ChargePoint CT2021 Installation Manual

CT2021
by Coulomb Technologies
®
ChargePoint
®
Networked Charging Station
Coulomb Technologies Inc. 1692 Dell Ave. Campbell, CA 95008-6901 USA US toll free: +1-877-370-3802 www.coulombtech.com www.mychargepoint.net
Installation
Guide
Part Number: 75-001066-01 Revision: 3.0
IMPORTANT SAFETY INSTRUCTIONS SAVE THESE INSTRUCTIONS
This manual contains important instructions that must be followed during installation of a ChargePoint® Networked Charging Station.
Grounding instructions
The ChargePoint® Charging Station must be connected to a grounded, metal, permanent wiring system; or an equipment-grounding conductor is to be run with circuit conductors and connected to the equipment grounding terminal or lead on the Electric Vehicle Supply Equipment (EVSE). Connections to the EVSE shall comply with all local codes and ordinances.
FCC Compliance Statement
This equipment has been tested and found to comply with the limits for a Class A digital device pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment. This equipment generates, uses, and can radiate radio frequency energy and, if not installed and used in accordance with the manufacturer’s instruction manual, may cause harmful interference with radio communications. Operation of this equipment in a residential area is likely to cause harmful interference, in which case, you will be required to correct the interference at your own expense.
Important: Changes or modifications to this product not authorized by Coulomb Technologies, Inc., could affect the EMC compliance and revoke your authority to operate this product.
Exposure to Radio Frequency Energy: The radiated power output of the 802.15.4 radio and cellular modem (optional) in this device is below the FCC radio frequency exposure limits for uncontrolled equipment. This device should be operated with a minimum distance of at least 20 cm between the 802.15.4 and cellular antennas and a person’s body and must not be co-located or operated with any other antenna or transmitter by the manufacturer, subject to the conditions of the FCC Grant.
Safety and compliance
This document provides instructions to install the ChargePoint® Charging Station and should not be used for any other product. Before installing the ChargePoint trained installation expert to ensure compliance with local building practices, climate conditions, safety standards, and state and local codes. The ChargePoint and national codes and standards. The ChargePoint no circumstances will compliance with the information in this manual relieve the user of his/her responsibility to comply with all applicable codes or safety standards. This document describes the most commonly-used installation and mounting scenarios. If situations arise in which it is not possible to perform an installation following the procedures provided in this document, contact Coulomb Technologies. Coulomb Technologies is not responsible for any damages that may occur resulting from custom installations that are not described in this document.
®
Charging Station, you should review this manual carefully and consult with a licensed contractor, licensed electrician and
®
Charging Station should be installed only by a licensed contractor and a licensed electrician and in accordance with all local
®
Charging Station should be inspected by a qualified installer prior to the initial use. Under
No accuracy guarantee
Reasonable effort was made to ensure that the specifications and other information in this manual are accurate and complete at the time of its publication. However, the specifications and other information in this manual are subject to change at any time without prior notice.
Warranty information and disclaimer
Your use of, or modification to, the ChargePoint® Charging Station in a manner in which the ChargePoint® Charging Station is not intended to be used or modified will void the limited warranty. Other than any such limited warranty, the Coulomb products are provided “AS IS,” and Coulomb and its distributors expressly disclaim all implied warranties, including any warranty of design, merchantability, fitness for a particular purposes and non-infringement, to the maximum extent permitted by law.
Limitation of liability
IN NO EVENT SHALL COULOMB TECHNOLOGIES, INC. OR ITS AUTHORIZED DISTRIBUTORS BE LIABLE FOR ANY INDIRECT, INCIDENTAL, SPECIAL, PUNITIVE, OR CONSEQUENTIAL DAMAGES, INCLUDING WITHOUT LIMITATION, LOST PROFI TS, LOST DATA, LOSS OF USE, COST OF COVER, OR LOSS OR DAMAGE TO THE CHARGEPOINT
®
CHARGING STATION, ARISING OUT OF OR RELATING TO THE USE OR INABILITY TO USE THIS MANUAL, EVEN
IF COULOMB TECHNOLOGIES, INC. OR ITS AUTHORIZED DISTRIBUTORS HAVE BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES.
Copyright and trademarks
©2011 Coulomb Technologies, Inc. All rights reserved. This material is protected by the copyright laws of the United States and other countries. It may not be modified, reproduced or distributed without the prior, express written consent of Coulomb Technologies, Inc. CHARGEPOINT is a U.S. registered trademark and service mark of Coulomb Technologies, Inc. All other products or services mentioned are the trademarks, service marks, registered trademarks or registered service marks of their respective owners. Coulomb Technologies has filed several patent applications.
Contents
1Introduction
Before installing stations...........................................................................................................................................1-1
Specifications............................................................................................................................................................. 1-2
Wiring information ....................................................................................................................................................1-3
2 Installing a Bollard Mount
Before you start.......................................................................................................................................................... 2-1
Overview of steps....................................................................................................................................................... 2-1
Step 1 - Check box for correct contents................................................................................................................... 2-2
Step 2 - Remove front panel ..................................................................................................................................... 2-3
Step 3 - Remove mounting pole and base plate from body ................................................................................... 2-4
Step 4 - Install J-Bolts and conduit ...........................................................................................................................2-5
Step 5 - Mount base plate/pole assembly............................................................................................................... 2-6
Step 6 - Install body ...................................................................................................................................................2-7
Step 7 - Connect wires to wiring terminals............................................................................................................... 2-8
Step 8 - Replace front panel ..................................................................................................................................... 2-9
3 Installing the holsters and cable assemblies
Before you start.......................................................................................................................................................... 3-1
Overview of steps....................................................................................................................................................... 3-1
Step 1 - Check boxes for correct contents...............................................................................................................3-2
Step 2 - Attach holsters/cable hangers to body assembly .....................................................................................3-3
Step 3 - Install cable assembly 2..............................................................................................................................3-4
Step 4 - Install the filler panel...................................................................................................................................3-6
Step 5 - Install cable assembly 1..............................................................................................................................3-7
4 Installing the head assembly
Before you start.......................................................................................................................................................... 4-1
Overview of steps....................................................................................................................................................... 4-1
Step 1 - Check box for correct contents................................................................................................................... 4-2
Step 2 - Slide head assembly into body ................................................................................................................... 4-3
Step 3 - Verify that the station operates correctly ...................................................................................................4-4
Step 4 - Secure head assembly and filler panel...................................................................................................... 4-5
Step 5 - Install front cover plates.............................................................................................................................. 4-6
Step 6 - Arrange for station provisioning..................................................................................................................4-7
5 Troubleshooting
The station’s display ..................................................................................................................................................5-1
Understanding error messages.................................................................................................................................5-2
Checking voltages...................................................................................................................................................... 5-6
Appendix A: Limited Product Warranty.................................................................................................................... A-1
i
Introduction
Install FIRST See Chapter 2
Install SECOND See Chapter 3
Install LAST See Chapter 4
Head Assembly
*NOTE: The screws used to mount the holsters are included in the box containing the bollard mount AND in the boxes
containing the holsters. Use those provided in the box containing the bollard mount.
Bollard mount, cable hangers, & mounting accessories*
Cable Assembly 2 and Right Holster
Cable Assembly 1 and Left Holster
This document provides step-by-step instructions on how to install a CT2021 ChargePoint® Charging Station. The CT2021 ships in four boxes:
1
Before installing stations
The instructions provided in this guide assume that the appropriate wiring, circuit protection, and metering is in place at the installation location. Before you install, you must also ensure that the type of modem in each station you are installing is compatible with the type of modem coverage available at the installation site (GPRS or CDMA).
To assist in the process of preparing the installation site, thoroughly review the following documents:
Wiring diagrams (see page 1-3 of this document)
CT2021 Charging Stations Data Sheet (available at www.coulombtech.com by clicking the “Products” link, then the “Library” link)
Mounting template (provided in this document and in the box containing the station’s body)
IMPORTANT: If you are printing the PDF version of the Mounting Template, be sure to print at full
scale using 11” x 17” paper. Verify at least one dimension before using a self-printed template.
NOTE: Prepare the site according to the instructions provided on page 2-5 of this document.
It is also recommended that before you begin installing the CT2021 charging station, you thoroughly review the contents of this document to familiarize yourself with the contents of each box and the required installation steps.
1-1
ChargePoint® Charging Stations
Specifications
Electrical Input
Input Power 7.2 kW (x 2)
Input Voltage 208/240 VAC
Input Current 30 A (x 2)
Input Power Connections Two independent 40 A branch circuits, each providing Line 1 and Line 2. A single protective Earth conductor.
Required Service Panel Breaker 40A double pole breaker (non-GFCI type) on each dedicated circuit
Service Panel GFCI Do not provide external GFCI as it may conflict with internal GFCI (CCID)
Standby Power 7 W typical
Electrical Output
Output Charging Power 7.2 kW (x 2)
Output Voltage 208/240 VAC
Output Current 30 A (x 2)
Output Charging Connector
SAE J1772
Functional Interfaces
Card Reader ISO 15693, 14443
Ground Fault Detection 20 mA CCID with auto retry (15 minute delay, 3 retries)
Plug-Out Detection
Power Measurement 2% @ 15 minute intervals
Local Area Network 2.4 GHz 802.15.4 dynamic mesh network
Wide Area Network Commercial GPRS or CDMA cellular data network
Power terminated per SAE J1772
TM
EV connector on 18’ (5.48 m) cable (x 2)
TM
specification
Safety and Operational Ratings
Safety Compliance UL listed for USA and cUL certified for Canada; Complies with UL 2594, UL 2231-1, UL 2231-2, UL 1998,
UL 991, and NEC Article 625
Surge Protection 6 kV @ 3000 A. In geographic areas subject to frequent thunder storms, supplemental surge protection at
the service panel is recommended.
EMC Compliance FCC Part 15 Class A
Operating Temperature -22°F to 122°F (-30°C to +50°C)
Operating Humidity 95% non-condensing
Enclosure Type 3R
Ter mina l Blo ck Tem pera t ure Rating
Maximum Charging Stations per
802.15.4 Radio Group
Approximate Shipping Weight 98 lbs (44.5 kg)
212°F (100°C)
24 (each station must be within 150 feet “line of sight” of at least one other station)
1-2
Wiring information
#1
208/240 VAC
L1 L2
GND
Input: 208/240 VAC, 60HZ, 30A (X2), 1Ø Use copper condutors only. Input terminal recommended tightening torque:
18.5 in.-lbs (2.1Nm) Input terminal wire size range: 6 to 10 AWG (13mm² to 5.3mm² ) solid / stranded.
SEE INSTALLATION GUIDE.
#2
208/240 VAC
L2 L1
WARNING: Risk of Shock. Two Power Sources.
Disconnect Both Power Sources Before Servicing
AVERTISSEMENT: Risque de choc électrique. Alimentations multiples.
Couper le deux circuits d'alimentation avant intervention.
LEVEL 2 CORE
#2
#1
208/240 VAC
L1 L2
GND
Input: 208/240 VAC, 60HZ, 30A (X2), 1Ø Use copper condutors only. Input terminal recommended tightening torque:
18.5 in.-lbs (2.1Nm) Input terminal wire size range: 6 to 10 AWG (13mm² to 5.3mm² ) solid / stranded.
SEE INSTALLATION GUIDE.
#2
208/240 VAC
L2 L1
WARNING: Risk of Shock. Two Power Sources.
Disconnect Both Power Sources Before Servicing
AVERTISSEMENT: Risque de choc électrique. Alimentations multiples.
Couper le deux circuits d'alimentation avant intervention.
LEVEL 2 CORE
#2
NOTE: Requires two dedicated circuits, each with its own 40 A breaker.
Introduction
1-3
Installing a Bollard Mount
Installer-supplied components:
Before you start
You will need:
®
CT2021 ChargePoint assembly
Three galvanized J-Bolts with matching nuts and washers, must comply with local codes, but must be at least 11
½” (12.7 mm) thread diameter. The length
½” (29.2 cm).
Charging Station body
2
Conduit, minimum diameter of 1 exact measurements of this conduit must comply with local codes.
T25 Pin-in Torx driver
#2 Phillips screwdriver
#2 Slotted screwdriver
Overview of steps
Installing the CT2021 ChargePoint® Charging Station’s body assembly involves a few simple steps:
1. Check box for correct contents (see page 2-2)
2. Remove front panel (see page 2-3)
3. Remove mounting pole and base plate from body
(see page 2-4)
4. Install J-Bolts and conduit (see page 2-5)
5. Mount base plate/pole assembly (see page 2-6)
½” (38 mm). The
6. Install body (see page 2-7)
7. Connect wires to wiring terminals (see page 2-8)
8. Replace front panel (see page 2-9)
These steps are detailed in the remainder of this chapter. When you have completed these steps, you will be ready to install the holster and cable assembly as described in Chapter 3.
2-1
ChargePoint® Charging Stations
CT2021 ChargePoint
®
Networked Charging Station
Installation
Guide
Part Number: 75-00xxxx-01 Revision WORKING DRAFT
Coulomb Technologies Inc. 1692 Dell Ave. Campbell, CA 95008-6901 USA US toll free: +1-877-370-3802 www.coulombtech.com www.mychargepoint.net
by Coulomb Technologies
®
Base plate mounting template
Installation Guide
Front panel
Body
Mounting pole
Base plate
Cable hangers
Front cover plate
Filler panel
Allen wrench
Screws for cable hangers
Screws for holsters
Washers
Step 1 - Check box for correct contents
The CT2021 ChargePoint® Charging Station’s bollard mount assembly ships
in a box containing:
•Body*
Mounting pole*
Base plate*
Front panel*
•Cable hangers (2)
•Front cover plate
Filler panel*
3/32” Allen wrench
Screws for attaching the cable hangers (4)
Screws for attaching the holsters (6)
•Washers (10)
Installation Guide
Base plate mounting template
*Body, mounting pole, base plate, front panel, and filler panel are pre-assembled.
2-2
Step 2 - Remove front panel
Loose the two screws that secure the front panel to the body
Remove the ground wire from its tab
Loosen the two screws on the filler panel and slide upwards to remove
To remove the front panel:
Using a T25 Torx driver, loosen the
Slide the filler panel upward to
Remove the ground wire connector
Use the supplied allen wrench to
Slide the front panel upward to
Installing a Bollard Mount
two captive screws in the filler panel.
remove.
from its tab located on the front panel.
loosen the two screws that fasten the panel to the body.
remove.
2-3
ChargePoint® Charging Stations
Loosen the four set screws to remove the pole
Step 3 - Remove mounting pole and base plate from body
To remove the mounting pole/base plate from the body:
Use the supplied allen wrench to loosen the four set screws (two on each bracket).
Slide the pole out of the brackets.
2-4
Step 4 - Install J-Bolts and conduit
Conduit must extend 12-24” (30-61 cm) above the concrete (check local codes)
J-Bolts must extend at least 2 ½” (6.4 cm) above the concrete and 9” (23 cm) below the concrete
Install J-Bolts and conduit into concrete as illustrated. Use the supplied base plate template to ensure correct alignment.
IMPORTANT!
•The concrete block should measure
24” (61 cm) x 24” (61 cm) x 36” (91 cm) deep. Check local codes to ensure compliance.
The J-Bolts must extend at least
2
½” (6.4 cm) above the concrete
and 9” (23 cm) below the concrete.
The conduit must extend 12” to 24”
(30 to 61 cm) above the concrete, or according to local codes.
Installing a Bollard Mount
Example of template (not to scale):
2-5
ChargePoint® Charging Stations
Adjust these nuts as necessary to ensure the mounting pole is level
Position a level on the mounting pole
Step 5 - Mount base plate/pole assembly
To mount the base plate/pole assembly:
Pull all three wires up through the conduit and the mounting pole.
Place the base plate/mounting pole assembly over the wiring conduit and attach the base plate to the J-Bolts using the installer-supplied nuts and washers as shown.
Adjust the nuts as necessary to ensure the mounting pole is level. When level, tighten the nuts securely.
IMPORTANT! Ensure the base plate/pole assembly is level by adjusting the nuts underneath the base plate.
2-6
Step 6 - Install body
When level, use the supplied allen wrench to tighten all four set screws
To re-install the body:
Slide the body over the mounting pole and base plate.
Ensure the body is level.
Secure the body to the mounting pole by tightening the four set screws using the supplied allen wrench.
IMPORTANT! Ensure the body is firmly aligned to the bottom surface and that no movement (rocking) can take place, even when significant pressure is applied.
Installing a Bollard Mount
2-7
Loading...
+ 33 hidden pages