The UCS B200 blade server (shown in Figure 1) is now only available in the M2 version (the M1 version
is no longer sold as of 1/21/2011). The procedures in this document apply to both versions. The Cisco
UCS B200 is a half-width blade with 12 DIMM slots; it supports one adapter. You may install up to eight
UCS B200 Blade Servers to a UCS chassis.
Figure 1Cisco UCS B200 Front Panel
1Asset tab
2Blade ejector handle8Blade health LED
3Ejector captive screw9Console connector
4Hard drive bay 110 Reset button access
5Hard drive bay 211 Beaconing LED and button
6Power button and LED
1. Each server has a blank plastic tag that pulls out of the front panel, provided so you can add your
own asset tracking label without interfering with the intended air flow.
Americas Headquarters:
Cisco Systems, Inc., 170 West Tasman Drive, San Jose, CA 95134-1706 USA
1
7Network link status LED
Page 2
Send document comments to ucs-docfeedback@cisco.com
LEDs
The LED indicators indicate whether the blade server is in active or standby mode, the status of the
network link, the over all health of the blade server, and whether the server is set to give a flashing blue
beaconing indication. See Ta bl e 1 for details.
The removable hard disks also have LEDs indicating hard disk access activity and hard disk health.
Table 1Blade Server LEDs
LEDColor Description
Power
Link
Health
Beaconing
Activity
(Disk Drive)
Health
(Disk Drive)
1. This reading may not be reliable if the drive is part of a damaged RAID array, or if the BIOS fails to complete POST.
OffPower off.
GreenNormal operation.
AmberStandby.
OffNone of the network links are up.
GreenAt least one network link is up.
OffPower off.
GreenNormal operation.
AmberMinor error.
Blinking
Critical error.
Amber
OffBeaconing not enabled.
Blinking
blue 1 Hz
Beaconing to locate a selected blade—If the LED is not
blinking, the blade is not selected. You can initiate
beaconing in UCS Manager or with the button.
OffInactive.
GreenOutstanding I/O to disk drive.
OffNo fault.
AmberSome fault.
1
Buttons
The Reset button is just inside the chassis and must be pressed using the tip of a paper clip or a similar
item. Hold the button down for five seconds and then release it to restart the server if other methods of
restarting are not working.
The beaconing function for an individual server may get turned on or off by pressing the combination
button and LED. See Tab le 1 for details.
The power button and LED allows you to manually take a server temporarily out of service but leave it
in a state where it can be restarted quickly. If the desired power state for a service profile associated with
a blade server or an integrated rack-mount server is set to "off", using the power button or Cisco UCS
Manager to reset the server will cause the desired power state of the server to become out of sync with
the actual power state and the server may unexpected shutdown at a later time. To safely reboot a server
from a power-down state, use the Boot Server action in Cisco UCS Manager.
Cisco UCS B200 Blade Server Installation and Service Note
2
OL-22473-02
Page 3
Send document comments to ucs-docfeedback@cisco.com
Connectors
A console port is provided to give a direct connection to a blade server to allow operating system
installation and other management tasks to be done directly rather than remotely. The port uses the KVM
dongle device included in the chassis accessory kit.
The KVM cable (N20-BKVM shown in Figure 2) provides a connection into a Cisco UCS blade server,
providing a DB9 serial connector, a VGA connector for a monitor, and dual USB ports for a keyboard
and mouse. With this cable you can create a direct connection to the operating system and the BIOS
running on a blade server.
Figure 2KVM Cable for Blade Servers
2
1
3
4
Conventions
This document uses the following conventions for notes, cautions, and safety warnings.
Notes and Cautions contain important information that you should know.
NoteMeans reader take note. Notes contain helpful suggestions or references to material that are not covered
in the publication.
CautionMeans reader be careful. You are capable of doing something that might result in equipment damage or
loss of data.
Safety warnings appear throughout this publication in procedures that, if performed incorrectly, can
cause physical injuries. A warning symbol precedes each warning statement.
192621
1Connector to blade server slot2DB9 serial connector
3VGA connection for a monitor42-port USB connector for a mouse and keyboard
OL-22473-02
Cisco UCS B200 Blade Server Installation and Service Note
3
Page 4
Send document comments to ucs-docfeedback@cisco.com
Warning
Waarschuwing
Varoitus
IMPORTANT SAFETY INSTRUCTIONS
This warning symbol means danger. You are in a situation that could cause bodily injury. Before you
work on any equipment, be aware of the hazards involved with electrical circuitry and be familiar
with standard practices for preventing accidents. Use the statement number provided at the end of
each warning to locate its translation in the translated safety warnings that accompanied this
device.
Statement 1071
SAVE THESE INSTRUCTIONS
BELANGRIJKE VEILIGHEIDSINSTRUCTIES
Dit waarschuwingssymbool betekent gevaar. U verkeert in een situatie die lichamelijk letsel kan
veroorzaken. Voordat u aan enige apparatuur gaat werken, dient u zich bewust te zijn van de bij
elektrische schakelingen betrokken risico's en dient u op de hoogte te zijn van de standaard
praktijken om ongelukken te voorkomen. Gebruik het nummer van de verklaring onderaan de
waarschuwing als u een vertaling van de waarschuwing die bij het apparaat wordt geleverd, wilt
raadplegen.
BEWAAR DEZE INSTRUCTIES
TÄRKEITÄ TURVALLISUUSOHJEITA
Tämä varoitusmerkki merkitsee vaaraa. Tilanne voi aiheuttaa ruumiillisia vammoja. Ennen kuin
käsittelet laitteistoa, huomioi sähköpiirien käsittelemiseen liittyvät riskit ja tutustu
onnettomuuksien yleisiin ehkäisytapoihin. Turvallisuusvaroitusten käännökset löytyvät laitteen
mukana toimitettujen käännettyjen turvallisuusvaroitusten joukosta varoitusten lopussa näkyvien
lausuntonumeroiden avulla.
Attention
Warnung
SÄILYTÄ NÄMÄ OHJEET
IMPORTANTES INFORMATIONS DE SÉCURITÉ
Ce symbole d'avertissement indique un danger. Vous vous trouvez dans une situation pouvant
entraîner des blessures ou des dommages corporels. Avant de travailler sur un équipement, soyez
conscient des dangers liés aux circuits électriques et familiarisez-vous avec les procédures
couramment utilisées pour éviter les accidents. Pour prendre connaissance des traductions des
avertissements figurant dans les consignes de sécurité traduites qui accompagnent cet appareil,
référez-vous au numéro de l'instruction situé à la fin de chaque avertissement.
CONSERVEZ CES INFORMATIONS
WICHTIGE SICHERHEITSHINWEISE
Dieses Warnsymbol bedeutet Gefahr. Sie befinden sich in einer Situation, die zu Verletzungen führen
kann. Machen Sie sich vor der Arbeit mit Geräten mit den Gefahren elektrischer Schaltungen und
den üblichen Verfahren zur Vorbeugung vor Unfällen vertraut. Suchen Sie mit der am Ende jeder
Warnung angegebenen Anweisungsnummer nach der jeweiligen Übersetzung in den übersetzten
Sicherheitshinweisen, die zusammen mit diesem Gerät ausgeliefert wurden.
BEWAHREN SIE DIESE HINWEISE GUT AUF.
Cisco UCS B200 Blade Server Installation and Service Note
4
OL-22473-02
Page 5
Send document comments to ucs-docfeedback@cisco.com
Avvertenza
Advarsel
Aviso
IMPORTANTI ISTRUZIONI SULLA SICUREZZA
Questo simbolo di avvertenza indica un pericolo. La situazione potrebbe causare infortuni alle
persone. Prima di intervenire su qualsiasi apparecchiatura, occorre essere al corrente dei pericoli
relativi ai circuiti elettrici e conoscere le procedure standard per la prevenzione di incidenti.
Utilizzare il numero di istruzione presente alla fine di ciascuna avvertenza per individuare le
traduzioni delle avvertenze riportate in questo documento.
CONSERVARE QUESTE ISTRUZIONI
VIKTIGE SIKKERHETSINSTRUKSJONER
Dette advarselssymbolet betyr fare. Du er i en situasjon som kan føre til skade på person. Før du
begynner å arbeide med noe av utstyret, må du være oppmerksom på farene forbundet med
elektriske kretser, og kjenne til standardprosedyrer for å forhindre ulykker. Bruk nummeret i slutten
av hver advarsel for å finne oversettelsen i de oversatte sikkerhetsadvarslene som fulgte med denne
enheten.
TA VARE PÅ DISSE INSTRUKSJONENE
INSTRUÇÕES IMPORTANTES DE SEGURANÇA
Este símbolo de aviso significa perigo. Você está em uma situação que poderá ser causadora de
lesões corporais. Antes de iniciar a utilização de qualquer equipamento, tenha conhecimento dos
perigos envolvidos no manuseio de circuitos elétricos e familiarize-se com as práticas habituais de
prevenção de acidentes. Utilize o número da instrução fornecido ao final de cada aviso para
localizar sua tradução nos avisos de segurança traduzidos que acompanham este dispositivo.
¡Advertencia!
Varning!
GUARDE ESTAS INSTRUÇÕES
INSTRUCCIONES IMPORTANTES DE SEGURIDAD
Este símbolo de aviso indica peligro. Existe riesgo para su integridad física. Antes de manipular
cualquier equipo, considere los riesgos de la corriente eléctrica y familiarícese con los
procedimientos estándar de prevención de accidentes. Al final de cada advertencia encontrará el
número que le ayudará a encontrar el texto traducido en el apartado de traducciones que acompaña
a este dispositivo.
GUARDE ESTAS INSTRUCCIONES
VIKTIGA SÄKERHETSANVISNINGAR
Denna varningssignal signalerar fara. Du befinner dig i en situation som kan leda till personskada.
Innan du utför arbete på någon utrustning måste du vara medveten om farorna med elkretsar och
känna till vanliga förfaranden för att förebygga olyckor. Använd det nummer som finns i slutet av
varje varning för att hitta dess översättning i de översatta säkerhetsvarningar som medföljer denna
anordning.
SPARA DESSA ANVISNINGAR
OL-22473-02
Cisco UCS B200 Blade Server Installation and Service Note
5
Page 6
Send document comments to ucs-docfeedback@cisco.com
Cisco UCS B200 Blade Server Installation and Service Note
6
OL-22473-02
Page 7
Send document comments to ucs-docfeedback@cisco.com
Aviso
Advarsel
INSTRUÇÕES IMPORTANTES DE SEGURANÇA
Este símbolo de aviso significa perigo. Você se encontra em uma situação em que há risco de lesões
corporais. Antes de trabalhar com qualquer equipamento, esteja ciente dos riscos que envolvem os
circuitos elétricos e familiarize-se com as práticas padrão de prevenção de acidentes. Use o
número da declaração fornecido ao final de cada aviso para localizar sua tradução nos avisos de
segurança traduzidos que acompanham o dispositivo.
GUARDE ESTAS INSTRUÇÕES
VIGTIGE SIKKERHEDSANVISNINGER
Dette advarselssymbol betyder fare. Du befinder dig i en situation med risiko for
legemesbeskadigelse. Før du begynder arbejde på udstyr, skal du være opmærksom på de
involverede risici, der er ved elektriske kredsløb, og du skal sætte dig ind i standardprocedurer til
undgåelse af ulykker. Brug erklæringsnummeret efter hver advarsel for at finde oversættelsen i de
oversatte advarsler, der fulgte med denne enhed.
GEM DISSE ANVISNINGER
OL-22473-02
Cisco UCS B200 Blade Server Installation and Service Note
7
Page 8
Send document comments to ucs-docfeedback@cisco.com
Cisco UCS B200 Blade Server Installation and Service Note
8
OL-22473-02
Page 9
Installing and Removing a Blade Server Hard Drive
Send document comments to ucs-docfeedback@cisco.com
Installing and Removing a Blade Server Hard Drive
There are up to 2 front-accessible, hot-swappable, 2.5-inch drives per blade. An LSI 1064E RAID
controller is embedded in the motherboard (it is not separately replaceable) and it supports RAID 0 and
1. You can remove blade server hard drives without removing the blade server from the chassis. All other
component replacement for a blade server requires removing the blade from the chassis. Unused hard
drive bays should always be covered with cover plates (N20-BBLKD) to assure proper cooling and
ventilation. The chassis is omitted from illustrations here to simplify the drawing.
CautionTo prevent ESD damage, wear grounding wrist straps during these procedures and handle modules by
the carrier edges only.
NoteSeagate SATA disks and Intel or Samsung SATA SSDs are not supported in UCS Manager release 1.2(1)
and can not be used with servers using UCS Manager release 1.2(1).
CautionRAID array migration between a B200 M1 or B200 M2 and a B200 M3 is not supported
Replacing an HDD or SSD with a drive of the same size, model, and manufacturer generally causes few
problems with UCS Manager. If the drive being replaced was part of a RAID array we recommend using
a newly ordered drive of identical size, model, and manufacturer to replace the failed drive. Cisco
recommends following industry standard practice of using drives of the same capacity when creating
RAID volumes. If drives of different capacities are used, the useable portion of the smallest drive will
be used on all drives that make up the RAID volume. Before upgrading or adding an HDD to a running
system, check the service profile in UCS Manager and make sure the new hardware configuration will
be within the parameters allowed by the service profile.
Hard disk and RAID troubleshooting information is in the "Troubleshooting Server Hardware" chapter
of the Cisco UCS Troubleshooting Guide.
OL-22473-02
Cisco UCS B200 Blade Server Installation and Service Note
9
Page 10
Installing and Removing a Blade Server Hard Drive
Send document comments to ucs-docfeedback@cisco.com
Table 2 shows the drives supported in this blade server.
Table 2Supported Hard Disk Drives (HDD)
Product IDDescription
HDD
A03-D073GC2
A03-D146GA2
A03-D146GC2 146 GB 6Gb SAS transfer rate
A03-D300GA2300 GB, 6Gb SAS transfer rate
A03-D600GA2600 GB, 6Gb SAS transfer rate
A03-D1TBSATA1TB 6Gb SATA 7.2K RPM SFF HDD/hot plug/drive sled mounted
A03-D500GC3500GB 6Gb SATA 7.2K RPM SFF hot plug/drive sled mounted
UCS-HDD300GI2F105300GB 6Gb SAS 15K RPM SFF HDD/hot plug/drive sled mounted
UCS-HDD900GI2F106900GB 6Gb SAS 10K RPM SFF HDD/hot plug/drive sled mounted
SSD
UCS-SSD100GI1F104100GB SATA SSD SFF
A03-D100SSD100 GB SATA SSD HDD/hot plug/drive sled mounted3
1. This part reached end of sale on 12/12/2011.
2. The built-in 1064E RAID controller runs at 1.5Gb Link Speed instead of 3Gb with 6Gb Local Disks when running UCS 1.4(2) and earlier software
eleases.
3. This part reached end of sale on 12/16/2011.
4. This drive requires UCS capability catalog version 1.0.54.T or 2.0.1pT or later.
5. This drive requires UCS capability catalog version 1.0.50.T or 2.0.1nT or later.
1
3
73 GB, 6Gb SAS transfer rate2, 15K RPM HDD/hot plug/drive sled mounted
146 GB 6Gb SAS transfer rate2, 10K RPM SFF HDD/hot plug/drive sled mounted
2
, 10K RPM SFF HDD/hot plug/drive sled mounted
2
, 10K RPM HDD/hot plug/drive sled mounted
2
, 10K RPM HDD/hot plug/drive sled mounted
2
2
5
4
5
Removing a Blade Server Hard Drive
To remove a hard drive from a blade server, follow these steps:
Step 1Push the button to release the ejector, and then pull the hard drive from its slot.
Cisco UCS B200 Blade Server Installation and Service Note
10
OL-22473-02
Page 11
Installing and Removing a Blade Server Hard Drive
192686
1
2
3
192524
1
2
Send document comments to ucs-docfeedback@cisco.com
Figure 3Removing the Hard Drive
Step 2
Place the hard drive on an antistatic mat or antistatic foam if you are not immediately reinstalling it in
another blade server.
Step 3Install a blank faceplate (N20-BBLKD) to keep dust out of the blade server if the slot will remain empty.
Installing a Blade Server Hard Drive
To install a blade server hard drive in a blade server, follow these steps:
Step 1Place the hard drive lever into the open position by pushing the release button (see Figure 4).
Figure 4Installing a Hard Drive in a Blade Server
Step 2
Gently slide the hard drive into the opening in the blade server until it seats into place.
OL-22473-02
Cisco UCS B200 Blade Server Installation and Service Note
11
Page 12
Removing and Installing a UCS B200 Blade Server
Send document comments to ucs-docfeedback@cisco.com
Step 3Push the hard drive lever into the closed position.
You can use UCS Manager to format and configure RAID services. refer to the UCS Manager
configuration guide for your software release for details on RAID configuration.
If you need to move a RAID cluster, refer to the Moving a RAID Cluster section of the "Troubleshooting
Server Hardware" chapter of the Cisco UCS Troubleshooting Guide.
Removing and Installing a UCS B200 Blade Server
Before performing any internal operation on a blade server, you must remove it from the chassis. To
prevent ESD damage, wear grounding wrist straps during these procedures and handle modules by the
carrier edges only.
CautionTo prevent ESD damage, wear grounding wrist straps during these procedures and handle modules by
the carrier edges only.
Shutting Down and Powering Off A Blade Server
The server can run in two power modes:
• Main power mode—Power is supplied to all server components and any operating system on your
hard drives can run.
• Standby power mode—Power is supplied only to the service processor and the cooling fans and it
is safe to power off the server from this mode.
After establishing a connection to the blade server’s operating system, you can directly shut down the
blade server using the operating system.
You can invoke a graceful shutdown or an emergency shutdown (hard shutdown) by using either of the
following methods:
• Use the UCS Manager. See either the Cisco UCS Manager GUI Configuration Guide or the Cisco
UCS Manager CLI Configuration Guide.
• Use the Power button on the server front panel. To use the Power button, follow these steps:
Step 1Check the color of the Power Status LED.
• Green indicates that the server is in main power mode and must be shut down before it can be safely
powered off. Go to Step 2.
• Amber indicates that the server is already in standby mode and can be safely powered off. Go to
Step 3.
Step 2Invoke either a graceful shutdown or a hard shutdown:
CautionTo avoid data loss or damage to your operating system, you should always invoke a graceful shutdown
of the operating system.
Cisco UCS B200 Blade Server Installation and Service Note
12
OL-22473-02
Page 13
Removing and Installing a UCS B200 Blade Server
Send document comments to ucs-docfeedback@cisco.com
• Graceful shutdown—Press and release the Power button. The operating system will perform a
graceful shutdown and the server goes to standby mode, which is indicated by an amber Power
Status LED.
• Emergency shutdown—Press and hold the Power button for 4 seconds to force the main power off
and immediately enter standby mode.
Step 3If you are shutting down all blade servers in a chassis, you should now disconnect the power cords from
the chassis to completely power off the servers. If you are only shutting down one server, you can skip
unplugging the chassis and move to removing the server.
Removing a Cisco UCS B200 Blade Server
Using UCS Manager, decommission the server using UCS Manager before physically removing the
server. To remove a blade server from the chassis, follow these steps:
Step 1Loosen the captive screw on the front of the blade.
Step 2Remove the blade from the chassis by pulling the ejector lever on the blade until it unseats the blade
server.
Step 3Slide the blade part of the way out of the chassis, and place your other hand under the blade to support
its weight.
Step 4Once removed, place the blade on an antistatic mat or antistatic foam if you are not immediately
reinstalling it into another slot.
Step 5If the slot is to remain empty, install a blank faceplate (N20-CBLKB1) to keep dust out of the chassis.
Installing a Cisco UCS B200 Blade Server
To install a blade server, follow these steps:
Step 1Grasp the front of the blade server and place your other hand under the blade to support it. See Figure 5.
OL-22473-02
Cisco UCS B200 Blade Server Installation and Service Note
13
Page 14
Removing a Blade Server Cover
19
Send document comments to ucs-docfeedback@cisco.com
Figure 5Positioning a Blade Server in the Chassis
Step 2Open the ejector lever in the front of the blade server.
Step 3Gently slide the blade into the opening until you cannot push it any farther.
Step 4Press the ejector lever so that it catches the edge of the chassis and presses the blade server all the way in.
Step 5Tighten the captive screw on the front of the blade to no more than 3 in-lbs. Tightening with bare fingers
only is unlikely to lead to stripped or damaged captive screws.
Step 6Power on the server. UCS Manager will automatically re acknowledge, reassociate, and recommission
the server, provided any hardware changes are allowed by the service profile.
Figure 5 shows the positioning of a blade server in the chassis. Blade servers reside within the eight
upper slots of the chassis.
Removing a Blade Server Cover
Replacing the cover is the reverse of removing the cover. To open a blade server:
Step 1Press and hold the button down as shown in Figure 6
Step 2While holding the back end of the cover, pull the cover up and back.
Cisco UCS B200 Blade Server Installation and Service Note
14
OL-22473-02
Page 15
Removing a Blade Server Cover
278698
2
1
Send document comments to ucs-docfeedback@cisco.com
Figure 6Opening a Cisco UCS B200 Blade Server
2
252001
1
Air Baffles
The air baffles shown in Figure 7 ship with all M2 models, they direct and improve air flow for the server
components. No tools are necessary to install them, just place them over the DIMMs as shown.
Figure 7Cisco UCS B200 Air Baffles
1Left Baffle2Right Baffle
OL-22473-02
Cisco UCS B200 Blade Server Installation and Service Note
15
Page 16
Removing a Blade Server Cover
Send document comments to ucs-docfeedback@cisco.com
Internal Components
Figure 8 calls out the various components within the blade server.
At blade start-up, POST diagnostics test the CPUs, DIMMs, HDDs and adapter cards, and any failure
notifications are sent to UCS Manager. You can view these notifications in the System Error Log or in
the output of the show tech-support command. If errors are found, an amber diagnostic LED will also
light up next to the failed component. During run time, the blade BIOS, component drivers, and OS all
monitor for hardware faults and will light up the amber diagnostic LED for a component if an
uncorrectable error or correctable errors (such as a host ECC error) over the allowed threshold occur.
LED states are saved, and if you remove the blade from the chassis the LED values will persist for up to
10 minutes. Pressing the LED diagnostics button on the motherboard will cause the LEDs that currently
show a component fault to light for up to 30 seconds for easier component identification. LED fault
values are reset when the blade is reinserted into the chassis and booted, and the process begins from its
start.
If DIMM insertion errors are detected, they may cause the blade discovery to fail and errors will be
reported in the server POST information, viewable using the UCS Manager GUI or CLI. UCS blade
servers require specific rules to be followed when populating DIMMs in a blade server, and the rules
depend on the blade server model. Refer to the documentation for a specific blade server for those rules.
2
4554
3
6
252002
HDD status LEDs are on the front face of the HDD. Faults on the CPU, DIMMs, or adapter cards will
also cause the server health LED to light solid Amber for minor error conditions or blinking Amber for
critical error conditions.
Cisco UCS B200 Blade Server Installation and Service Note
16
OL-22473-02
Page 17
Removing a Blade Server Cover
Send document comments to ucs-docfeedback@cisco.com
Installing a Motherboard CMOS Battery
The B200 blade server supports the following Cisco component:
Supported Components Part Number
CR2032 batteryN20-MBLIBATT
Warning
There is danger of explosion if the battery is replaced incorrectly. Replace the battery only with the
same or equivalent type recommended by the manufacturer. Dispose of used batteries according to
the manufacturer’s instructions.
Statement 1015
To install or replace a motherboard complementary metal-oxide semiconductor (CMOS) battery, follow
these steps:
Step 1Remove a motherboard CMOS battery:
a. Power off the blade, remove it from the chassis, and remove the top cover as described in the
“Removing a Blade Server Cover” section on page 14.
b. Press the battery socket retaining clip toward the chassis wall (see Figure 9).
c. Lift the battery from the socket. Use needle-nose pliers to grasp the battery if there is not enough
clearance for your fingers.
Step 2Install a motherboard CMOS battery:
a. Press the battery socket retaining clip toward the chassis wall.
b. Insert the new battery into the socket with the battery’s negative (–) marking toward the chassis wall.
Ensure that the retaining clip clicks over the top of the battery.
c. Replace the top cover.
d. Replace the server in the chassis and power on the blade by pressing the Power button.
OL-22473-02
Cisco UCS B200 Blade Server Installation and Service Note
17
Page 18
Removing a Blade Server Cover
253408
+
Send document comments to ucs-docfeedback@cisco.com
Figure 9Removing and Replacing a Motherboard CMOS Battery
CPU Replacement
You can order your blade server with two CPUs, or upgrade later to a second CPU. Both CPUs must be
of the same type, and memory in slots intended for the second CPU will not be recognized if the second
CPU is not present (see Memory Arrangement). You may need to use these procedures to move a CPU
from one server to another, or to replace a faulty CPU.
Table 3 and Ta ble 4 show the available CPU options:
Table 3CPU Options, M1 Models
Product IDPower Draw (W)Clock SpeedDDR3Cache
N20-X00001 / Xeon X5570 95W2.93 GHz13338MB
N20-X00002 / Xeon E554080W2.53 GHz10668MB
N20-X00003 / Xeon E552080W2.26 GHz10668MB
N20-X00004 / Xeon L552060W2.26 GHz10668MB
N20-X00006 / Xeon X555095 W2.66 GHz13338 MB
N20-X00009 / Xeon E550480 W2.00 GHz8008 MB
Cisco UCS B200 Blade Server Installation and Service Note
18
OL-22473-02
Page 19
Removing a Blade Server Cover
Send document comments to ucs-docfeedback@cisco.com
Table 4CPU Options, M2 Models
DDR3
Product IDPower Draw (W)Clock Speed
N20-X00001 / Xeon X557095 W2.93 GHz13338MB
N20-X00002 / Xeon E554080 W2.53 GHz10668MB
N20-X00003 / Xeon E552080 W2.26 GHz10668MB
N20-X00004 / Xeon L552060W2.26 GHz10668MB
N20-X00006 / Xeon X555095 W2.66 GHz13338 MB
N20-X00009 / Xeon E550480 W2.00 GHz8008 MB
A01-X0100 / Xeon X5680130 W3.33 GHz133312 MB
A01-X0102 / Xeon X567095 W2.93 GHz133312 MB
A01-X0105 / Xeon X565095 W2.66 GHz133312 MB
A01-X0106 / Xeon L5640 60 W2.26 GHz 106612 MB
A01-X0109 / Xeon E564080 W2.66 GHz106612 MB
A01-X0111 / Xeon E562080 W2.40 GHz106612 MB
A01-X0115 / Xeon X5690130 W3.46 GHz 133312 MB
A01-X0117 / Xeon X567595 W3.06 GHz 133312 MB
A01-X0120 / Xeon E5649 80 W 2.53 GHz133312 MB
UCS-CPU-X5687 / Xeon X5687
UCS-CPU-E5645 / E5645
1. This CPU requires UCS capability catalog version 1.0.50.T or 2.0.1nT or later.
1
130 W 3.60 GHz133312 MB
1
80W2.40 GHz 133312 MB
(MHz)Cache
Removing a CPU and Heat Sink
To remove a CPU and heat sink, follow these steps:
Step 1Unscrew the four captive screws securing the heat sink to the motherboard. See Figure 10, callout 1.
Step 2Remove the heat sink (N20-BHTS1 on both M1 and M2). See Figure 10, callout 2. Remove the old
thermal compound from the bottom of the heat sink using the cleaning kit (UCSX-HSCK= ) available
from Cisco. Follow the instructions on the two bottles of cleaning solvent.
Step 3Unhook the socket latch. See Figure 10, callout 3.
Step 4Open the socket latch. See Figure 10, callout 4.
Step 5Remove the CPU or socket protective cover. See Figure 10, callout 5.
OL-22473-02
Cisco UCS B200 Blade Server Installation and Service Note
19
Page 20
Removing a Blade Server Cover
4
5
1
1
3
1
1
2
252003
Send document comments to ucs-docfeedback@cisco.com
Figure 10Removing The Heat Sink and Accessing the CPU Socket
Installing a CPU and Heat Sink
Before installing a new CPU in a server, verify the following:
• The CPU is supported for that model server.
• A BIOS is available and installed that supports the CPU/DIMM and server combination.
• The service profile for this server in UCS Manager will recognize and allow the new CPU. This is
especially important if you have been using a single processor and install a second processor.
To install a CPU and heat sink, follow these steps:
Step 1Place the CPU on the base with the notches aligned to the pins on the base. See Figure 11, callout 1.
Cisco UCS B200 Blade Server Installation and Service Note
20
OL-22473-02
Page 21
Removing a Blade Server Cover
6
6
6
3
6
2
5
1
4
252004
Send document comments to ucs-docfeedback@cisco.com
Figure 11Inserting the CPU and Replacing the Heat Sink
Step 2Close the socket latch. See Figure 11, callout 2.
Step 3Lock the socket latch into place with the hook. See Figure 11, callout 3.
Step 4Using the tube of thermal compound provided with replacement CPUs and servers (Dow-Corning
Step 5Replace the heat sink (N20-BHTS1). See Figure 11, callout 5.
CautionFor proper cooling, align the arrows on the installed heat sink to point to the front and back of the blade.
Step 6Secure the heat sink to the motherboard by tightening the four captive screws. See Figure 11, callout 6.
Installing Memory
Step 1Open both DIMM connector latches.
TC-1996, Intel D54816-0 or an equivalent may also be used), add a protective film of thermal compound
to the bottom of the heat sink where it will contact the CPU. See Figure 11, callout 4.
Make sure that the heat sink fins are aligned to run along the length of the blade server (see Figure 11).
To install a DIMM into the B200 blade server, follow these steps:
OL-22473-02
Cisco UCS B200 Blade Server Installation and Service Note
21
Page 22
Removing a Blade Server Cover
Send document comments to ucs-docfeedback@cisco.com
Figure 12Installing DIMMs in the Blade Server
1
2
2
1
3
3
252005
Step 2
Step 3Press the DIMM connector latches inward slightly to seat them fully.
Press the DIMM into its slot evenly on both ends until it clicks into place.
Supported DIMMs
The following tables list the type of DIMMs that Cisco Systems makes available for use with this blade
server:
Table 5Cisco Systems Supported DIMMs for M1 Servers
UCS-MR-1X162RY-A16GB DDR3 1333 MHz RDIMM PC3-10600 dual rank/ Low Voltage A
A02-M316GB1-L16GB DDR3 1066 MHz RDIMM PC3-8500 quad rank/Low-Dual Volt
1. This DIMM requires UCS capability catalog version 1.0.37 or later.
2. Low voltage DIMMs require Cisco UCS Manager version 1.2(1) or later, and the related BIOS package.
3. 16 GB DIMMs require Cisco UCS Manager version 1.4(1) and UCS capability catalog version 1.0.16 or later, and the related
BIOS package.
4. This DIMM requires UCS capability catalog version 1.0.40 or later.
5. This DIMM requires UCS capability catalog version 1.0.50.T or 2.0.1nT or later.
6. No longer sold.
Low-Voltage DIMM Considerations
The server can be ordered with low-voltage (1.35 V) DIMM pairs or standard-voltage (1.5 V) DIMM
pairs. Low-voltage DIMM pairs and standard-voltage DIMM pairs can be mixed in the same server. Note
that this causes the system BIOS to default to standard-voltage operation (Performance Mode). That is,
the server cannot operate in the Power Saving Mode unless all DIMM pairs in the server are low-voltage
DIMMs.
There is a setting in the BIOS Setup utility that you can use to change the DDR memory mode when the
server has all low-voltage DIMMs installed. To access this setting, follow these steps:
4
6
5 6
Step 1Enter the BIOS setup utility by pressing the F2 key when prompted during bootup.
Step 2Select the Advanced tab.
Step 3Select Low Voltage DDR Mode.
Step 4In the pop-up window, select either Power Saving Mode or Performance Mode.
• Power Saving Mode–Enables low-voltage memory operation. This setting is available only if all
DIMMs installed are low-voltage DIMMs.
• Performance Mode–Disables low-voltage memory operation. If you mix low-voltage DIMM pairs
with standard-voltage DIMM pairs, the system defaults to this setting.
Step 5Press F10 to save your changes and exit the setup utility, or you can exit without saving changes by
pressing Esc.
OL-22473-02
Cisco UCS B200 Blade Server Installation and Service Note
23
Page 24
Removing a Blade Server Cover
F1
F2
E1
E2
D1
D2
A2
A1
B2
B1
C2
C1
194241
Battery
Send document comments to ucs-docfeedback@cisco.com
Memory Arrangement
The blade server contains 12 DIMM slots—six for each CPU. Each set of six DIMM slots is arranged
into three channels, where each channel has 2 DIMMs (see Figure 13 and Figure 14).
Figure 13Memory Slots within the Blade Server
1
2
194240
1Channels D-F for CPU 22Channels A-C for CPU 1
Each channel is identified by a letter—A, B, C for CPU1, and D, E, F for CPU 2. Each DIMM slot is
identified by a number, either 1 or 2. Note that each DIMM slot 1 is blue, while each slot 2 is black.
Figure 14 shows how DIMMs and channels are physically laid out on the blade server. The DIMM slots
in the upper right are associated with the right CPU, while the DIMM slots in the lower left are associated
with the left CPU.
Figure 14Physical Representation of DIMMs and Channels
24
Cisco UCS B200 Blade Server Installation and Service Note
OL-22473-02
Page 25
Removing a Blade Server Cover
Logical DIMM 2
Logical DIMM 1
Logical DIMM 1
Logical DIMM 2
Channel A
Channel B
Channel C
Channel D
Channel E
Channel F
A1
A2
B1
B2
C1
C2
D1
D2
E1
E2
F1
F2
CPU 1CPU 2
Send document comments to ucs-docfeedback@cisco.com
NoteThe memory in the upper right cannot communicate with the memory in lower left, unless both CPUs
are present.
Figure 15 shows a logical view of the DIMMs and Channels
Figure 15Logical Representation of Logical DIMMs and Channels
DIMMs can be used in the blade server in either a one DIMM per Channel (1DPC) configuration or in
a two DIMMs per Channel (2DPC) configuration.
Each CPU in a Cisco UCS B200 blade server supports 3 channels of 2 memory slots each. In a 1 DPC
configuration, DIMMs are in slot 1 only. In a 2 DPC configuration, DIMMs are in both slot 1 and slot 2.
Table 7 shows the preferred order for installing upgrade DIMMs, and while other configurations may
work if problems arise moving them to the preferred arrangement should help.
Table 7Preferred DIMM Population Order
DIMMs per CPUCPU 1 installed slotsCPU 2 installed slots
1A1D1
2A1, B1 D1, E1,
3A1, B1, C1D1, E1, F1
4A1, A2, B1, C1D1, D2, E1, F1
5A1, A2, B1, B2, C1D1, D2, E1, E2, F1
6A1, A2, B1, B2, C1, C2D1, D2, E1, E2, F1, F2
Memory Performance
When considering the memory configuration of your blade server, there are several things you need to
consider. For example:
• DIMMs within the blade server should all be the same type. This goes for both speed and size. Do
not mix different sized DIMMs or DIMMs with different clock rates in the same blade server. Doing
so will cause a significant loss of performance.
• Your selected CPU(s) can have some affect on performance.
OL-22473-02
Cisco UCS B200 Blade Server Installation and Service Note
25
Page 26
Removing a Blade Server Cover
Send document comments to ucs-docfeedback@cisco.com
• DIMMs can be run in a 1 DIMM per–Channel or a two DIMM per–channel configuration. Each of
these arrangements can provide different behavior.
Bandwidth and Performance
Recommendations for achieving performance of 1333 MHz on B200 M1 servers:
• Ensure the server is running the 1.3(1) or later BIOS version. If a BIOS upgrade is needed, do it
before installing processors or memory.
• Use Intel Xeon X5570 or X5550 processors (PIDs N20-X00001 and N20-X00006).
• Use only Cisco certified single or dual rank DIMMs that support 1333 MHz speeds (see Ta b le 3).
DIMMs do not have to be identical in type or capacity, but beware of the caveats listed in the section
below regarding performance degradation.
• Always set the system BIOS to operate the DIMMs in "Performance" mode in order to run at
1333 MHz.
• Fully populating 1 logical bank or 2 logical banks with DIMMs will ensure optimal memory
bandwidth running at the 1333 MHz speed. If DIMMs are partially populated in 1 bank (less than 6
DIMMs) or 2 bank patterns (less than 12 but greater than 6 DIMMs) the 1333 MHz speed can be
used, but the overall memory bandwidth will not be optimal.
Recommendations for achieving performance of 1333 MHz on B200 M2 servers:
• Use Intel Xeon X5680, X5670, or X5650 processors (see Tab l e 4).
• Use only Cisco certified single or dual rank DIMMs that support 1333 MHz speeds (see Ta b le 6).
DIMMs do not have to be identical in type or capacity, but beware of the caveats listed in the section
below regarding performance degradation.
• Always set the system BIOS to operate the DIMMs in "Performance" mode in order to run at
1333 MHz.
• Fully populating 1 bank or 2 banks with DIMMs will ensure optimal memory bandwidth running at
the 1333 MHz speed. If DIMMs are partially populated in 1 bank (less than 6 DIMMs) or 2 bank
patterns (less than 12 but greater than 6 DIMMs) the 1333 MHz speed can be used, but the overall
memory bandwidth will not be optimal.
Performance Degradation
Performance degradation can occur if the following memory configurations are used:
• Mixing DIMM sizes and densities within a channel
• Partially populating a channel
• Unevenly populating DIMMs between CPUs
Memory Mirroring and RAS
The Intel Nehalem–EP CPUs within the blade server support memory mirroring only when no more than
two Channels are populated with DIMMs. If three Channels are populated with DIMMs, memory
mirroring is automatically disabled. Furthermore, if memory mirroring is used, DRAM size is reduced
by 50% for reasons of reliability.
If the RAS (Reliability, Availability, and Serviceability) option is required, it is available only when
Channel–3 is not populated.
Cisco UCS B200 Blade Server Installation and Service Note
26
OL-22473-02
Page 27
Removing a Blade Server Cover
Send document comments to ucs-docfeedback@cisco.com
Installing an Adapter Card
The network adapters and interface cards all have a shared installation process. The following options
are available:
If you are switching from one type of adapter card to another, before you physically perform the switch
make sure you have downloaded the latest device drivers and loaded them into the server’s operating
system. For more information refer to the firmware management chapter of one of the UCS Manager
software configuration guides.
To install an adapter card on the blade server, follow these steps:
Step 1Position the adapter board connector above the mother board connector and align the three adapter
captive screws to the posts on the motherboard.
Step 2Firmly press the adapter connector into the motherboard connector.
Step 3Tighten the three captive screws.
OL-22473-02
Cisco UCS B200 Blade Server Installation and Service Note
27
Page 28
Server Troubleshooting
Send document comments to ucs-docfeedback@cisco.com
Figure 16Installing an Adapter Card
3
2
1
Server Troubleshooting
For general server troubleshooting information, refer to the "Troubleshooting Server Hardware" chapter
of the Cisco UCS Troubleshooting Guide.
Server Configuration
UCS servers are intended to be configured and managed using UCS Manager. Refer to the UCS Manager
Configuration Guide appropriate for your UCS Manager version
1
1
1
252005
Server Specifications
Table 9Physical Specifications for the Cisco UCS B200 Blade Server
Specification Value
Height 1.95 inches (50 mm)
Width 8.00 inches (203 mm)
Depth 24.4 inches (620 mm)
Weight 13.5 lbs (6.1 kg)
1. The system weight listed here is an estimate for a fully configured system and will vary depending on peripheral devices
installed.
Cisco UCS B200 Blade Server Installation and Service Note
28
1
OL-22473-02
Page 29
Related Documentation
Send document comments to ucs-docfeedback@cisco.com
Related Documentation
The documentation set for the Cisco Unified Computing System environment is described in full at:
Obtaining Documentation and Submitting a Service Request
For information on obtaining documentation, submitting a service request, and gathering additional
information, see What’s New in Cisco Product Documentation at:
Subscribe to What’s New in Cisco Product Documentation, which lists all new and revised Cisco technical
documentation, as an RSS feed and deliver content directly to your desktop using a reader application. The
RSS feeds are a free service.
Cisco and the Cisco logo are trademarks or registered trademarks of Cisco and/or its affiliates in the U.S. and other countries. To view a list of
Cisco trademarks, go to this URL: www.cisco.com/go/trademarks. Third-party trademarks mentioned are the property of their respective owners. The
use of the word partner does not imply a partnership relationship between Cisco and any other company. (1110R)
Any Internet Protocol (IP) addresses and phone numbers used in this document are not intended to be actual addresses and phone numbers. Any
examples, command display output, network topology diagrams, and other figures included in the document are shown for illustrative purposes only.
Any use of actual IP addresses or phone numbers in illustrative content is unintentional and coincidental.
OL-22473-02
Cisco UCS B200 Blade Server Installation and Service Note
29
Page 30
Related Documentation
Send document comments to ucs-docfeedback@cisco.com