Circutor PV2-6, PV2-8, PV2-10, PV2-12, PV2-16 Installation Manual

...
INSTALLATION GUIDE
(M233A01-03-18A)
Canopies
PV2
2
Installation Guide
SAFETY PRECAUTIONS
DISCLAIMER
CIRCUTOR, SA reserves the right to make modi cations to the device or the unit speci ca-
tions set out in this instruction manual without prior notice.
CIRCUTOR, SA on its web site, supplies its customers with the latest versions of the device speci cations and the most updated manuals.
www.circutor.com
CIRCUTOR, recommends using the original cables and accessories that are supplied with the device.
DANGER
Warns of a risk, which could result in personal injury or material damage.
ATTENTION
Indicates that special attention should be paid to a speci c point.
Follow the warnings described in this manual with the symbols shown below.
If you must handle the unit for its installation, start-up or maintenance, the following should be taken into consideration:
Incorrect handling or installation of the unit may result in injury to personnel as well as damage to the unit. In particular, handling with voltages applied may result in electric shock, which may cause death or serious injury to personnel. Defective installation or maintenance may also lead to the risk of  re. Read the manual carefully prior to connecting the unit. Follow all installation and maintenance instructions throughout the unit’s working life. Pay special attention to the installation stan­dards of the National Electrical Code.
Refer to the instruction manual before using the unit
In this manual, if the instructions marked with this symbol are not respected or carried out correctly, it can result in injury or damage to the unit and /or installations.
CIRCUTOR, SA reserves the right to modify features or the product manual without prior noti cation.
3
Installation Guide
CONTENTS
SAFETY PRECAUTIONS ���������������������������������������������������������������������������������������������������������������������������������������3 DISCLAIMER ���������������������������������������������������������������������������������������������������������������������������������������������������������� 3 CONTENTS ������������������������������������������������������������������������������������������������������������������������������������������������������������� 4 REVISION LOG �������������������������������������������������������������������������������������������������������������������������������������������������������5 1�- WARRANTY CERTIFICATE FOR THE CANOPIES �����������������������������������������������������������������������������������������6 2�- FORESEEABLE MISUSE ����������������������������������������������������������������������������������������������������������������������������������7 3�- PV2 MODELS ���������������������������������������������������������������������������������������������������������������������������������������������������� 8 4�- COMPONENTS ��������������������������������������������������������������������������������������������������������������������������������������������������9
4�1�- FEET AND WINGS ���������������������������������������������������������������������������������������������������������������������������������� 10 4�2�- BEAMS, PROFILES AND FASTENING OF MODULES ������������������������������������������������������������������������� 11
5�- PREPARATION OF THE INSTALLATION ������������������������������������������������������������������������������������������������������ 12
5�1�- STUDY INTO THE ELECTRICAL PROJECT ������������������������������������������������������������������������������������������12
5�1�1�- STANDARD INSTALLATION WITH RECHARGE POINT IN START FOOT ����������������������������������12 5�1�2�-STANDARD INSTALLATION WITH RECHARGE POINT IN START AND END FOOT �����������������12
5�1�3�- MAJOR INSTALLATION �����������������������������������������������������������������������������������������������������������������13
5�1�4�- INTERNAL CONNECTION OF FEET ����������������������������������������������������������������������������������������������13 5�2�- PREPARATION OF FOOTINGS �������������������������������������������������������������������������������������������������������������14 5�3�- EARTH CONNECTION ����������������������������������������������������������������������������������������������������������������������������� 15 5�4�- ASSEMBLE TEMPLATES ������������������������������������������������������������������������������������������������������������������������15 5�5�- FILLING THE FOOTINGS ������������������������������������������������������������������������������������������������������������������������16 5�6�- REMOVE UPPER TEMPLATE ����������������������������������������������������������������������������������������������������������������� 16
6�- ASSEMBLY OF FEET AND WINGS ���������������������������������������������������������������������������������������������������������������� 17
6�1�- FOOT INSTALLATION (A) ���������������������������������������������������������������������������������������������������������������������17 6�2�- FOOT INSTALLATION (B) ���������������������������������������������������������������������������������������������������������������������18 6�3�- INSTALLATION OF FEET REINFORCEMENT ���������������������������������������������������������������������������������������19 6�4- INSTALLATION OF WINGS (A) ���������������������������������������������������������������������������������������������������������������20 6�5- INSTALLATION OF WINGS (B) ���������������������������������������������������������������������������������������������������������������21 6�6- ALIGNMENT OF THE FEET ���������������������������������������������������������������������������������������������������������������������22
7�- ASSEMBLY OF BEAMS ���������������������������������������������������������������������������������������������������������������������������������� 23
7�1- FITTING OF ANGLES ������������������������������������������������������������������������������������������������������������������������������23 7�2- BEAM ANGLES ����������������������������������������������������������������������������������������������������������������������������������������24 7�3 - FITTING OF BEAMS ������������������������������������������������������������������������������������������������������������������������������25 7�4 - INSTALLATION OF EARTHING POINT �������������������������������������������������������������������������������������������������26
8�- PROFILES AND MODULES ����������������������������������������������������������������������������������������������������������������������������27
8�1 - PREPARATION OF PROFILES �������������������������������������������������������������������������������������������������������������27 8�2 - FITTING OF CENTRAL PROFILES ��������������������������������������������������������������������������������������������������������28 8�3 - FITTING OF SIDE PROFILES ���������������������������������������������������������������������������������������������������������������� 29 8�4 - FASTENING OF MODULES A ����������������������������������������������������������������������������������������������������������������30 8�5 - FASTENING OF MODULES B ����������������������������������������������������������������������������������������������������������������31 8�6 - CONNECTION OF STRINGS ������������������������������������������������������������������������������������������������������������������ 32
9�- FINAL FOUNDATIONS ������������������������������������������������������������������������������������������������������������������������������������ 33 10�- INSTALLATION OF THE CHARGER ������������������������������������������������������������������������������������������������������������34 11�- USAGE AND MAINTENANCE ����������������������������������������������������������������������������������������������������������������������35
11�1 - INSTALLATION ��������������������������������������������������������������������������������������������������������������������������������������� 35
11�1�1�- ASSEMBLY ACCORDING TO MANUFACTURER SPECIFICATIONS ���������������������������������������� 35
11�1�2�- DIFFICULTIES AND VARIATIONS DURING ASSEMBLY ������������������������������������������������������������ 35
11�1�3�- BONDING OF PARTS AND TIGHTENING TORQUE ������������������������������������������������������������������� 35
11�1�4�- FOUNDATIONS, ALIGNMENT AND LEVELLING OF THE CANOPIES �������������������������������������� 35
11�1�5�- LOCATION AND CHARACTERISTICS OF THE INSTALLATION ZONE ������������������������������������� 35 11�2 - USE AND UPKEEP ��������������������������������������������������������������������������������������������������������������������������������36
11�2�1�- STRUCTURAL ELEMENTS MUST NOT BE MODIFIED �������������������������������������������������������������� 36
11�2�2�- USAGE OVERLOAD INDICATED IN THE PROJECT MUST NOT BE EXCEEDED ������������������� 36
11�2�3�- THE ORIGINAL STATUS OF THE ELEMENTS OF THE CANOPY CANNOT BE MODIFIED ���� 36
11�2�4�- AVOID THE CONTACT OF THE STEEL WITH OXIDISING OR AGGRESSIVE ELEMENTS ������36 11�3 - REVISION AND MAINTENANCE ���������������������������������������������������������������������������������������������������������� 37
11�3�1�- GENERAL CONDITIONS �������������������������������������������������������������������������������������������������������������� 37
11�3�2�- REVISION AND MAINTENANCE TASKS ������������������������������������������������������������������������������������� 37
11�3�3�- CASES THAT INVOLVE SPECIAL REVIEWS ������������������������������������������������������������������������������38
12�- MAINTENANCE AND TECHNICAL SERVICE ���������������������������������������������������������������������������������������������� 39
4
Installation Guide
REVISION LOG
Table 1: Revision log�
Date Revision Description
11/18 M233A01-03-18A Initial version
Note : The images of the devices are for illustrative purposes only and may differ from the original device.
5
Installation Guide
1�- WARRANTY CERTIFICATE FOR THE CANOPIES
10 year Warranty for defects in materials or manufacturing aws.
CIRCUTOR hereby guarantees, for a period of 10 years, from the date of delivery to the buyer, that its canopies are free of any defect in their materials or manufacture that hinder their normal operation under proper conditions of usage, installation and maintenance.
If, at any time, during the period of validity of this guarantee, the appearance of defects in their materials or their manufacture occurs, CIRCUTOR undertakes to replace the defective structure.
The guarantees contained in this Certicate will be provided by CIRCUTOR subject to the general terms and conditions expressed below:
Exclusions and Limitations of Guarantees
Those damages and faults established herein will be exempt from the warranty rights whenever these arise from:
1�- Accidents or negligent, improper or unsuitable use. 2�- Failing to respect the installation, usage and maintenance instructions set forth.
CIRCUTOR reserves the right to supply a different model of structure to handle the accepted
warranty claims, for replacement or expansion, in the event that the original model was no longer manufactured.
Admitted usage
This type of canopy is a metallic structure with two basic functions:
To support a cover of photovoltaic solar modules or thermal solar panels, for the production of running or hot water respectively.
To protect motor vehicles, motorcycles, bicycles, people, etc. from the sun and the rain under the cover.
6
Installation Guide
2�- FORESEEABLE MISUSE
This type of canopy is not intended to:
To withstand overloads higher than those indicated in the corresponding certicate of technical characteristics, due to meteorological conditions (snow and wind) of the site and the own weight of the solar panels.
People will not be allowed to climb onto the canopy, with the exception of those who access it to carry out maintenance and assembly tasks. No more than one person with their personal work material (100 kg) may climb onto the canopy.
It is not allowed to cover the sides, front or rear with any type of enclosure that wholly or partially prevents the passage of the wind.
The installation of posters or jutting elements is not allowed, nor in general, any added element that increases the surface exposed to the wind.
Only the assembly of original parts and components supplied by CIRCUTOR is allowed.
CIRCUTOR will not be held liable for any unauthorised modication to the canopy, once the
same has been put into service.
If a wall is installed along the entire length of the canopy, a special study will be required to vary the coefcient of obstruction contemplated in the calculation.
Figure 1: Variation of the obstruction coefcient.
If the canopy is installed in the vicinity of a height change or on a steep wall or mound that increases the height of the canopy above the ground level to more than 3 m in height at the centre point of the roong, a special study will be required owing to the modication of the pressure and suction coefcients considered in the calculation.
7
Installation Guide
3�- PV2 MODELS
Figure 2: PV2 Models�
Table 2: PV2 Models�
Model Length kWp Plazas Feet
PV2-2 5,0 m 4,20 kWp 2 2 PV2-3 8,0 m 6,72 kWp 3 2 PV2-4 10,0 m 8,40 kWp 4 3 PV2-5 13,0 m 10,92 kWp 5 3 PV2-6 15,0 m 12,60 kWp 6 3
PV2-8 20,0 m 16,80 kWp 8 4 PV2-10 25,0 m 21,00 kWp 10 5 PV2-12 30,0 m 25,20 kWp 12 5 PV2-14 35,0 m 29,40 kWp 14 6 PV2-16 40,0 m 33,60 kWp 16 7 PV2-18 45,0 m 37,80 kWp 18 7 PV2-20 50,0 m 42,00 kWp 20 8 PV2-22 55,0 m 46,20 kWp 22 9 PV2-24 60,0 m 50,40 kWp 24 9 PV2-26 65,0 m 54,60 kWp 26 10 PV2-28 70,0 m 58,80 kWp 28 11 PV2-30 75,0 m 63,00 kWp 30 11 PV2-32 80,0 m 67,20 kWp 32 12 PV2-34 85,0 m 71,40 kWp 34 13 PV2-36 90,0 m 75,60 kWp 36 13 PV2-38 95,0 m 79,80 kWp 38 14 PV2-40 100,0 m 84,00 kWp 40 15 PV2-42 105,0 m 88,20 kWp 42 15
8
Installation Guide
4�- COMPONENTS
LD
PPV10APLI
TV10APLI
VI
A
PI
LI
PC
B
VC
LC
PF
C
VF
LI
LD
M
Figure 3: PV2 Components�
9
Installation Guide
4.1.- FEET AND WINGS
2u.
A
4u.
DIN 931
DIN 6923
DIN 934
DIN 9021
M20X130
M10 M24 Zn
M24
M20
M24
(17u.)
(16u.) (24u.)
(4u.)
(26u.)
(8u.)
DIN 603
M10X25
M10X50
(8u.)
(8u.)
M20
(17u.)
2u.
RIGHT VIEW
LEFT VIEW
[M202700000000]
WING ANGLE
[M224700000000]
[M225700000000]
ANGLE BEAM B
ANGLE BANGLE A
[M239700000000]
[M239700000000]
WING START
WING START
[M230700000000]
[M230700000000]
START FOOT
START FOOT
B
RIGHT VIEW
[M26700000000]
CENTRAL WING
4u.
[M202700000000]
WING ANGLE
[M233700000000]
CENTRAL FOOT
[M26700000000]
CENTRAL WING
DIN 931
DIN 6923
DIN 934
DIN 9021
M20X130
M10 M24 Zn
M24
M20
M24
(27u.)
(32u.) (24u.)
(4u.)
(26u.)
(8u.)
DIN 603
M10X25
M10X50
(16u.)
(16u.)
M20
(17u.)
C
2u.
4u.
2u.
RIGHT VIEW
LEFT VIEW
END WING
[M225700000000]
ANGLE BEAM B
[M236700000000]
[M236700000000]
END FOOT
END FOOT
END WING
DIN 931
DIN 6923
DIN 934
DIN 9021
M20X130
M10 M24 Zn
M24
M20
M24
(17u.)
(16u.) (24u.)
(4u.)
(26u.)
(8u.)
DIN 603
M10X25
M10X50
(8u.)
(8u.)
M20
(17u.)
LEFT VIEW
[M226700000000]
ANGLE BEAM C
CENTRAL FOOT
[M233700000000]
[M253700000000]
[M253700000000]
ANGLE BEAM A
[M224700000000]
[M202700000000]
WING ANGLE
10
Installation Guide
4.2.- BEAMS, PROFILES AND FASTENING OF MODULES
Model MODULES BEAM
M103200000002 M109200000002
SCREW
M104200000006 M104200000005 M106200000001 M108A00000000 SCREW
PV2-2 15 4 4 2 16 6 4 48 8 8
PV2-3 24 4 7 2 28 12 4 84 14 14
PV2-4 30 8 8 4 32 12 8 96 16 16
PV2-6 45 8 14 2 56 22 8 168 28 28
PV2-8 60 12 18 4 72 28 12 216 36 36
PV2-10 75 16 22 6 88 34 16 264 44 44
PV2-12 90 16 28 4 11 2 44 16 336 56 56
PV2-14 105 20 32 6 128 50 20 384 64 64
PV2-16 120 24 36 8 144 56 24 432 72 72
PV2-18 135 24 42 6 168 66 24 504 84 84
PV2-20 150 28 46 8 184 72 28 552 92 92
PV2-22 165 32 50 10 200 78 32 600 100 100
PV2-24 180 32 56 8 224 88 32 672 11 2 112
PV2-26 195 36 60 10 240 94 36 720 120 120
PV2-28 210 40 64 12 256 100 40 768 128 128
PV2-30 225 40 70 10 280 110 40 840 140 140
PV2-32 240 44 74 12 296 11 6 44 880 148 148
PV2-34 255 48 78 14 312 122 48 936 156 156
PV2-36 270 48 84 12 336 132 48 1008 168 168
PV2-38 285 52 88 14 352 138 52 1056 176 176
PV2-40 300 56 92 16 368 144 56 1104 184 184
PV2-42 315 56 119 14 476 154 56 1176 238 238
M10
M14
BEAMS
MODULES
PLACKET
11
Installation Guide
5�- PREPARATION OF THE INSTALLATION
5.1.- STUDY INTO THE ELECTRICAL PROJECT
5�1�1�- STANDARD INSTALLATION WITH RECHARGE POINT IN START FOOT
Lowering of strings (DC wiring) per start foot. Power supply to recharging point in start foot (AC wiring).
Figure 4: Standard installation with recharging point in start foot�
5�1�2�-STANDARD INSTALLATION WITH RECHARGE POINT IN START AND END FOOT
Lowering of strings (DC wiring) per start foot. Power supply to recharging point in start and end foot (AC wiring).
Figure 5: Standard installation with recharging point in start and end foot�
12
Installation Guide
5�1�3�- MAJOR INSTALLATION
Lowering of strings (DC wiring) per start and central foot.
Power supply of recharging points in each foot. (AC wiring)
Figure 6: Major installation�
5�1�4�- INTERNAL CONNECTION OF FEET
STRINGS
CONDUCTION OF DC WIRING THROUGH THE BEAMS
EARTH CONNECTION POINT
(PLEASE REFER TO POINT 7.4)
Figure 7: Internal connection of feet�
13
Installation Guide
5.2.- PREPARATION OF FOOTINGS
MAX 10º
300mm MAX
D
D
CASKET
REINFORCED TWIN-LAYER PIPE
-PROJECTION OF A LENGTH OF 6 M APPROXIMATELY FROM CASKET SPLICE FOR THE LOWERING OF STRINGS, DC WIRING.
-IF IT IS ONLY FOR AC WIRING OF THE CHARGER, PROJECTION OF 4 M APPROXIMATELY OF CASKET SPLICE.
LEAVE CABLES IN PLACE
CASKET
FOOTING
FOOTING ALIGNMENT
SPLICE BOX
Figure 8: Preparation of footings�
14
Installation Guide
5.3.- EARTH CONNECTION
ON EACH FOOT
CASKET
FOOT TUBE
Figure 9: Earth connection�
5.4.- ASSEMBLE TEMPLATES
Torque kp·m 71
M24
24x
50
50
500
950
Figure 10: Assembly of templates�
15
Installation Guide
5.5.- FILLING THE FOOTINGS
Figure 11: Filling the footings�
5.6.- REMOVE UPPER TEMPLATE
Figure 12: Remove upper template�
16
Installation Guide
6�- ASSEMBLY OF FEET AND WINGS
6.1.- FOOT INSTALLATION (A)
Torque kp·m 71
M24 D24
4x
4x
PULL PIPES WHEN LIFTING
DO NOT STEP ON TUBES OR PIPES
Figure 13: Foot installation (A)
17
Installation Guide
6.2.- FOOT INSTALLATION (B)
Torque kp·m 71
M24 D24
4x
4x
Figure 14: Foot installation (B)
18
Installation Guide
6.3.- INSTALLATION OF FEET REINFORCEMENT
1x
UPPER VIEW
Figure 15: Installation of foot reinforcement
19
Installation Guide
6.4- INSTALLATION OF WINGS (A)
Torque kp·m 71
M20X130
M20
7x
14x
7x
Figure 16: Installation of wings (A)�
D20
20
Installation Guide
6.5- INSTALLATION OF WINGS (B)
Torque kp·m 71
M20X130
M20
7x
14x
7x
Figure 17: Installation of wings (B)�
D20
21
Installation Guide
6.6- ALIGNMENT OF THE FEET
X
Y
X Y
X
Y
X=Y
Figure 18: Alignment of the feet
22
Installation Guide
7�- ASSEMBLY OF BEAMS
7.1- FITTING OF ANGLES
2x
2x
2x
2x
2x
2x
Figure 19: Fitting of angles�
23
Installation Guide
7.2- BEAM ANGLES
Torque kp·m 71
M20X130
M20
4x
4x
Figure 20: Beam angles�
24
Installation Guide
7.3 - FITTING OF BEAMS
Torque kp·m :3.8
M10X25
M10x50
M10
2x
4x
2x
7.5m
SYMMETRICAL BEAMS
2A+2B
A
B
2B+2A
Figure 21: Fitting of beams�
25
Installation Guide
7.4 - INSTALLATION OF EARTHING POINT
Torque kp·m :3.8
M10X25
M10
1x
1x
INSIDE VIEW OF THE INSTALLATION
FOOT
Figure 22: Installation of earthing point�
26
Installation Guide
8�- PROFILES AND MODULES
8.1 - PREPARATION OF PROFILES
A
Torque kp·m :3.8
M10X25
M10
M14
4x
4x
4x
Figure 23: Preparation of proles A
B
Torque kp·m :3.8
M8X10
M8
1x
1x
Figure 24: Preparation of proles B
27
Installation Guide
8.2 - FITTING OF CENTRAL PROFILES
Torque kp·m :3.8
Figure 25: Fitting of central proles.
28
Installation Guide
8.3 - FITTING OF SIDE PROFILES
M109200000002
Figure 26: Fitting of side proles.
29
Installation Guide
8.4 - FASTENING OF MODULES A
M104200000006
M106200000001
POSITION OF CONNECTION BOX!
PLEASE REFER TO POINT 8�6
Figure 27: Fastening of modules A�
30
Installation Guide
8.5 - FASTENING OF MODULES B
GPV10APLI
TPV10APLI
POSITION OF
CONNECTION BOX!
PLEASE REFER TO
POINT 8�6
Figure 28: Fastening of modules B�
31
Installation Guide
8.6 - CONNECTION OF STRINGS
Distribute the modules according to their connection as per the following scheme:
1
2
2
3
3
4
1
2
3
4
1
2
3
4
DC WIRING CHANNEL THROUGH THE BEAMS AND INSIDE OF THE FOOT
Figure 29: Connection of strings�
32
Installation Guide
9�- FINAL FOUNDATIONS
Concrete/ Hormigón
Figure 30: Final foundations�
33
Installation Guide
10�- INSTALLATION OF THE CHARGER
Figure 31: Installation of the charger�
34
Installation Guide
11�- USAGE AND MAINTENANCE
11.1 - INSTALLATION
Before the assembly of the canopies, the technical management of the works or the engineering company that carries out the installation project must draft a technical project in which the housings (foundations, footings, support structure, etc.) are sized accordingly with the resulting stressed exerted on the canopy due to wind and snow indicated by the regulations applicable to the specic location of the canopy.
11�1�1�- ASSEMBLY ACCORDING TO MANUFACTURER SPECIFICATIONS
The canopies must be assembled following the instructions in this assembly manual. Under no circumstances may parts or pieces be modied, or steps omitted.
11�1�2�- DIFFICULTIES AND VARIATIONS DURING ASSEMBLY
Any damage detected during the assembly, either as a result of the actual process or if any part does not match those described in the manual, must be notied of to the company supplying the structure.
11�1�3�- BONDING OF PARTS AND TIGHTENING TORQUE
All joints of the canopy’s parts must be made with the supplied screws and nuts. Any change of screws and nuts must be communicated and authorised by the manufacturer. The tightening torques of the joints must be checked according to the following specications:
M8 = between 16 and 19 Nm M10 = between 33 and 39 M20 = between 182 and 274 Nm M24 = between 264 and 324 Nm
11�1�4�- FOUNDATIONS, ALIGNMENT AND LEVELLING OF THE CANOPIES
The foundations must be made with the material supplied by the manufacturer and according to the specications described in this manual.
The legs must be aligned and level. In the event that these requirements cannot be met due to the type of installation, please notify the manufacturer to study the situation and behaviour of the canopy.
Any installation made on sloping terrain should be specically studied to ensure the proper functioning of the canopy.
11�1�5�- LOCATION AND CHARACTERISTICS OF THE INSTALLATION ZONE
The canopies have been studied to be installed free of any building or nearby walls. If an adjacent wall is installed, a special study will be required to vary the coefcient of obstruction contemplated in the calculation.
35
Installation Guide
If the canopy is installed in the vicinity of a height change, or on a steep wall or mound that increases the height of the canopy above the grade to more than 3 m in height at the centre point of the roong, a special study will be required owing to the modication of the pressure and suction coefcients considered in the calculation.
11.2 - USE AND UPKEEP
Maintenance is essential for proper service of this canopy. This section details the work to be performed by the owner or a subcontracted company to ensure continuity in the service of the canopy.
11�2�1�- STRUCTURAL ELEMENTS MUST NOT BE MODIFIED
The structural elements that make up the structure: bases, feet, wings and beams must not be modied from their original state without the intervention of a qualied technician.
11�2�2�- USAGE OVERLOAD INDICATED IN THE PROJECT MUST NOT BE EXCEEDED
The overload of use cannot be exceeded without prior consultation with the specialist technician, especially in the case of changes in use. Should these be exceeded, there would be depletion in the structure leading to deformations and breaks. People will not be allowed to climb onto the canopy, with the exception of those who access it to carry out maintenance and assembly tasks. No more than one person with their personal work material (100 kg) may climb onto the canopy.
11�2�3�- THE ORIGINAL STATUS OF THE ELEMENTS OF THE CANOPY CANNOT BE MOD­IFIED
Do not drill or weld in metal proles without consulting a specialist technician. The installation of posters or jutting elements is not allowed, nor in general, any added element that increases the surface exposed to the wind.
11�2�4�- AVOID THE CONTACT OF THE STEEL WITH OXIDISING OR AGGRESSIVE ELE­MENTS
Steel elements should not be exposed to aggressive elements such as urine and accumulations of water in the areas of the feet are to be avoided.
Any abnormal situation that appears in the different structural elements must be notied
of to a trained technician or to the manufacturer�
36
Installation Guide
11.3 - REVISION AND MAINTENANCE
11�3�1�- GENERAL CONDITIONS
The construction management or the engineering company that carry out the project will dene the periods and maintenance actions required for the housing or foundation. It is highly recommended to carry out testing procedures on concrete footings or housings. In each maintenance revision a form sheet must be completed with the following information outlined below:
- Maintenance Company.
- Person who performs the tasks.
- Date of completion of the works.
- Visually reviewed points.
- Damages in the visually reviewed points.
- Points reviewed using gauge key.
- Points that have been retightened due to tension slipping.
- If protective paintwork has been added.
- Remarks.
Maintenance work must be carried out with sufcient trained personnel who are qualied to complete these tasks. The maintenance guidelines must be adjusted and, if necessary, these must be changed periodically according to the conditions of service and the product’s alteration over time.
11�3�2�- REVISION AND MAINTENANCE TASKS
11�3�2�1�- Periodicity: every six months
Visual inspection of the entire canopy, looking for possible damage to the entire structure such as bumps, ssures, deformations, breaks, or possible rust issues. The fastening hardware at the angles between the ag and the belts are points in which special attention must be paid. Any damage will be repaired immediately to avoid possible accidents or lack of service.
Table of minimum visual revisions:
Table 3: Visual revision chart�
Visual revision Appearance Deformation
Base anchor screws
Top layer
Welding base Joint
Screws in the joint of the base and the foot
Point P1
Screws in the joint of the foot and the wing
Screws in the joint of the ag and the angle
Angle
Screw in the joint of the angle and the belts
End contact point between belts and angle
Belts central point
37
Installation Guide
11�3�2�2�- Periodicity: annual
Check all the fastening screws of the sail with a torque wrench (base / foot / wing). Review with normal key of all the screws of the cover (in this case the torque wrench is not necessary). Should it be observed that in each revision there are several screws that are not with the correct tightening torque, it will be necessary to carry out these revisions more frequently and to try to determine the reason why these screws come loose (excessive vibrations, excessive clearances or other causes).
11�3�2�3�- Periodicity: every 3 years
Carrying out a repaint every 3 years with Valentine’s Oxigel Pavonado paint or similar. Should rust be detected resulting from highly corrosive environments, by blows or any other cause, a remediation of the point with rust will be carried out immediately and a product will be applied to provide sufciently accredited protection in the affected area. This periodicity has been determined by the experience of the manufacturer of the paintwork. It is not an exact period and can be reduced or lengthened depending on the climatic conditions of the area where it is located.
11�3�3�- CASES THAT INVOLVE SPECIAL REVIEWS
The maintenance manager or the owner must carry out a damage evaluation in the following scenarios:
• In case of a scale VII earthquake (EMS scale).
• In case of storms whose maximum wind speed exceeds 120 km/h When 50 kg/m2 of accumulated snow is exceeded.
• In case of impact of a vehicle, an evaluation of the possible damages received.
• In all cases where it is noted or suspected that the structure may have some damage, regardless of the cause.
38
Installation Guide
12�- MAINTENANCE AND TECHNICAL SERVICE
In the case of any query in relation to device operation or malfunction, please contact the
CIRCUTOR, SA Technical Support Service.
Technical Assistance Service
Vial Sant Jordi, s/n, 08232 - Viladecavalls (Barcelona) Tel: 902 449 459 ( España) / +34 937 452 919 (outside of Spain) email: sat@circutor.com
39
Installation Guide
CIRCUTOR, SA Vial Sant Jordi, s/n 08232 - Viladecavalls (Barcelona) Tel: (+34) 93 745 29 00 - Fax: (+34) 93 745 29 14 www.circutor.es central@circutor.com
Loading...