Cisco Systems N55M4Q User Manual

CHAP T E R
2
Switch Installation
This chapter describes how to start your switch and how to interpret the power-on self-test (POST) that ensures proper operation. It also describes how to install the switch.
Read the topics and perform the procedures in this order:
Preparing for Installation, page 2-1
Verifying Switch Operation, page 2-5
Mounting the Switch, page 2-5
Installing a Cover for the Reset Button (Optional), page 2-24
Installing the Power Cord Retainer (Optional), page 2-25
Installing the Cable Guard (Optional), page 2-28
Connecting Devices to the Ethernet Ports, page 2-33

Preparing for Installation

Warnings, page 2-1
Installation Guidelines, page 2-3
Equipment That You Supply, page 2-4
Box Contents, page 2-4
Powering the Switch, page 2-4

Warnings

These warnings are translated into several languages in the Regulatory Compliance and Safety Information for the Catalyst 3560-C and the 2960-C Switches guide.
Warning
Before working on equipment that is connected to power lines, remove jewelry (including rings, necklaces, and watches). Metal objects will heat up when connected to power and ground and can cause serious burns or weld the metal object to the terminals.
Statement 43
OL-23803-02
Catalyst 3560-C and 2960-C Switch Hardware Installation Guide
2-1
Preparing for Installation
Chapter 2 Switch Installation
Warning
Warning
Warning
Warning
Warning
Read the wall-mounting instructions carefully before beginning installation. Failure to use the correct hardware or to follow the correct procedures could result in a hazardous situation to people and damage to the system.
Statement 378
Do not work on the system or connect or disconnect cables during periods of lightning activity.
Statement 1001
Read the installation instructions before connecting the system to the power source.
Statement 1004
This product relies on the building’s installation for short-circuit (overcurrent) protection. Ensure that the protective device is rated not greater than: 20 A
Statement 1005
To prevent bodily injury when mounting or servicing this unit in a rack, you must take special precautions to ensure that the system remains stable. The following guidelines are provided to ensure your safety:
Warning
Warning
Warning
• This unit should be mounted at the bottom of the rack if it is the only unit in the rack.
• When mounting this unit in a partially filled rack, load the rack from the bottom to the top with the heaviest component at the bottom of the rack.
• If the rack is provided with stabilizing devices, install the stabilizers before mounting or servicing the unit in the rack.
Class 1 laser product.
Statement 1006
Statement 1008
This equipment must be grounded. Never defeat the ground conductor or operate the equipment in the absence of a suitably installed ground conductor. Contact the appropriate electrical inspection authority or an electrician if you are uncertain that suitable grounding is available.
Statement 1024
Ultimate disposal of this product should be handled according to all national laws and regulations.
Statement 1040
2-2
Catalyst 3560-C and 2960-C Switch Hardware Installation Guide
OL-23803-02
Chapter 2 Switch Installation
Preparing for Installation
Warning
Warning
Warning
Warning
Warning
For connections outside the building where the equipment is installed, the following ports must be connected through an approved network termination unit with integral circuit protection: 10/100/1000 Ethernet.
To prevent the system from overheating, do not operate it in an area that exceeds the maximum recommended ambient temperature of: 113°F (45°C)
Statement 1047
Note For Catalyst 3560CG-8PC-S, 3560CG-8TC-S, and 2960CG-8TC-L switches, the maximum
Statement 1044
recommended ambient temperature is: 104°F (40°C).
No user-serviceable parts inside. Do not open.
Installation of the equipment must comply with local and national electrical codes.
To prevent airflow restriction, allow clearance around the ventilation openings to be at least: 3 in. (7.6 cm)
Statement 1076
Statement 1073
Statement 1074
Warning
Hot surface.
Note Applies to the Catalyst 3560CG-8PC-S switch.

Installation Guidelines

Before installing the switch, these guidelines must be met:
The operating environment must be within the ranges listed in Appendix A, “Technical
Specifications.”
Cabling is away from sources of electrical noise, such as radios, power lines, and fluorescent
lighting fixtures. Make sure that the cabling is away from other devices that might damage the cables.
Airflow around the switch and through the vents must be unrestricted. We strongly recommend that
you allow at least 3 in. (7.6 cm) of clearance from the left, right, and top sides of the switch to avoid any flow blockage. If you are installing the switch in a rack, allow at least 1.75 in. (4 cm) of empty rack space above each switch.
Catalyst 3560CG-8PC-S, 2960C-8PC-L, 2960C-12PC-L, 3560C-8PC-S, and 3560C-12PC-S
switches: Allow at least 1.75 in. (4 cm) clearance from the ends of the external heat sink fins.
Statement 1079
OL-23803-02
Catalyst 3560-C and 2960-C Switch Hardware Installation Guide
2-3

Powering the Switch

Chapter 2 Switch Installation
Temperature around the unit does not exceed 113°F (45°C).
If the switch is installed in a closed environment or in a multirack assembly, the temperature around it might be greater than normal room temperature.
Humidity around the switch must not exceed 95 percent.
Altitude at the installation site must not be greater than 10,000 feet (3,049 meters).
Do not place any items on the top of the switch.
Do not wall-mount the switch with its front panel facing up. Following safety regulations,
wall-mount the switch with its front panel facing down or to the side to prevent airflow restriction and to provide easier access to the cables.
Clearance to the switch front and rear panels meets these conditions:
You can easily read the front-panel LEDs.
Access to ports is sufficient for unrestricted cabling.
The AC power cord can reach from the AC power outlet to the connector on the switch rear panel.
For 10/100 and 10/100/1000 fixed ports, cable lengths from the switch to connected devices are not
more than 328 feet (100 meters).
For cable lengths for small form-factor pluggable (SFP)-module connections, see the “SFP Module
Connectors” section on page B-2 and the module documentation.

Equipment That You Supply

You might need this equipment to install the switch:
Number-2 Phillips screwdriver
Drill with a #27 drill bit (0.144-inch [3.7 mm])

Box Contents

The switch getting started guide on Cisco.com describes the box contents. If any item is missing or damaged, contact your Cisco representative or reseller for support.
Powering the Switch
Before installing the switch in a rack, on a desk, a shelf, or a wall, you should power on the switch and verify that it passes POST.
Power the switch:
2-4
Catalyst 2960CPD-8PT-L and 2960CPD-8TT-L
Connect a 10/100/1000 uplink port to a PoE or PoE+ switch, such as a Catalyst 3750-X.
Or
Plug the auxiliary power adapter cord into the switch AUX power connector and into an AC power
outlet.
Catalyst 3560-C and 2960-C Switch Hardware Installation Guide
OL-23803-02
Chapter 2 Switch Installation
Note You can use both the uplink port and the auxiliary power adapter. However, the auxiliary power
Catalyst 3560CPD-8PT-S
Connect a 10/100/1000 uplink port to a PoE+ switch, such as a Catalyst 3750-X.
Plug the auxiliary power adapter cord into the switch AUX power connector and into an AC power
Note You can use both the uplink port and the auxiliary power adapter. However, the auxiliary power
All models (except the Catalyst 2960CPD-8PT-L, 2960CPD-8TT-L, and 3560CPD-8PT-S)
Plug the AC power cord to the switch AC power connector and into an AC power outlet.

Verifying Switch Operation

input takes precedence.
Or
outlet.
input takes precedence.
Verifying Switch Operation
As the switch powers on, it begins the POST, a series of tests that runs automatically to ensure that the switch functions properly. LEDs blink during the test, which lasts approximately 1 minute. When the switch begins POST, the System, Status, Duplex, and Speed LEDs turn green. The System LED blinks green, and the other LEDs remain green.
When the POST completes successfully, the System LED turns green. The other LEDs turn off and then reflect the switch operating status. If a switch fails POST, the System LED turns amber.
POST failures are usually fatal. Call Cisco technical support representative if your switch fails POST.
After a successful POST, unplug the power cord from the switch. Mount the switch in a rack on a desk or shelf, under a desk or shelf, or on a wall, as described in the “Mounting the Switch” section on
page 2-5.

Mounting the Switch

On a Desk or Shelf (without Mounting Screws)
Desk, Shelf, or Wall (with Mounting Screws)
With a Mounting Tray
In a Rack
On a DIN Rail
OL-23803-02
Catalyst 3560-C and 2960-C Switch Hardware Installation Guide
2-5
Mounting the Switch

On a Desk or Shelf (without Mounting Screws)

Step 1 Locate the adhesive strip with the rubber feet in the accessory kit.
Step 2 Remove the four rubber feet from the adhesive strip, and attach them to the recessed areas on the bottom
of the unit. This prevents the switch from sliding on the desk or shelf.
Note We strongly recommend that you attach the rubber feet. Doing so helps prevent airflow
restriction and overheating.
Step 3 Place the switch on the desk or shelf.
Chapter 2 Switch Installation
Warning
To prevent airflow restriction, allow clearance around the ventilation openings to be at least: 3 in. (7.6 cm)
Statement 1076
After you mount the switch, see the “After Installing the Switch” section on page 2-31 for information about the switch configuration.

Desk, Shelf, or Wall (with Mounting Screws)

You can use the mounting screws to mount the switch:
On a desk or a shelf
Under a desk or a shelf
On a wall

Desk- or Shelf-Mounting

Step 1 Use the screw template to align the mounting screw holes and also as a guide to make sure that you install
the screws into the desk or shelf with proper clearance.
Step 2 Position the screw template on top of the desk or shelf so that the two side-by-side slots face the front of
the desk or shelf, as shown in Figure 2-1. This ensures that the power cord faces the rear of the desk or shelf after the switch is installed.
2-6
Note Wait before you attach the screw template to the desk or shelf.
Catalyst 3560-C and 2960-C Switch Hardware Installation Guide
OL-23803-02
Chapter 2 Switch Installation
Figure 2-1 Installing the Mounting Screws on Top of a Desk or a Shelf
1 Screw template 3 Desk or shelf
2 Screws
Mounting the Switch
2
3
1
210096
Step 3
Step 4 Use a 0.144-inch (3.7 mm) or a #27 drill bit to drill a 1/2-inch (12.7 mm) hole in the three screw
Peel the adhesive strip off the bottom of the screw template, and attach it to the top of the desk or shelf.
template slots.
Step 5 Insert three screws in the slots on the screw template, and tighten them until they touch the top of the
screw template.
Step 6 Remove the screw template from the desk or shelf.
Step 7 Place the switch onto the mounting screws, and slide it forward until it locks in place. See Figure 2-2.
Warning
To prevent airflow restriction, allow clearance around the ventilation openings to be at least: 3 in. (7.6 cm)
Statement 1076
OL-23803-02
Catalyst 3560-C and 2960-C Switch Hardware Installation Guide
2-7
Mounting the Switch
MODE
S
e
r
ie
s
PD
POWER
OVE
R
ETHE
R
NET
Figure 2-2 Mounting the Switch on Top of a Desk or Shelf
SYST
ST
A
T
D
PL
X
12345678
SPD
PoE
PD
C
O
NS
O
LE
1
1
2
Chapter 2 Switch Installation
282394
3
1 Slides on this way 3 Desk or shelf
2 Screws
After you mount the switch, see the “After Installing the Switch” section on page 2-31 for information about configuring the switch.

Under the Desk- or Shelf-Mounting

Step 1 Use the screw template to align the mounting screw holes and also as a guide to make sure the screws
are installed under the desk or shelf with proper clearance.
Step 2 Position the screw template underneath the desk or shelf so that the two side-by-side slots face the front
of the desk or shelf, as shown in Figure 2-3. This ensures that the power cord faces the rear of the desk or shelf after the switch is mounted.
Step 3 Peel the adhesive strip off the bottom of the screw template, and attach it to the underside of the desk or
shelf.
2
Catalyst 3560-C and 2960-C Switch Hardware Installation Guide
2-8
OL-23803-02
Chapter 2 Switch Installation
Figure 2-3 Installing the Mounting Screws Under a Desk or Shelf
Mounting the Switch
1
2
3
4
3
250146
1 Desk or shelf 3 Screws
2 Screw template 4 Adhesive
Step 4
Use a 0.144-inch (3.7 mm) or a #27 drill bit to drill a 1/2-inch (12.7 mm) hole in the three screw template slots.
Step 5 Insert three screws in the slots on the screw template, and tighten until they touch the top of the screw
template.
Step 6 Remove the screw template from underneath the desk or shelf.
Step 7 Place the switch upside down onto the mounting screws, and slide it forward until it locks in place. See
Figure 2-4.
Warning
To prevent airflow restriction, allow clearance around the ventilation openings to be at least: 3 in. (7.6 cm)
Statement 1076
OL-23803-02
Catalyst 3560-C and 2960-C Switch Hardware Installation Guide
2-9
Mounting the Switch
M
O
D
E
Ca
t
aly
s
t
296
0
-C
Se
r
ies
P
D
POW
E
R
OV
E
R
E
T
H
E
R
N
ET
Figure 2-4 Mounting the Switch Under a Desk or Shelf
1
2
2
1
8
7
6
5
4
3
2
3
E
L
O
S
N
O
C
D
P
E o
P
D
P
S
1
X
L
P
D
TAT
S
T
S
Y
S
Chapter 2 Switch Installation
282395

Wall-Mounting

Warning
Caution Do not wall-mount the switch with its front panel facing up. Following safety regulations, wall-mount
1 Desk or shelf 3 Slides on this way
2 Screws
After you mount the switch, see the “After Installing the Switch” section on page 2-31 for information about configuring the switch.
Read the wall-mounting instructions carefully before beginning installation. Failure to use the correct hardware or to follow the correct procedures could result in a hazardous situation to people and damage to the system.
Statement 378
the switch with its front panel facing down or to the side to prevent airflow restriction and to provide easier access to the cables.
Catalyst 3560-C and 2960-C Switch Hardware Installation Guide
2-10
OL-23803-02
Chapter 2 Switch Installation
Step 1 Locate the screw template. The template is used to align the mounting screw holes.
Note Figure 2-5 shows the measurements for the location of the screws on the switch.
Step 2 Position the screw template so that the two side-by-side slots face toward the floor, as shown in
Figure 2-6.
For the best support of the switch and cables, make sure that you attach the switch securely to a wall stud or to a firmly attached plywood mounting backboard.
Step 3 Peel the adhesive strip off the bottom of the screw template.
Step 4 Attach the screw template to the wall.
Step 5 Use a 0.144-inch (3.7 mm) or a #27 drill bit to drill a 1/2-inch (12.7 mm) hole in the three screw
template slots.
Step 6 Insert three screws in the slots on the screw template, and tighten until they touch the top of the
screw template.
Step 7 Remove the screw template from the wall.
Mounting the Switch
Figure 2-5 Location of the Mounting Holes on the Switch
6
5
4
OL-23803-02
1
2
3
330380
1 1.77 in. (4.49 cm) 4 2.67 in. (6.78)
2 3.72 in. (9.44 cm) 5 2.46. in. (6.24)
3 3.62 in. (9.19 cm) 6 Switch
Catalyst 3560-C and 2960-C Switch Hardware Installation Guide
2-11
Loading...
+ 25 hidden pages