Circontrol CCL-PT3 SMART, CCL-PT3 SMART 3G Installation Manual

INSTALLATION MANUAL
CCL-PT3 SMART
CCL-PT3 SMART 3G
ELECTRIC VEHICLES
SMART POST PT3 Installation manual
This document is copyrighted, 2014 by Circontrol, S.A. All rights are reserved. Circontrol, S.A. reserves the right to make improvements to the products described in this manual at any time without notice.
No part of this manual may be reproduced, copied, translated or transmitted in any form or by any means without the prior written permission of the original manufacturer. Information provided in this manual is intended to be accurate and reliable. However, the original manufacturer assumes no responsibility for its use, or for any infringements upon the rights of third parties that may result from its use.
All other product names or trademarks are properties of their respective
owners.
V1.5, April edition 2014
INSTALLATION MANUAL –CCL-PT3 SMART & CCL-PT3 SMART 3G–
CONTENTS
1 PREFACE ............................................................................................................................. 2
2 IMPORTANT SAFETY INSTRUCTIONS .............................................................................. 3
3 PRODUCT OVERVIEW ........................................................................................................ 4
4 COMPONENT PARTS LOCATION ...................................................................................... 5
5 PRODUCT DIMENSIONS ..................................................................................................... 6
6 INSTALLATION .................................................................................................................... 7
6.1 PREREQUISITES ......................................................................................................... 7
6.2 FOUNDATION DRAWING ............................................................................................ 8
6.3 FOUNDATION PROCEDURE ....................................................................................... 9
6.4 ASSEMBLY MAIN BODY ............................................................................................ 16
7 INSERT THE SIM CARD (FOR 3G MODELS) ................................................................... 19
8 ETHERNET CONNECTION ................................................................................................ 21
9 ELECTRICAL INSTALLATION .......................................................................................... 22
10 CLOSING THE UNIT........................................................................................................... 23
11 UNIT VERIFICATION .......................................................................................................... 24
12 TECHNICAL DATA ............................................................................................................. 25
CIRCONTROL, S.A. – Innovació, 3 – 08232 – Viladecavalls (Barcelona)
Tel.: +34 937 362 940 – Fax: +34 937 362 941 1
Web: www.circontrol.com – E-mail: ps-suport@circontrol.com
INSTALLATION MANUAL –CCL-PT3 SMART & CCL-PT3 SMART 3G–
THE FOLLOWING SYMBOLS ARE USED FOR IMPORTANT SAFETY INFORMATION IN THIS
DOCUMENT
The unit must be disconnected from any power source before performing any maintenance, repair or handling of any equipment connections.
Do not modify the unit. If modified, CIRCONTROL will reject all responsibility and the warranty will be void.
Certification
Complies with IEC 61851, Electric vehicle conductive charging system (IEC
61851-1)
Complies with IEC 62196, Plugs, socket-outlets, vehicle couplers and vehicle
inlets -
Conductive charging system (IEC 62196-1 and IEC 62196-3). RFID complies with ISO 14443A
1 PREFACE
This manual provide commissioning information for SMART POST SERIES, which has been designed and tested to allow electric vehicle charging, specified in IEC 61851.
This document has different sections where describes electrical components inside the charge station and a step-by-step installation procedure.
Tel.: +34 937 362 940 – Fax: +34 937 362 941 2
Web: www.circontrol.com – E-mail: ps-suport@circontrol.com
CIRCONTROL, S.A. – Innovació, 3 – 08232 – Viladecavalls (Barcelona)
INSTALLATION MANUAL –CCL-PT3 SMART & CCL-PT3 SMART 3G–
2 IMPORTANT SAFETY INSTRUCTIONS
Read all the instructions before using and install this product. Do not use cables there are not in perfect conditions. Do not use this unit for anything other than electric vehicle charging
Charging modes are expected in IEC 61851-1.
Do not modify this unit. If modified, CIRCONTROL will reject all
responsibility and the warranty will be void.
Comply strictly with current safety regulations according to your
country rules.
Do not make repairs or manipulations with the unit energised. Only trained and qualified personnel should have access to low-
voltage electrical parts inside the device.
Check the installation annually by qualified technician. Remove from service any item that has a fault that could be dangerous
for users (broken plugs, caps that don’t close...).
Use only Circontrol supplied spare parts. Do not use this product if the enclosure or the EV connector is broken,
cracked, open, or shows any other indication of damage.
CIRCONTROL, S.A. – Innovació, 3 – 08232 – Viladecavalls (Barcelona)
Tel.: +34 937 362 940 – Fax: +34 937 362 941 3
Web: www.circontrol.com – E-mail: ps-suport@circontrol.com
INSTALLATION MANUAL –CCL-PT3 SMART & CCL-PT3 SMART 3G–
1. Rear Beacons
2. Charge Status indicator
3. Liquid Cristal Display
4. RFID Reader
5. Vandal doors
6. Plug A – Type 2
7. Plug B – Type 2
8. Electromagnets
9. Base
8
4
3 1 5 6 7
2
9
2
3 PRODUCT OVERVIEW
CIRCONTROL, S.A. – Innovació, 3 – 08232 – Viladecavalls (Barcelona)
Tel.: +34 937 362 940 – Fax: +34 937 362 941 4
Web: www.circontrol.com – E-mail: ps-suport@circontrol.com
INSTALLATION MANUAL –CCL-PT3 SMART & CCL-PT3 SMART 3G–
1. Rear Beacon Plug B (H1)
2. CCL1 Device (U1)
3. Plug A – Meter (AN1)
4. Plug B – Meter (AN2)
5. Plug A – Mode 3 (AM3-1)
6. Plug B – Mode 3 (AM3-2)
7. RFID Reader (B3)
8. LCD Display (H3)
9. Type 2 socket (B2)
10. Heater (R1)
11. MCB Power Supply (Q3)
12. WGS-20 (T3)
13. Power Supply (G1)
14. AC Power terminals
15. Thermostat (G3)
16. Tamper switch (S1)
17. Plug A – Contactor (K1)
18. Plug B – Contactor (K2)
19. Relay power supply (K3)
20. Plug A – MCB (Q1)
21. Plug B – MCB (Q2)
22. Type 2 socket (B1)
23. Plug A Relay
electromagnet (K7)
24. Plug B Relay electromagnet Plug B (K8)
25. CBS-4C RCD (AF1)
26. Beacon led driver (X2.1)
27. Rear beacon Plug A (H2)
28. Beacon led driver
(X1.1)
1 2 4 5 6 7 9
12
13
16
20
21
22
23
24
25
27
17
18 3 19
14 8 10
11
26
28
15
4 COMPONENT PARTS LOCATION
Tel.: +34 937 362 940 – Fax: +34 937 362 941 5
Web: www.circontrol.com – E-mail: ps-suport@circontrol.com
CIRCONTROL, S.A. – Innovació, 3 – 08232 – Viladecavalls (Barcelona)
INSTALLATION MANUAL –CCL-PT3 SMART & CCL-PT3 SMART 3G–
Units specified in mm
5 PRODUCT DIMENSIONS
CIRCONTROL, S.A. – Innovació, 3 – 08232 – Viladecavalls (Barcelona)
Tel.: +34 937 362 940 – Fax: +34 937 362 941 6
Web: www.circontrol.com – E-mail: ps-suport@circontrol.com
INSTALLATION MANUAL –CCL-PT3 SMART & CCL-PT3 SMART 3G–
Material
Qty
Picture
“L Threaded
bar
4 M12 Nuts
8
Center
template
1
Main fixing
structure unit
1
6 INSTALLATION
6.1 PREREQUISITES
Bellow material list is attached with the unit for foundation and installation purpose.
CIRCONTROL, S.A. – Innovació, 3 – 08232 – Viladecavalls (Barcelona)
Tel.: +34 937 362 940 – Fax: +34 937 362 941 7
Web: www.circontrol.com – E-mail: ps-suport@circontrol.com
INSTALLATION MANUAL –CCL-PT3 SMART & CCL-PT3 SMART 3G–
Units specified in mm
6.2 FOUNDATION DRAWING
CIRCONTROL, S.A. – Innovació, 3 – 08232 – Viladecavalls (Barcelona)
Tel.: +34 937 362 940 – Fax: +34 937 362 941 8
Web: www.circontrol.com – E-mail: ps-suport@circontrol.com
INSTALLATION MANUAL –CCL-PT3 SMART & CCL-PT3 SMART 3G–
STEP
ACTION
1
The four “L” threaded bars must be placed and cemented underground in the foundation place as shows bellow figure.
Drawing foundation dimensions are minimum recommended to fix post to the ground, please consider hardness ground conditions.
6.3 FOUNDATION PROCEDURE
CIRCONTROL, S.A. – Innovació, 3 – 08232 – Viladecavalls (Barcelona)
Tel.: +34 937 362 940 – Fax: +34 937 362 941 9
Web: www.circontrol.com – E-mail: ps-suport@circontrol.com
INSTALLATION MANUAL –CCL-PT3 SMART & CCL-PT3 SMART 3G–
2
Once the four “L” threaded bars are undergrounded, the metal template must be mounted, as shown in the image, in order to get the bars completely aligned.
3
When dry, remove the template, and keep the four nuts that must be lowered close to the floor level.
4
Insert the main fixing structure through the lower holes.
ATTENTION!! : Be careful with the position of the base (BACK & FRONT)
due is not symmetrical.
FRONT VIEW
CIRCONTROL, S.A. – Innovació, 3 – 08232 – Viladecavalls (Barcelona)
Tel.: +34 937 362 940 – Fax: +34 937 362 941 10
Web: www.circontrol.com – E-mail: ps-suport@circontrol.com
INSTALLATION MANUAL –CCL-PT3 SMART & CCL-PT3 SMART 3G–
5
Connections wires must be introduced and fixed as shown in the back view image.
6
Adjust the lower four nuts, you can properly level the main structure.
BACK VIEW
Wire Input
CIRCONTROL, S.A. – Innovació, 3 – 08232 – Viladecavalls (Barcelona)
Tel.: +34 937 362 940 – Fax: +34 937 362 941 11
Web: www.circontrol.com – E-mail: ps-suport@circontrol.com
INSTALLATION MANUAL –CCL-PT3 SMART & CCL-PT3 SMART 3G–
7
1. Tight strongly with the appropriate tools, the upper nuts.
2. Check main fixing structure unit has not inclination using a level tool.
CIRCONTROL, S.A. – Innovació, 3 – 08232 – Viladecavalls (Barcelona)
Tel.: +34 937 362 940 – Fax: +34 937 362 941 12
Web: www.circontrol.com – E-mail: ps-suport@circontrol.com
INSTALLATION MANUAL –CCL-PT3 SMART & CCL-PT3 SMART 3G–
8
Disassembly the metal plate from the housing removing the 6 screw.
9
Once the base is tightened, introduce the housing as shown.
CIRCONTROL, S.A. – Innovació, 3 – 08232 – Viladecavalls (Barcelona)
Tel.: +34 937 362 940 – Fax: +34 937 362 941 13
Web: www.circontrol.com – E-mail: ps-suport@circontrol.com
INSTALLATION MANUAL –CCL-PT3 SMART & CCL-PT3 SMART 3G–
10
1. Insert the connection wires through supplied the metal plate.
2. Assembly metal plate screwing with 6 supplied screws and keep original position for all screws.
CIRCONTROL, S.A. – Innovació, 3 – 08232 – Viladecavalls (Barcelona)
Tel.: +34 937 362 940 – Fax: +34 937 362 941 14
Web: www.circontrol.com – E-mail: ps-suport@circontrol.com
INSTALLATION MANUAL –CCL-PT3 SMART & CCL-PT3 SMART 3G–
11
Assembly cable glands (not supplied) in pre-holes position.
12
Assembly supplied cover with 2 screws.
CIRCONTROL, S.A. – Innovació, 3 – 08232 – Viladecavalls (Barcelona)
Tel.: +34 937 362 940 – Fax: +34 937 362 941 15
Web: www.circontrol.com – E-mail: ps-suport@circontrol.com
INSTALLATION MANUAL –CCL-PT3 SMART & CCL-PT3 SMART 3G–
STEP
ACTION
1
After unpack main body, remove 8 screws from rear cover.
2
Assembly main body with two covers plates and the four M8 supplied screws as shown below.
ATTENTION: Do not trap connection wires with main body.
6.4 ASSEMBLY MAIN BODY
CIRCONTROL, S.A. – Innovació, 3 – 08232 – Viladecavalls (Barcelona)
Tel.: +34 937 362 940 – Fax: +34 937 362 941 16
Web: www.circontrol.com – E-mail: ps-suport@circontrol.com
INSTALLATION MANUAL –CCL-PT3 SMART & CCL-PT3 SMART 3G–
3
Install tamper switch and adjust its position with the two screws.
After assembly, check tamper position and adjust push button to position 1
Tamper possible positions
1. Maintenance position
2. Open cover (Alarm on)
3. Normal function
3 2 1
CIRCONTROL, S.A. – Innovació, 3 – 08232 – Viladecavalls (Barcelona)
Tel.: +34 937 362 940 – Fax: +34 937 362 941 17
Web: www.circontrol.com – E-mail: ps-suport@circontrol.com
INSTALLATION MANUAL –CCL-PT3 SMART & CCL-PT3 SMART 3G–
4
The unit is ready to electrical connections described in section nº 8. It is recommended to keep a distance of approximately 40cm of electric wires
before cutting.
5
Proceed with input connections, please see section 8.
40cm
CIRCONTROL, S.A. – Innovació, 3 – 08232 – Viladecavalls (Barcelona)
Tel.: +34 937 362 940 – Fax: +34 937 362 941 18
Web: www.circontrol.com – E-mail: ps-suport@circontrol.com
INSTALLATION MANUAL –CCL-PT3 SMART & CCL-PT3 SMART 3G–
STEP
ACTION
1
Locate Control module CCL1 on top of the charge point.
2
SIM card holder is located at the right side of the CCL1 device.
7 INSERT THE SIM CARD (FOR 3G MODELS)
Please, follow bellow procedure to insert SIM card in CCL1 integrated modem.
CIRCONTROL, S.A. – Innovació, 3 – 08232 – Viladecavalls (Barcelona)
Tel.: +34 937 362 940 – Fax: +34 937 362 941 19
Web: www.circontrol.com – E-mail: ps-suport@circontrol.com
INSTALLATION MANUAL –CCL-PT3 SMART & CCL-PT3 SMART 3G–
3
The SIM card and its contacts can be easily damaged by scratches or
bending, so be careful when handling, inserting or removing the card.
1. Insert the SIM card with the contact surface facing down.
2. The image below shows how it should be done.
CIRCONTROL, S.A. – Innovació, 3 – 08232 – Viladecavalls (Barcelona)
Tel.: +34 937 362 940 – Fax: +34 937 362 941 20
Web: www.circontrol.com – E-mail: ps-suport@circontrol.com
INSTALLATION MANUAL –CCL-PT3 SMART & CCL-PT3 SMART 3G–
CCL1 Device
8 ETHERNET CONNECTION
Charge station can be configured and monitored to establish owner preferences or specific setup using integrated Ethernet communication port installed at the top of the unit of the main controller named as CCL1 device.
This unit is shipped from the factory with default network setting of “DHCP enabled”. It means that the charge station will try to obtain an IP address from a DHCP server available on the network.
CIRCONTROL, S.A. – Innovació, 3 – 08232 – Viladecavalls (Barcelona)
Tel.: +34 937 362 940 – Fax: +34 937 362 941 21
Web: www.circontrol.com – E-mail: ps-suport@circontrol.com
INSTALLATION MANUAL –CCL-PT3 SMART & CCL-PT3 SMART 3G–
25mm
2
25mm
2
25mm
2
25mm
2
25mm
2
L1 L2 L3
9 ELECTRICAL INSTALLATION
- Connect to the 400V AC Three-phase as shown.
- Do not forget to connect the ground cable to the ground terminal.
Recommended cable section is 25 mm
2
CIRCONTROL, S.A. – Innovació, 3 – 08232 – Viladecavalls (Barcelona)
Tel.: +34 937 362 940 – Fax: +34 937 362 941 22
Web: www.circontrol.com – E-mail: ps-suport@circontrol.com
INSTALLATION MANUAL –CCL-PT3 SMART & CCL-PT3 SMART 3G–
STEP
ACTION
1
For the closure of the rear cover the following M8x20 Allen screws & rings are supplied. The two upper screws, with a standard flat ring must be used for the two holes at top of the cover; the six screws equipped with a special sealing ring, must be placed for the holes at the sides.
In order to keep the optimal sealing, must be done alternating from left to right and from up to down screws.
10 CLOSING THE UNIT
CIRCONTROL, S.A. – Innovació, 3 – 08232 – Viladecavalls (Barcelona)
Tel.: +34 937 362 940 – Fax: +34 937 362 941 23
Web: www.circontrol.com – E-mail: ps-suport@circontrol.com
INSTALLATION MANUAL –CCL-PT3 SMART & CCL-PT3 SMART 3G–
11 UNIT VERIFICATION
Once all installation procedure has been performed, check points below:
1. Check each plug is in proper conditions before start operation.
2. Check no abnormal noise appears while unit is charging.
3. Check all beacons indicators are lighting.
CIRCONTROL, S.A. – Innovació, 3 – 08232 – Viladecavalls (Barcelona)
Tel.: +34 937 362 940 – Fax: +34 937 362 941 24
Web: www.circontrol.com – E-mail: ps-suport@circontrol.com
INSTALLATION MANUAL –CCL-PT3 SMART & CCL-PT3 SMART 3G–
CCL-PT3-SMART
AC INPUT
AC Power supply
3P + N + PE
AC Voltage
400VAC +/- 10%
Nominal input current
64 A
Nominal input power
44kW
Frequency
50 / 60 Hz
OUTPUT
PLUG A
PLUG B
Charge system
Mode 3
Mode 3
Sockets/ Plugs
Type 2
Type 2
Lock system
Yes
Maximum output power
22kW
22kW
Maximum output current
32A
32A
Output voltage range
400V
AC
(3P + N + PE)
ELECTRICAL PROTECTIONS
Overcurrent protections
MCB
Safety protection
RCD 30mA auto recovery (class A)
ENERGY METERS
Accuracy class in active energy
Class B – EN50470-3
Accuracy class in reactive energy
Class 2 – EN62053-23
Meter standards
EN62052-11, EN62053-21, EN62053-23, EN61010-1
NETWORK
Ethernet
10/100BaseTX
GENERAL
Enclosure rating
IP54 / IK10
Enclosure material
Stainless steel
Operating temperature
-30 to +45ºC
Operating humidity
To 95% RH Non-condensing
RFID system
ISO / IEC14443A / B
Display
LCD Backlight double line text
Power limit control
Mode 3 PWM control according ISO / IEC 61851-1
Interface protocol
OCPP / XML
Net weight
65Kg
OPTIONAL DEVICES
Mobile communications
3G / GPRS
RCD protection
RCD class B
Overvoltage protection
Transient surge protector
12 TECHNICAL DATA
CIRCONTROL, S.A. – Innovació, 3 – 08232 – Viladecavalls (Barcelona)
Tel.: +34 937 362 940 – Fax: +34 937 362 941 25
Web: www.circontrol.com – E-mail: ps-suport@circontrol.com
C / Innovació, 3
Pol. Ind. Can Mitjans
08232 - Viladecavalls
Barcelona - Spain
Tel: +34 937 362 940
Fax: +34 937 362 941
www.circontrol.com
Loading...