Cirris CH2 Performance Test Manual

Page 1
CH2
Performance Verification Manual
For the CH2 using
easy-wire software version 2009 or higher
Version 2014
An ISO 9001 Certified Company
Page 2
CH2 Performance Verification Manual
Version 2014.1.0
June 10, 2014
Copyright by Cirris System Corporation
1991 Parkway Boulevard
Salt Lake City, Utah 84119-2026
U.S.A
www.cirris.com
All Rights Reserved
Page 3
Performance Verification
Introduction
The CH2 Performance Verification Kit allows you to verify calibration and proper operation of the Cirris CH2 tester. Each CH2 Performance Verification Kit has a calibration date of five years from the time of purchase. At the end of five years, the kit should be replaced or recalibrated. Each component of this performance verification kit is tested with instruments traceable to the NIST.
At least once a year, use the performance verification kit to verify the calibration of the CH2. Also, use the kit whenever you suspect a problem with the CH2.
Note: There are no adjustments made to the CH2 tester during the performance verification process. If the CH2 fails any step in the performance verification procedure, the tester must be sent back to Cirris for repair.
For helpful information on setting up a calibration system to meet national calibration standards such as ANSI/NCSL Z540-1, and ISO 10012-1, see Setting up a Calibration System in the appendix of this manual.
This calibration procedure requires easy-wire software version 8.6 or higher.
You Should Have Received:
Performance Verification
This Document
Calibration Documents
CH2 Low Voltage Test Adapter
CH2 High Voltage Test Adapter
CH2 Zero Ohm Test Adapter
1
Page 4
Performance Verification
Required to Perform the Test:
Import/Configure the Test Files
Before performing the calibration procedure, you must import the test files to the station(s) or network where the performance verification procedure is being performed. The following steps will create a category called Calibration. Import the test files into the Calibration category, and configure the test files to run.
To ensure you have the correct test files, re-import the files any time you update easy-wire or anytime you haven’t run the test in a while. Re-importing test files guarantees they are the correct version.
1. Start the easy-wire software.
2. From the Main Menu, click Utilities.
A multimeter capable of measuring AC and DC voltages. For both AC and DC the meter needs an input resistance of 10Mohm (+/-10%) and a measurement accuracy better than +/-1%.
(avoid using a bench top meter)
Standard Pin Probe Test Leads for a multimeter.
2
Page 5
Performance Verification
3. Click Test Category Maintenance (or Test
Category Maintenance in version 8.6).
4. Make sure Test Program is checked. Click the down arrow and see if there is a category called Calibration.
If there is no Category called Calibration, create one by entering the word “Calibration” in the text box and clicking Add.
5. Click Done.
6. Click Done.
Make sure
Test Program is
checked.
Click the down arrow to see the available categories.
3
Page 6
Performance Verification
7. Select Calibration as the category.
8. Click Utilities.
9. In System Utilities, click Import.
10. Click Import Text File.
11. Browse to the path where the calibration files are located.
c:\Documents and Settings\All Users\Shared Documents\Cirris
\easywire\calfiles\CH2
Vista stores the files in:
c:\Users\Public\Public Documents\Cirris
\easywire\calfiles\CH2
12. Click CH2VerificationTest.txt, and click Open.
4
Page 7
Performance Verification
13. Click Import.
14. You may be asked to choose an existing category for storing connector types. If so, choose any category and click OK.
(This window will only appear the first time calibration files are imported.)
15. When asked for a test program name, click
OK.
16. Follow the same process to import the test file to test your CHE scanner modules.
Import: CH2ZeroOhm.txt
5
Page 8
Performance Verification
17. When you have imported all the files, click Done to return to the main menu.
18. Select the CH2VerificationTest.
19. Click Edit.
Making Calibration Records
Your calibration system requirements may require you to prepare forms to record the performance verification tests. At the end of the appendix you will find a CH2 Certificate of Calibration and a CH2 Calibration Data Report. If using these forms, make a photocopy of each one so you can maintain clean masters for the next time you perform the test procedure.
To fulfill more detailed test reporting requirements, you can use the test reporting capabilities of the CH2 system. To setup this capability, see Creating Test Reports in the appendix.
6
Page 9
Test Procedure
To verify the calibration of the CH2 analyzer, you will test the operation of the measurement
system as well as the operation of each of the 160 point scanner modules.
To test the measurement system:
1. Install the CH2 Low Voltage Calibration Adapter on the first connector of the
CH2 Test Point Scanner.
Install the CH2 High Voltage Calibration Adapter on the second connector on the
CH2 Test Point Scanner.
2. From the Main Menu, click the test
program CH2VerificationTest and click Test.
CH2 Low Voltage Test Adapter
Test Procedure
CH2 High Voltage Test Adapter
7
Page 10
Test Procedure
3. Click Start.
4. The CH2 Verification Assistant window will open. Once the test starts, this window will give you prompts to complete the test.
8
Page 11
Test Procedure
5. When the CH2 Verification Assistant prompts you to attach the meter leads to the CH2 Low Voltage Test Adapter, insert the positive lead into the top jack and the negative lead into the bottom jack.
6. Set the meter to the range shown in the prompt (“Vdc” for example).
Be ready to read the meter! Once you click Okay, a voltage will appear on the meter. The value will only be shown for several seconds so be ready to read it.
7. Read the meter and enter the value (in volts) into the box on the Verification Assistant and click Okay.
Note: Some meters auto-scale the measured results differently. The CH2 test is written to accept values as volts. For example, if the prompt is asking for an AC Voltage Measurement and the meter shows a value of 100 mV, the typed value will be 0.100.
8. When the Verification Assistant prompts you to attach the meter leads to the CH2 High Voltage Test Adapter. Move the positive lead into the top jack and the negative lead into the bottom jack of the HV Test Adapter.
9
Page 12
Test Procedure
9. Each time you are prompted to read the meter make sure you set the meter to the range shown in the prompt (“Vdc” or “Vac” for example).
Be ready to read the meter! Once you click Okay, a voltage will appear on the meter. The value will only be shown for several seconds so you need to be ready to read it.
10. When you are ready to read the meter, click Okay.
11. Read the meter and enter the value (in volts) into the box on the Verification Assistant and click Okay.
Note: The HV Cal Adapter contains a voltage divider circuit that reduces the high voltage down to safe levels. This should work for any type of meter and will be harmless if you come in contact with the meter leads during the test.
Tests show their status as they are being performed.
When complete, the test will show its final status of PASSED or FAILED.
10
Page 13
Test Procedure
Once the test is complete, the Verification Assistant will ask you where you would like to save the test results.
12. Choose a path and file name for the test results.
13. Click Save.
The text file (.csv) that will be saved can be loaded into any spreadsheet program.
Note: There are no adjustments made to the CH2 tester during the performance verification process. If the CH2 fails any step in the performance verification procedure, the tester must be sent back to Cirris for repair.
Test results can be viewed for each individual test by selecting the test you want to view:
and clicking the Selected Test Result tab.
11
Page 14
Test Procedure
The details of the specific test as well as the measured values will be displayed.
You can save additional copies of the test results to a .csv file by clicking Save Results.
12
Page 15
Test Procedure
To test the scanner modules:
1. Remove the CH2 Low Voltage Test Adapter and the CH2 High Voltage Test Adapter from the CH2 analyzer.
2. Locate the CH2 Zero Ohm Cal Adapter.
3. From the Main Menu, select the CH2ZeroOhm test from the list.
4. Click Test.
5. Attach the CH2 Zero Ohm Cal Adapter to the first Scanner Module.
Note: The adapter is keyed to only fit one way on the Scanner Module.
6. When the test shows Ready to Test, click Start.
13
Page 16
Test Procedure
7. Press the zero ohm adapter firmly on the front of the scanner module 1 and press OK.
8. The test will run automatically.
9. The final status of the test will be displayed. All of the module tests should pass.
The results can be marked on the Test Results form at the end of these instructions.
10. Click Done.
11. Move the CH2 Zero Ohm Cal Adapter to the corresponding scanner module, and press ok to continue the tests, until all the Scanner Modules have been tested.
.
Testing is now complete.
14
Page 17
Appendix
Setting Up a Calibration System
The information below is meant as an introduction to setting up a formal calibration system in your organization.
Calibration Standards
Calibration standards refer to written quality system requirements for organizations that perform calibrations and use calibrated equipment. Establishing a quality system according to calibration standards helps ensure calibrations are done competently and lends credibility to the calibration organization. In the United States, common calibration standards include ANSI/NCSL Z540-1, ISO/IEC Guide 25, ISO 10012-1, and the former MIL-STD 45662A.
The ANSI/NCSL Z540 standard referred to above, as well as other helpful metrology information, can be obtained from the National Conference of Standards Laboratories International (NCSL) at 1-303-440-3339 or www.ncslinternational.org. You can obtain the ISO standards from the International Standards Organization (ISO) at their web site
www.iso.net/.
Good Calibration Practices
The calibration standards, such as ANSI/NCSL Z540-1 and ISO 10012-1 require several good practices for the calibration industry including the following areas:
Establish a recall system
How do you ensure that you don’t forget to send an instrument in for calibration? A recall system can be a card file or a computerized database which includes calibration dates, due dates, calibration sources, and other instrument records. The recall system ensures calibrated instruments are recalibrated in a timely manner.
Calibration Labels
How does someone know if an instrument has been calibrated without looking for the paperwork in a filing cabinet drawer? When an instrument is calibrated, the calibration standards require the instrument to be labeled as such. The calibration labels, which are applied to instruments, have fields for the instrument serial number, calibration date, calibration due date, and by whom.
Test Accuracy Ratios
Wherever possible, calibration standards require an accuracy ratio of at least four to one. In other words, the insturment being used to measure the calibrated instrument should be at least four times as accurate as the calibrated instrument.
Certificate of Calibration
How does everyone know you had an instrument calibrated? The calibration certificate is the record of who, when, and by what equipment the instrument was calibrated. A CH2 Certificate of Calibration, which you can photocopy for your calibration, is provided following this section.
Appendix
15
Page 18
Appendix
Calibration Data Report
So how accurate is the calibrated test instrument in relation to its published specifications? Some organizations require the measured values of a calibrated instrument are written down when an instrument is calibrated. Calibration laboratories typically charge extra to create a calibration data report. However, when a calibrated instrument is found to be out-of-tolerance, the calibration standards require the out-of- tolerance data be recorded in relation to the instruments specifications. A calibration data report can fill this requirement. A calibration data report, you can photocopy to use for your CH2 calibration, is provided following this section.
Traceability
Did qualified personnel perform the calibration procedure under controlled conditions, using correctly calibrated instruments with the correct test accuracy ratios? To maintain traceability, the answer to all these questions must be yes. Traceability refers to each unbroken link of valid calibrations going back to national standards such as those maintained by the NIST in the United States.
Several years ago NIST numbers (ie. reference numbers issued on NIST reports) were commonly copied on successive calibration certificates as a means of showing traceability. This practice has been discontinued. Therefore, if you are writing a calibration procedure, do not require NIST numbers be copied on reports to show traceability. NIST numbers are sometimes confused with other numbers that calibration laboratories create for reference such as “asset numbers”, “NIST trace numbers”, “ID numbers”, and “report numbers.” For more information regarding the discontinued use of NIST numbers, Cirris can provide a copy of the position paper from the National Conference of Standards Laboratories.
16
Page 19
Appendix
Creating Test Reports
The results of the performance verification are stored two of the following ways.
1. The CH2VerificationTest allows you to save a .csv file that contains the results of each test performed on the measurement system of the CH2. The .csv file can be examined, printed, and loaded into any spreadsheet program; it’s intended to be a key part of your test results.
2. The results for all test runs (both the CH2VerificationTest and each of the
C_CalModule tests) are stored in the easy-wire database and are accessible from the Test Archive Report or from the In Process Report, features of the easy-wire software.
Those reports save the summary of the testing that was done. If required, you can have the CH2 save more information about the tests. To save more information for each test, do the following steps:
Before running the test:
1. From the easy-wire Main Menu, click on the test program you wish to use to turn on the test data storage options.
2. Click Edit.
3. At the top of the Test Program Editor screen, click the Set Test Defaults tab.
4. Check the Store measured test value box.
5. Check the Store High Voltage IR Values box (if the box is enabled).
6. Click Done at the bottom of the screen.
7. Select Yes, save changes and return to the main menu.
After the test program completes, while still in the test:
1. Click Reports at the bottom of the test program screen.
2. Click In Process Report and a test report will open.
3. Use the report’s Print Menu to print or create a .pdf of the report.
Customer Service
If you need any assistance with this performance verification, call Cirris customer service toll­free at 1-800-441-9910.
Cable/Harness testing made easy
17
Page 20
CH2 Certificate of Calibration
Organization performing the calibration:
Organization Address: Certificate Number:
Calibrated by:
Calibrated:
Due:
Applicable Calibration Standard(s):
Procedure:
CH2 Performance Verification
Temperature:
Relative Humidity:
Serial Numbers:
Instruments used:
Serial Number
Cal Date
Due
CH2 Low Voltage Calibration Adapter
CH2 High Voltage Calibration Adapter
CH2 Zero Ohm Calibration Adapter
Multimeter
Statement of Traceablility:
Certified by:
Page 21
CH2 Calibration Data Report
Report Number:
Calibrated by:
Tester Serial Number:
Calibration date:
Test / Serial Number
Recorded
Value
Test / Serial Number
Recorded
Value
Scanner Module 1
Pass / Fail
Scanner Module 21
Pass / Fail
Scanner Module 2
Pass / Fail
Scanner Module 22
Pass / Fail
Scanner Module 3
Pass / Fail
Scanner Module 23
Pass / Fail
Scanner Module 4
Pass / Fail
Scanner Module 24
Pass / Fail
Scanner Module 5
Pass / Fail
Scanner Module 25
Pass / Fail
Scanner Module 6
Pass / Fail
Scanner Module 26
Pass / Fail
Scanner Module 7
Pass / Fail
Scanner Module 27
Pass / Fail
Scanner Module 8
Pass / Fail
Scanner Module 28
Pass / Fail
Scanner Module 9
Pass / Fail
Scanner Module 29
Pass / Fail
Scanner Module 10
Pass / Fail
Scanner Module 30
Pass / Fail
Scanner Module 11
Pass / Fail
Scanner Module 31
Pass / Fail
Scanner Module 12
Pass / Fail
Scanner Module 32
Pass / Fail
Scanner Module 13
Pass / Fail
Scanner Module 33
Pass / Fail
Scanner Module 14
Pass / Fail
Scanner Module 34
Pass / Fail
Scanner Module 15
Pass / Fail
Scanner Module 35
Pass / Fail
Scanner Module 16
Pass / Fail
Scanner Module 36
Pass / Fail
Scanner Module 17
Pass / Fail
Scanner Module 37
Pass / Fail
Scanner Module 18
Pass / Fail
Scanner Module 38
Pass / Fail
Scanner Module 19
Pass / Fail
Scanner Module 39
Pass / Fail
Scanner Module 20
Pass / Fail
Scanner Module 40
Pass / Fail
Loading...