Chemo 7536, 7979 Documents And Technical Information

CHEMO UNI-/MULTI-Tank
CHEMO UNI-/MULTI-Tank 400 l Deutsch 2
D
CHEMO UNI- / MULTI-Tank
GB
UNI- / MULTI-citerne CHEMO
F
I
CHEMO Serbatoio UNI / MULTI Depósito CHEMO UNI / MULTI
E
CZ
Nádrž CHEMO UNI-/MULTI CHEMO UNI-/MULTI-Tank 400 l
DK
CHEMO UNI-/MULTI-paak 400 l
EST
CHEMO UNI-/MULTI-tartály 400 l Magyar 20
H
CHEMO UNI-/MULTI-tank 400 l
N
CHEMO UNI-/MULTI-tank 400 l Nederlands 22
NL
UNI-/MULTI-Tanque CHEMO 400 l Português 23
P
Zbiornik CHEMO UNI/MULTI 400 l Polski 24
PL
CHEMO UNI-/MULTI-tank 400 l
S
SF
CHEMO UNI-/MULTI-Tank 400 l CHEMO UNI/MULTI tank 400 l Slovensko 27
SLO
400
400
l
400
400
400 l
l
l
l
400
l
English 8 Français 14
Italiano 15 Español 16
Česky 17 Dansk 18 Eesti 19
Norsk 21
Svenska 25 Suomi 26
TR
CHEMO UNI/MULTI Tank 400 l
135.0809.246 / 04.07 / Sm CHEMOWERK GmbH
In den Backenländern 5 • D-71384 Weinstadt
Tel. ++49 (0) 71 51/96 36-0 • Fax ++49 (0) 71 51/96 36-98 • www.chemo.de
Türkçe 28
D
CHEMO UNI-/MULTI-Tank 400 l
Tankpapiere und technische Informationen Zulassungs - Nr.: Z-40.21-365
1. Zulassung „Betreiberauszug“ Seite 2 - 6
2. Transport-, Montage- und Betriebsanleitung Seite 7
3. Überwachungserklärung Seite 7
Wichtige Unterlagen für den Betreiber! Bitte sorgfältig aufbewahren!
(Unterlagen sind bei Prüfungen der Tankanlage vorzuzeigen.)
1. Zulassung „Betreiberauszug“
2
D
3
D
4
D
5
D
6
D7GB
2. Transport-, Montage- und Betriebsanleitung
Diese Anleitung gilt für den CHEMO UNI-/MULTI-Tank 400 l gemäß allgemeiner bauaufsichtlicher Zulassung Z-40.21-365.
Die CHEMO UNI-/MULTI-Tanks werden als Einheit mit einer durch eine Schrumpfhaube gehaltenen stoßfes­ten Abdeckung aus wiederverwertbarem Material als Transportschutz ausgeliefert. In der Abdeckung ist auf der Tankseite der Füllstandsanzeiger untergebracht. Die Tanks sind werkseitig mit eingebauter Leckagesonde ausgestattet. Das Fußgestell ist werkseitig schon fest montiert. Der Deckel ist erst am Aufstellort zu entfernen!
In einem Tankstutzen befi nden sich in einer Hülle die Zu- lassung mit Transport-, Montage- und Betriebsanleitung, Überwachungserklärung und Garantieurkunde.
Die Tanks dürfen nur in allseitig geschlossenen Räumen aufgestellt werden.
Ein zusätzlicher Auffangraum ist nicht erforderlich!
Von Feuerungsanlagen (Feuerstellen, Schornsteine, Verbindungsstücke) muss ein Abstand von mindestens 1 m eingehalten werden.
Die Tanks dürfen nicht
a) in Durchgängen und Durchfahrten, b) in Treppenräumen, c) in allgemein zugänglichen Fluren, d) auf Dächern von Wohnhäusern, Krankenhäusern,
Bürohäusern und ähnlichenGebäuden sowie in
deren Dachräumen, e) in Büroräumen, f) in Gast- und Schankräumen
aufgestellt werden.
Die Befüllung der Tanks mit Heizöl oder Dieselkraftstoff darf nur im freien Einlauf ohne festen Anschluss der Befüllleitung erfolgen.
In einen der oberen Stutzen ist der Füllstandsanzeiger einzuführen. Die Verschlusskappe wird zuvor entfernt, die Überwurfmuttern von unter über den Anzeiger gesteckt und die Gewindebuchsen aufgeschraubt. Danach wird der Füllstandsanzeiger in der Art befestigt, dass die Überwurf­mutter auf den Stutzen unter Verwendung der mitgeliefer­ten Dichtung geschraubt wird.
Bei automatischer Entnahme ist für eine ausreichende Belüftung der Tanks zu sorgen, z.B. durch Einsatz eines Be- und Entlüftungspilzes (2"), der in die vorhandene Gewindebuchse eingesetzt werden kann.
Für die Lagerung nicht brennbarer Medien und den dafür vorgeschriebenen Anschluss einer festen Füllleitung gibt es als Zubehör die Überfüllsicherung mit der Best.-Nr.
7330. Für die Lagerung von gebrauchten Schmier-, Hydraulik­oder Wärmeträgerölen gibt es als Zubehör die Leckage­sonde mit der Best.-Nr. 7391.
3. Überwachungserklärung
Überwachungserklärung
für CHEMO UNI- / MULTI-Tank 400 l
aus Polyethylen hoher Dichte und verzinktem Stahl­blech für die drucklose Lagerung von Medien entspre­chend der allgemeinen bauaufsichtlichen Zulassung Z-40.21-365.
Artikel-Nr.: 7536/7979
Behälterinhalt: 400 l
Prüfdruck: 0.3 bar
Zulassungsnummer: Z-40.21-365
Wir bescheinigen, dass der Behälter den Festlegun­gen der allgemeinen bauaufsichtlichen Zulassung entspricht. Die Druck- und Dichtheitsprüfung wurde durchgeführt.
Die Werksachkundigen:
CHEMOWERK GmbH
Die Tanks können auch mit einem festen Anschluss zur automatischen Entnahme mittels Tauchpumpen bzw. Pumpen mit nachfolgendem Druckspeicher angeschlos­sen werden. Die Anlagen sind dann mit einer Sicher­heitsautomatik zu versehen, die eine Heberwirkung ausschließt.
CHEMO UNI-Tank / MULTI-Tank 400 l
Page 2 of the General Construction Inspection Approval no. Z-40.21- 365, Januar y 14, 2005
Tank documents and technical information, Approval No.: Z-40.21-365
1. Approval „OPERATOR EXCERPT“ page 8-12
2. Transport, installation and operating instructions page 13
3. Inspection declaration page 13
Important documents for the operator! Please keep in a safe place!
(Documents are to be presented during inspections of the tank system.)
1. Approval „OPERATOR EXCERPT“
DEUTSCHES INSTITUT FÜR BAUTECHNIK
10829 Berlin, Januar y 14, 2005 Kolonnenstraße 30 L Tel (0 30) 7 87 30 - 345 Fax (0 30) 7 87 30 - 416 Ref. III 16-1.40.21-102- 04
Approval number: Z-40.21-36 5
Applicant: Chemowerk GmbH
Subject of approval: Blown polyethylene (PE-HD) containers with
Type: UNI 400 l
Valid until: January 15, 2010
The subject of approval listed above is hereby granted general construction approval. This general construction approval document comprises eight pages and fi ve annexes with 12 sheets.
(German Institute for Structural Engineering)
An institution of public law
General Construction Inspection Approval
In den Backenländern 5 71384 Weinstadt
integrated sheet steel collection tray 400 l
Seal o
German Institute
for Structural
Engineering
the
f
I. GENER AL REGULATIONS
1
2
3
4
5
6
The General Construction Inspection Approval certifi es that the approved object is suitable and useful in the sense of the construction regula­tions of the German states.
The General Construction Inspection Approval does not replace the permits, permissions, and certifi cations legally required for a construction project.
The General Construction Inspection Approval is granted without affecting the rights of third par ties, in particular private proprietary rights.
Manufacturers and sellers of the approved object must make copies of the General Construction Inspection Approval, available to users of the approved object and point out that the General Construction Inspection Approval must be present at the place the object is used. This provision does not affect the further regulations in the ”Particular Regulations”. If requested, copies of the General Construction Inspection Approval must be made available to the involved authorities.
The General Construction Inspection Approval may be reproduced only in whole. Publication of excerpts requires permission from the German Institute for Structural Engineering. Text and drawings in advertising must not contradict the General Construction Inspection Approval. Translations of the General Construction Inspection Approval must contain the notice: ”This is a translation of the German original document and has not been reviewed by the German Institute for Structural Engineering”.
The General Construction Inspection Approval, is granted subject to revocation. The regulations of the General Construction Inspection Appro­val are subject to subsequent additions and changes, especially when new technical knowledge necessitates them.
Seal of the
man Institute
Ger
for Structural
ineering
g
En
This is a translation of the German original document and has not been reviewed by the German Institute for Structural Engineering.
8
GB
Page 3 of the General Construction Inspection Approval no. Z-40.21- 365, Januar y 14, 2005
II. PARTICULAR REGULATIONS
1 Object of approval and area of application
(1) Object of this General Construction Inspection Approval is factor y-produced containers described in Annex 1, consisting of a polyethylene (PE-HD) interior container produced in a blow moulding process and an external container made of galvanised sheet steel; The containers are manufactured with a capacity of 400 litres. On the top of the containers there are four connection points devices for fi lling, fl ushing with air and de-airing, protection against overfi lling, emptying and fi ll level monitoring. The containers are equipped with a leak detector. The containers are placed on a steel footing structure. (2) The containers may only be placed as single containers within buildings, and not in Zone 0 and 1 areas with risk of explosion. (3) The containers can be utilised for storage at normal pressure of the following liquids:
1. Heating oil EL grade, as in DIN 51 6031
2. Diesel fuel as in DIN 5902
3. Diesel fuel compliant with DIN EN 142143 (biodiesel) (only in the permeation-resistant version of the inner container)
4. Lubricating oils, hydraulic oils, heat transfer oils (Q grade) mixed or unmixed, non-fl ammable or with fl ash points ≥ 100 °C
5. Used lubricating oils, hydraulic oils, thermal oils Q grade, ignition point over 55 °C; operator must be able to prove origin and ignition point.
6. Photographic chemicals, commercial grade, in concentrations for use (new and used) with a density of no more than 1.15 g/cm3
(4) This General Construction Inspection Approval satisfi es
the obligation to obtain a suitability determination for water regulations and the qualifi cation approval under § 19 h of the Water Resources Act.
2 Bestimmungen für die Bauprodukte
2.1 Eigenschaften und Zusammensetzung
2.1.1 Materials
The moulding compounds and materials cited in Annex 2 will be used for manufacture.
2.1.2 Construction drawings
Construction details of the containers must conform to Annexes
1.1 through 1.5.
2.1.3 Stability verifi cation
The containers are stable under prescribed conditions of use up to an operating temperature of 30 °C.
Seal of the
stitute
German In
for Structural
Engineering
1 DIN 51 603-1 September 2003, ”Liquid Fuels, Heating Oils, Part 1:
2 DIN EN 590 March 200 4, ”Fuels for Vehicles, Diesel Fuel, Minimum
3 DIN EN 14214 November 2003; Automotive fuels - Fatty acid methyl
Heating Oils EL Minimum Requirements”
Requirements and Testing Procedures”, German version EN 59 0: 200 4.
esters (FAME) for diesel engines - Requirements and test methods; German version EN 14214:2003
Page 4 of the General Construction Inspection Approval no. Z-40.21- 365, Januar y 14, 2005
2.1.4 Fire behaviour (fl ame resistance) The containers of this General Construction Inspection Approval, consisting of interior and exterior containers, are designed to withstand fl ames in rooms of buildings that meet the requirements for heating and storage rooms for 30 minutes without leaking.
2.1.5 Leak detection
See Sec. 1 (1), also Sec. 5.1.1 (3) for leak detector usage.
2.2 Manufacture, packaging, transport , storage and labelling
2.2.1 Manufacture (1) The container must be manufactured according to the manufacturer’s description fi led with the DIBt.
(2) In addition to the manufacturing description, the containers
must comply with the requirements of Annex 3, Sec. 1.
(3) The containers are permitted to be manufactured in Plant 3
of CHEMOWERK GmbH, 71384 Weinstadt, Germany.
(4) The inner container may be subjected to a fl uorinating
treatment.
2.2.2 Packaging, transport, storage Packaging, transport, and storage must conform to Annex 3, Sec.2.
2.2.3 Labelling (1) The containers must be labelled with the conformity mark in compliance with the conformity directives of the German states. The mark may be used only if the requirements of Sec. 2.3 are fulfi lled. (2) In addition, the manufacturer must label the containers on the outside wall with the following, clearly visible and durable:
5
- Manufacturing number;
- Date of manufacture;
- Volume capacity of the interior container in litres, up to allowed
lling (compliant with Approval Guidelines for Avoidance of Overfi lling „ZG-ÜS“)
- Material (the labelling must indicate the moulding compound
used) for interior and exterior containers.
- The fl uorinated inner container must be labelled for the material
and additionally with the letter combination “CPA”;
5
;
- Allowed operating temperature;
- A notice that operation is at normal pressure;
- A notice ”Outdoor placement not allowed”;
- A notice ”Only for storing substances according to General
Construction Inspection Approval no. Z-40.21-365”.
(3) The fi lling level corresponding to the maximum approved fi lling
volume (see Sec. 5.1.3) must be marked on the level indicator.
2.3 Proof of conformity
2.3.1 Overview (1) Proof that the containers conform to the conditions of this General Construction Inspection Approval is a certifi cate of conformity obtained by the manufacturing plant on the basis of the manufacturer‘s production quality control and regular external monitoring, including a fi rst test of the containers to the standards of the following conditions.
4 Burn test approved by the German Commission on Flammable
Liquids ( DAbF); can be obtained from the German Institute for Structural Engineering (DIBt).
5 Name and company address/location are on record with the DIBt
(German Institute for Structural Engineering).
6 Approval Guidelines for Avoidance of Over fi lling (ZG-ÜS), May 1993,
in the DIBt (German Institute for Structural Engineering) publication ”Approval Guidelines for Container and Pipeline Safety Features”, January 1996
Seal of the
German Institute
for Structural
Engineering
9
Loading...
+ 19 hidden pages