
®
BE SURE HOLES
IN 90° ELBOWS ARE
LOCATED ON TOP
DURING ASSEMBLY
1" X 39" SCH 40
PVC PIPE
(4 REQ'D)
®
3649 Cane Run Road . Louisville, KY 40211-1961
877-244-9340 . Fax: 877-414-4316
www.clarusenvironmental.com
Centrifugal STEP Vault Stand
INSTALLATION INSTRUCTIONS
S.S. SCREWS
(4 REQ'D)
SECTION: C1.60.125
CL0135
Supersedes
EXISITING PIPE HANGER
(CUT TO 11” WHEN USED
WITH THE VAULT STAND)
0512
New
1" 4 WAY TEE
(4 REQ'D)
1" X 11" SCH 40
PVC PIPE
(4 REQ'D)
LEG EXTENSIONS
ADDED BY THE
INSTALLER
ASSEMBLY VIEW
Detail 1
CAST IN
RISER
5040 STEP
VAULT AND
PUMP
5040 CENTRIFUGAL
STEP STAND
Field Assembly of Stand:
Remove existing pipe hangers and cut to
11", then reinstall. Follow the assembly
layout in Detail 1 for completion.
CAST IN RISER APPLICATION
POST SEPTIC TANK APPLICATION
SK2897
Detail 2
Assembling Leg Extensions:
Determine the length needed of 1" SCH 40 PVC pipe for the leg
extensions and glue the appropriate length pipe into the bottom of
the 4-way tee. Install unit as per typical installation. See Detail 2.
Product information presented here reflects conditions at time of publication. Consult factory regarding discrepancies or inconsistencies.
© Copyright 2012. All rights reserved.