhaust when releasing the safety valve.
4. Observe that the water in the kettle comes to a boil.
5. Close the steam supply valve.
6. Drain off the water by tilting the kettle.
CLEANING
After installation the kettle must be thoroughly cleaned and sanitized prior to cooking. See complete cleaning instructions in this manual.
OPERATING INSTRUCTIONS
ITEM # DESCRIPTION FUNCTION
1. On-Off Toggle Switch Controls electrical power to unit.
2. Mixer Start Switch Starts mixing action.
3. Agitator Speed Control Knob This control allows the operator to select agitator speed increments
from Min. to Max.
4. Kettle Tilt Handle Used for tilting the kettle.
5. Mixer Bridge Encloses agitator motors.
6. Mixer Bridge Tilt Handle Used for tilting mixer bridge.
7. Main Agitator Arm Provides most of the product movement.
8. Secondary Agitator Arm Provides reverse agitation and product lift in kettle.
9. Bayonet Mounts for Agitator Arms Allows removal of main and secondary agitator arms without tools.
10. Marine Lock Prevents unit from accidental tilting.
11. Steam Control Valve Manually controls the amount of steam entering the steam jacket.