Chauvin Arnoux Green TEST-FTV 100 User Manual

ENGLISH
User’s
manual
Testing instrument for photovoltaic installations
GREEN TEST-FTV 100 English
FOREWORD
Thank you for purchasing this GREEN TEST FTV 100. For best results from your instrument:
read this operating manual carefully
observe the safety precautions
Meanings of the symbols used on the instrument
Selective disposal for the recycling of electric and electronic material required in the European Union. Under directive WEEE 2002/96/EC, this equipment must not be treated as a household waste.
CAUTION - DANGER! Refer to the operating instructions. Failure to correctly observe or perform instructions in this manual preceded by this symbol may result in bodily injury or damage to the device and to the installations.
Compliant with European Union directives.
Device entirely protected by double insulation or reinforced insulation.
USB port
PRECAUTIONS FOR USE
The instructions that follow are mandatory for correct use of the instrument. Failure to comply with these precautions may result in an electric shock, explosion, or fire.
The user is invited to refer to these instructions whenever the symbol appears. Improper use of the instrument impairs its protection functions and may create a hazardous
situation.
When removing and installing the battery, make sure that the test leads, sensors, and power
supply units are disconnected. The instrument must be disconnected and locked off.
Responsibility for the safety of any installation built using this tool lies with the system
assembler.
For your safety, use only the compatible accessories and cables supplied with the instrument,
in conformity with IEC standard 61010-031 (2002). When sensors or accessories having a lower voltage rating and/or category than the device are used, the lower voltage rating and/or category applies to the system so constituted.
Page 2 sur 47
GREEN TEST-FTV 100 English
Before each use, check that the cables, housings, and accessories are in perfect condition.
Any cable, sensor, or accessory of which the insulation is damaged (even partially) must be repaired or scrapped.
Comply with the environmental conditions. We recommend using the personal protection equipment appropriate to the environmental
conditions of use of the instrument.
This tool can be used on class IV installations at voltages (AC or DC) not exceeding 600V
referred to earth (IEC 61010-1) or on category III installations, at voltages not exceeding 1000V. Never use the instrument on networks of which the voltage or category exceeds those mentioned.
Use the instrument only with the mains power supply unit or the battery pack supplied by the
manufacturer. These units include specific safety devices.
Observe the limits of physical protection of the equipment and sensors. Keep your hands away
from unused terminals.
MEASUREMENT CATEGORIES
Definitions of the measurement categories according to EN-61010-1:
CAT I: Measurement category I corresponds to measurements taken on circuits not directly connected to
CAT II: Measurement category II corresponds to measurements taken on circuits directly connected to the
Example: measurements on electrodomestic units, portable tools, and similar devices
CAT III: Measurement category III corresponds to measurements on building installations.
Example: measurements on distribution panels and wiring.
CAT IV: Measurement category IV corresponds to measurements taken at the source of low-voltage
Example: meters and measurements on overvoltage protection devices.
the network.
network.
installations.
REMARKS CONCERNING THIS MANUAL
The information in this manual is subject to change without notice. The manufacturer cannot
be held liable for any errors it may contain.
Great care has been taken in the preparation of this manual, but should you, even so, have
remarks to make, encounter difficulties in using our product, or have questions about it, please get in touch either with your dealer or with us.
Make sure that you fully understand the conditions of use of the product, such as its hardware
and software characteristics and its constraints of use. We cannot be held liable for damage caused by improper use of the device.
Reproduction of this manual or of any part of it without our prior written permission is
forbidden.\
The names of products mentioned in this manual may be the trademarks, registered or not, of
their respective owners.
Page 3 sur 47
GREEN TEST-FTV 100 English
CONTENTS
FOREWORD................................................................................................................. 2
Meanings of the symbols used on the instrument......................................................................................... 2
PRECAUTIONS FOR USE..............................................................................................2
MEASUREMENT CATEGORIES...................................................................................... 3
REMARKS CONCERNING THIS MANUAL ...................................................................... 3
CONTENTS .................................................................................................................. 4
1. INTRODUCTION ...................................................................................................... 6
2. CONTENT OF THE DELIVERY ................................................................................... 6
3. PRESENTATION ...................................................................................................... 7
4. SWITCHING ON/OFF .............................................................................................. 8
5. PREPARING THE SCREEN........................................................................................ 9
6. POWER SUPPLY .................................................................................................... 12
6.1 BATTERY LIFE BETWEEN CHARGES........................................................................ 12
6.2 CHARGING THE BATTERY ..................................................................................... 12
6.3 POWER SUPPLY................................................................................................... 12
7. MENU TREE ........................................................................................................... 13
8. DESCRIPTION OF THE MENUS............................................................................... 16
8.1 USING THE ALPHANUMERIC KEYPAD ..................................................................... 16
8.2 SITE MENU......................................................................................................... 16
8.2.1 NEW SITE DATA ......................................................................................... 16
8.2.2 A LOOK AT THE THEORY.............................................................................. 16
8.2.3 SELECT A SITE ........................................................................................... 17
8.2.4 MODIFY A SITE........................................................................................... 17
8.3 MEASUREMENT MENU.......................................................................................... 17
8.3.1 MEASUREMENT ACQUISITION ...................................................................... 17
8.3.2 MEASUREMENT ACQUIRED........................................................................... 18
8.4 ADJUSTMENTS MENU........................................................................................... 19
8.5 CONFIGURATION ................................................................................................ 20
8.6 REMOTE MEASUREMENT ...................................................................................... 20
8.7 LOCATIONS OF THE MEASUREMENT POINTS ON THE PHOTOVOLTAIC PANELS............ 21
8.8 MEASUREMENT ACQUISITION............................................................................... 22
8.9 LOCATIONS OF THE MEASUREMENT POINTS ON A SINGLE-PHASE INVERTER............. 23
8.10 MEASUREMENT ACQUISITION............................................................................. 24
8.11 CONNECTIONS OF THE MEASUREMENTS OF THE COMPLETE SITE WITH SINGLE-PHASE
OUTPUT................................................................................................................... 25
8.12 MEASUREMENT ACQUISITION............................................................................. 26
8.13 LOCATIONS OF THE MEASUREMENT POINTS ON A THREE-PHASE INVERTER............. 27
8.14 MEASUREMENT ACQUISITION............................................................................. 28
8.15 CONNECTIONS OF THE MEASUREMENTS OF THE COMPLETE SITE WITH THREE-PHASE
OUTPUT................................................................................................................... 29
8.16 MEASUREMENT ACQUISITION............................................................................. 30
Page 4 sur 47
GREEN TEST-FTV 100 English
8.17 MEASUREMENT OF THE COMPLETE SITE IN TWO SEPARATE STAGES ....................... 30
8.18 COMMUNICATION INTERFACE ............................................................................. 31
8.18.1 RS232 INTERFACE - TECHNICAL CHARACTERISTICS.................................... 31
8.18.2 USB INTERFACE - TECHNICAL CHARACTERISTICS ....................................... 31
8.19 "GREEN REPORT" SOFTWARE.............................................................................. 31
8.19.1 GREEN REPORT SOFTWARE INSTALLATION PROCEDURE .............................. 32
8.19.2 FUNCTIONS OF THE GREEN REPORT SOFTWARE ......................................... 32
8.19.2.1 CONFIGURATION..................................................................................................................... 32
8.19.2.2 CONNECTION OF THE INSTRUMENT TO THE PC:............................................................... 32
8.19.2.3 "REPORT".................................................................................................................................. 33
8.19.2.4 "REAL TIME".............................................................................................................................. 33
8.19.2.5 "DATA ACQUIRED"................................................................................................................... 33
8.19.2.6 "INSTALLATIONS" .................................................................................................................... 33
8.19.3 EXAMPLES OF GRAPHS CREATED BY "GREEN REPORT" SOFTWARE ................ 34
9. REPORT ON STATUSES AND MEASUREMENTS ....................................................... 34
10. TECHNICAL CHARACTERISTICS OF THE INSTRUMENT ........................................ 36
11. CHARACTERISTICS OF THE REMOTED MODULE................................................... 37
11.1 PROCEDURE FOR CONNECTION AND CONFIGURATION OF THE REMOTED FTV 100
MODULE .................................................................................................................. 38
12. TECHNICAL CHARACTERISTICS OF THE "BLUETOOTH" COMMUNICATION KIT.... 39
13. TECHNICAL CHARACTERISTICS OF THE "CABLE" KIT ......................................... 40
13.1 PROCEDURE FOR CONNECTION AND CONFIGURATION OF THE "BLUETOOTH" OR
"RS232 CABLE" COMMUNICATION KIT ........................................................................ 40
14. PRODUCING A CABLE USING THE RS232 CONNECTORS PROVIDED WITH THE
OPTIONAL REMOTED FTV 100 MODULE .................................................................... 41
15. TECHNICAL CHARACTERISTICS OF THE PYRANOMETER...................................... 41
15.1 INTRODUCTION ................................................................................................ 41
15.2 OPERATING PRINCIPLE ...................................................................................... 41
15.3 INSTALLATION AND ASSEMBLY OF THE PYRANOMETER.......................................... 42
15.4 TECHNICAL CHARACTERISTICS........................................................................... 43
16. WARRANTY ......................................................................................................... 43
17. MAINTENANCE.................................................................................................... 44
17.1 CLEANING ........................................................................................................ 44
17.2 METROLOGICAL CHECKS.................................................................................... 44
17.3 REPAIRS .......................................................................................................... 44
17.4 REPAIR OUTSIDE WARRANTY.........................................
18. TO ORDER........................................................................................................... 45
E
RREUR
! S
IGNET NON DEFINI
.
Page 5 sur 47
GREEN TEST-FTV 100 English
1. INTRODUCTION
The GREEN TEST FTV 100 is a measuring instrument designed and built to meet the needs of technicians during the installation, testing, certification, and maintenance of photovoltaic systems.
Photovoltaic systems comprise two parts:
A photovoltaic generator, comprising one or more series of photovoltaic panels that generate
a direct current.
The inverter that converts the direct current generated by the panels into an alternating
current that is supplied to the network for use.
The GREEN TEST FTV 100 has three inputs for measurements of the voltage (VDC) and current (IDC) delivered by the photovoltaic generator, making it possible to measure up to three series of solar panels at a time. Depending on the needs of the installation, you may use one input, two, or all three. The other side of the instrument has three inputs for measurements of AC voltages (VAC) and three for measurements of alternating currents (IAC), making possible measurements on one, two, or three phases. Make sure that the voltage and current connections are in phase, to avoid the acquisition of errored measurements.
The measurements available on the GREEN TEST FTV 100:
measurement of solar radiation by pyranometer (up to 2000W/m²); measurement of outdoor temperature using a Pt100 probe (up to 80°C); measurement of the temperature of the solar panels using a Pt100 probe (up to 120°C); calculations of the theoretical power available; measurement of the voltage (1000VDC), of the current (PAC10-FTV current clamps 200ADC,
PAC20-FTV current clamps 1400 ADC) and of the power delivered by the solar panels;
measurement of the voltage (600VAC), of the current (MN-FTV current clamps 200A
FTV current clamps1000A inverter;
calculation of the efficiency of the solar panels with display of the values and highlighting of the
test result;
calculation of the DC/AC energy conversion (inverter) efficiency with display of the values and
highlighting of the test result;
Memory used to store customer data and system measurements;
D43-FTV current clamps 3000AAC) and of the output power of the
AC,
, C107-
A
C
2. CONTENT OF THE DELIVERY
Basic equipment Optional equipment
Description Qty Description
Pyranometer for solar radiation + connecting cable Pt100 probe for the ambient temperature 1 C107-FTV ammeter clamps for measurement
Pt100 probe for the temperature of the panels 1 PAC10-FTV ammeter clamps for
Page 6 sur 47
1 D43-FTV ammeter clamps for measurement of
the alternating current (3000AAC) of the alternating current (1000AAC) measurement of the direct current (200ADC)
GREEN TEST-FTV 100 English
16 17
19
22
20
18
13
14 15
1
2
3
7
8
9
10
11
12
4
5
6
21
MN-FTV ammeter clamps for measurement of the alternating current (200AAC) PAC10-FTV ammeter clamps for measurement of the direct current (200ADC)
3 PAC20-FTV ammeter clamps for
measurement of the direct current (1400ADC)
1 FTV 100 remoted module + 2 male/male
RS232 connectors
Set of 3m leads (red/black) 4 Bluetooth communication kit
(transmitter/receiver)
Pairs of test probes (red/black) 4 15m serial cable with male/male RS232
connector
4.5Ah Li-Ion battery 1 RS232/USB adapter Power supply unit 1 Alligator clips USB cable 1 No. 22 carrying bag Transport accessories 1 Certificate of validation of the instrument 1 CD-ROM containing:
1 Operating manual of the Green Test FTV 100 Green Report V2.5 + instructions UpLoader 2.1 + instructions USB serial driver + instructions
3. PRESENTATION
Page 7 sur 47
GREEN TEST-FTV 100 English
1. input 1: ammeter clamp AAC
2. input 2: ammeter clamp AAC
3. input 3: ammeter clamp AAC
4. input 2: ammeter clamp ADC
5. input 2: ammeter clamp ADC
6. input 3: ammeter clamp ADC
7. input 1: voltage VAC
8. input 2: voltage VAC
9. input 3: voltage VAC
10. input 1: voltage VDC
11. input 2: voltage VDC
12. input 3: voltage VDC
13. ambient temperature probe input
14. pyranometer input
15. solar panel temperature probe input
16. USB serial port (to PC)
17. RS232 serial port –to remoted unit)
18. multi-function alphanumeric keypad having the following keys:
"up" navigation key
ENTER selection validation key
"down" navigation key
On/Off button ESC menu exit key DEL entry deletion key
19. input of external power supply (15V DC, 2A maximum consumed)
20. PWR ON/CHARGE FULL (only when an external power supply is connected); lights during recharging of the internal batteries or when they have reached full charge.
21. BAT Ch (only when an external power supply is connected); lights during the charging of the batteries.
4. SWITCHING ON/OFF
Pressing the button for 1 second switches the instrument on. Pressing the button for 3 seconds when the instrument is on switches it off.
REMARK: Pressing for more than one second when switching on may resulting in faulty lighting of the screen.
If this happens, hold the button down for more than 3 seconds, then switch the instrument back on.
The instrument can operate on battery power alone (without the external supply) if it is adequately charged, or when connected to the power supply unit.
Page 8 sur 47
GREEN TEST-FTV 100 English
1 2 3
11
12 14 13 15
5. PREPARING THE SCREEN
The GREEN TEST FTV 100 has a 5.7" LCD screen that displays all measurements and the results of the efficiency calculations in real time.
SYSTEM 1 POWER [kW]: ]: 7.50 MIN RAD [W/m2]: 600.00
4
5
6
7
8
9
1. IMP: indicates the number of the photovoltaic installation selected
2. POWER [kW]: indicates the nominal power of the photovoltaic installation (value entered by the
3. MIN RAD [W/m²]: indicates the minimum insolation required for the performance calculations
4. ENVIRONMENT MEASURES:
ENVIRONMENT MEASUREMENT
Radiation W/m2: 0.00 environm temp. °C: ---.-­panel temp. °C: ---.-­temp. coeff.: -.--
THEORATICAL AVAIL POWER [kW]: 0.00
DC MEASUREMENT ERROR
V1: - ∗∗∗ - I1: - 37.9A V2: - ∗∗∗ - I2: - 38.1A V3: - ∗∗∗ - I3: - 38.9A
DC POWER [kW]: 0.00
AC MEASURE ERROR
V1: - ∗∗∗ - I1: 0.00A V2: - ∗∗∗ - I2: 0.00A V3: - ∗∗∗ - I3: 0.00A
AC POWER [kW]: 0.00
user).
(see ADJUSTMENTS MENU). The default value is 600 W/m².
Radiation W/m²: indicates the insolation measured by pyranometer (located on the
panels and having the same inclination) (see also the directions for use of the pyranometer).
temp. environm °C: indicates the value of environment temperature measured by a
Pt100 probe.
temp. panels °C: indicates the temperature of the solar panels measured by a
Pt100 probe. temp. coeff.: indicates the panel performance correction parameter. This value changes when the temperature is above the data
entered (NOCT). It is a constant 0.85 when the temperature is between 0°C and
the NOCT (normal operating cell temperature).
INSTALLATION
MEASURE ADJUSTMENT CONFIGURATION REMOTE MEASURE OFF
WARNING
PANEL EFFICIENCY
--.-%
INVERTER EFFICIENCY
--.-%
FUNCTION MENU
Page 9 sur 47
GREEN TEST-FTV 100 English
When it exceeds the NOCT, the coefficient falls below 0.85 and
the panel loses efficiency (see page 34, §15.2).
The variation of the temperature coefficient also depends on the
values entered for Gamma and for NOCT.
REMARK: For all of the atmospheric measurements above, when the screen displays “---,--“ with the text LOST (in red) at bottom right, communication has been broken off between the GREEN TEST instrument and the remoted module. This interruption may be because the batteries of the remoted module are discharged or because the signal has been lost (no Bluetooth link).
5. THEORETICAL AVAILABLE POWER [kW]: theoretical power for an insolation of 1000 W/m² (value entered by the user, see SITE MENU – NEW SITE DATA).
6. DC MEASUREMENTS:
Display blank V1: DC voltage or “- * -“ I1: direct current or -37.9A (-279.3A in 1.4kA version) V2: DC voltage or “- * -“ I2: direct current or -38.1A (-279.8A in 1.4kA version) V3: DC voltage or “- * -“ I3: direct current or -38.9A (-276.2A in 1.4kA version)
- ∗∗∗ -: alert for each individual input (V1, V2, or V3):
No connection to the PV system Voltage < 10VDC DC polarity reversed AC voltage on DC inputs (connection error)
The “- * -” symbol also flashes WARNING is displayed at bottom right of the screen
7. DC POWER [kW]: indicates the measured direct current power from the solar generator.
8. ALTERNATING CURRENT MEASUREMENTS:
Display blank V1: AC voltage or “- * -“ I1: alternating current (2.0A for the 3kA version) V2: AC voltage or “- * -“ I2: alternating current (1.0A for the 3kA version) V3: AC voltage or “- * -“ I3: alternating current (1.1A for the 3kA version)
- ∗∗∗ -: alert for each individual input (V1, V2, or V3):
No connection to the PV system
Voltage < 25VAC
The “- * -” symbol also flashes WARNING is displayed at bottom right of the screen
REMARK: when connecting to the PV system, check that the phases correspond (V1-I1, V2-I2, etc.)
9. AC POWER [kW]: indicates the measured AC output power of the inverter.
10. EFFICIENCY OF PANELS: indicates the efficiency of the photovoltaic generator as a percentage (%), along with all of the test results.
REMARK: if Italian is the language selected for this device, under the provisions of standards applicable in Italy (DM19/02/2007, IEC guide 82-25), the results of the "Good/Bad" tests appear alongside the % efficiencies.
Page 10 sur 47
GREEN TEST-FTV 100 English
In this case:
Measurements
in percentage
(%)
From 85% to
99.9%
From 0% to
<85%
>99.9
TEST
RESULTS
REJECTED Value in percentage and "REJECTED" displayed in steady red
-----
OK
Value in percentage and "OK" displayed in steady green
Flashing red dashes: anomaly, check the measurement parameters (power, current, voltage, insolation) and the
connections of the photovoltaic system
REMARK
11. INVERTER EFFICIENCY indicates the efficiency of the DC/AC conversion as a percentage and displays all checks.
REMARK: if Italian is the language selected for this device, under the provisions of standards applicable in Italy (DM19/02/2007, IEC guide 82-25), the results of the "Good/Bad" tests appear alongside the % efficiencies. In this case:
Measurements in
percentage (%)
From 90% to
99.9%
From 0% to <90%
>99.9
TEST RESULTS
OK
REJECTED
-----
REMARK
Value in percentage and "OK" displayed in steady green
Value in percentage and "REJECTED" displayed in steady red Flashing red dashes: anomaly, check the measurement parameters
(power, current, voltage, insolation) and the connections of the photovoltaic system
12. ERROR: indicates an alert in the following cases:
- Wrong connections between the photovoltaic installation and the FTV 100, in the matching of the AC measurement phases (for example V1-I2, current clamps connected backwards) resulting in a negative AC power reading;
- Wrong connections between the photovoltaic installation and the FTV 100, in the DC measurements part (current clamps connected backwards) resulting in a negative DC power reading.
13. DC CURRENT (current clamps not connected): Because of the great sensitivity of the inputs and their high impedances, the display unit indicates non-zero values. When a clamp is connected, this value can briefly reach (for the 200A clamp) I1 = -37.9A, I2 = -38.1A, I3 = -38.9A or (for the 1.4kA clamp) I1 = -279.3A, I2 = -279.8A, I3 = -276.2A) before falling back to zero. If low values remain displayed for a non-zero direct current when clamps are connected to the instrument, adjust the potentiometer to eliminate the residual magnetization of the ammeter causing the "ZERO" reading (see the instructions in the PAC current clamps manual).
14. AC CURRENT (current clamps not connected): When the instrument is switched on, the alternating current displayed is zero.
15. OFF–ON–LOST INDICATIONS (REMOTE MEASUREMENT MENU) set to point 15, these texts may indicate:
OFF (red): If the remote module is used, it is possible to choose "with" or "without" the panel temperature probe (see ENVIRONMENT MEASUREMENT sub-menu); ON (red): The instrument is connected to the remoted module in the two cases anticipated (see ENVIRONMENT MEASUREMENT sub-menu); LOST (red): interruption of communication between the GREEN TEST instrument and the remoted module, because the batteries of the remoted module are discharged or the signal has been lost (no Bluetooth transmission).
The response time of the instrument for the display of "Lost" is approximately 20 seconds. Communication is restored automatically only if the instrument and the remoted module are off (ON is displayed on the screen instead of LOST).
Page 11 sur 47
GREEN TEST-FTV 100 English
6. POWER SUPPLY
6.1 BATTERY LIFE BETWEEN CHARGES
The battery icon at bottom right on the screen indicates the charge level (proportional to the number of bars of the icon that are visible).
Battery full. Life: approximately 8 hours Battery half-charged. Life: approximately 30 minutes Battery discharged (symbol flashes). Life: approximately 10 minutes
6.2 CHARGING THE BATTERY
The battery is charged with the instrument off, using the mains adapter provided, connected to the corresponding jack. Even with the instrument connected to mains, you cannot charge the battery if the instrument is on. We recommend using only the mains adapter supplied with the instrument. It is specially designed for it and ensures electric safety. If the battery is fully discharged, the charging time is approximately 5 hours.
6.3 POWER SUPPLY
The power supply unit is compatible with voltages between 90V and 260V, at 50Hz. Its internal fuses are not accessible.
REMARK: If the fuses blow, do not attempt to replace them, but send the power supply unit to Customer Service for inspection.
Page 12 sur 47
GREEN TEST-FTV 100 English
7. MENU TREE
When the instrument is powered up, the "FUNCTIONS MENU" is displayed in the bottom right part of the screen.
Page 13 sur 47
GREEN TEST-FTV 100 English
Page 14 sur 47
GREEN TEST-FTV 100 English
Page 15 sur 47
Loading...
+ 32 hidden pages