Cisco MS410-16, MS410-32 Installation Manual

Page 1
MS410 Series Installation Guide
Models
Model number Description
Layer-3 16-port 1Gbe SFP and 2-port
MS410-16
MS410-32
Package contents
In addition to the MS switch, the following are provided (mounting kit provided with 1U models only):
10Gbe SFP+ aggregation switch with 1 management interface and hot-swappable power supplies / fans
Rack Mount Kit includes:
• US 12-24 mounting screws and cage nuts, 5 of each
• INTL M5 mounting screws and cage nuts, 5 of each
• INTL M6 mounting screws and cage nuts, 5 of each
• Mounting washers
1
Page 2
MS410-16 Series front panel
MS410-32 Series front panel
Power input
The MS comes standard with US power cord. EU/ UK/AU power cords may be ordered separately.
MS410 Series Back Panel
Ports and Status Indicators
The MS uses LEDs to inform the user of the device's status. When the device powers on, the main LED will be amber.
Additional functions are described below, from left to right.
Item Function LED Status Meaning
Restore button to clear
1 Restore N/A
switch IP and local configuration settings
2 Fan Orange
3 Power (PSU) Orange
One or more of the system fans has malfunctioned or is missing
One of the system PSUs (power supplies) has malfunctioned or is missing
2
Page 3
2
Status Orange
Switch is unable to or
has not yet connected
to the Meraki cloud
Flashing green
White
Alternating
Off
3 Switch Port LEDs Off No client connected
Solid orange 10/100/1000 Mbps
Firmware upgrade in
process
Switch is fully
operational and
connected to the
Meraki cloud
Switch is booting, searching for uplink to Meraki Cloud
Switch does not have power
Solid green 10,000 Mbps (10Gbps)
In addition, there is a RESTORE button available on the front panel.
Insert a paper clip if a restore is required.
• A brief, momentary press: To delete a downloaded configuration and reboot.
• Press and hold for more than 10 sec: To force the unit into a full factory restore.
Management Port
This port is designed to access the local switch configuration page only. For more information on local configuration,
please see Local Configuration.
The management port can not be used as a standard switched port
3
Page 4
The MS410 series will ship with all fans and a single power supply included. Any additional parts, including fans and
power supplies, can be purchased separately.
Equipment is to be used only in a restricted access location and installed/operated only by trained service personnel.
Bringing your Stack Online
When connecting up your MS410 stack the recommended cabling method is to connect one uplink and then connect the stacking cables from stack port 1 to stack port 2 of the next switch. When at the bottom switch stack port 1 should connect back up to stack port 2 of the top switch. With this setup the switches will be able to connect to dashboard and update themselves and received any configuration necessary. Once the switches are up to date you may cable and configure as necessary.
It's recommended for bring-up to connect all of the stacking cables and a single uplink on the stack before powering the
switches on. This will allow all switches to connect and download any necessary firmware and configuration. The Status
LED will blink during firmware updates so that it will be visible if a switch is upgrading. Once all switches have had a
chance to update and are displaying solid White Status LEDs feel free to connect up the rest of the cables. More
information on dashboard for stacks can be found here.
4