Coulomb Technologies Inc.
1692 Dell Ave.
Campbell, CA 95008-6901 USA
US toll free: +1-877-370-3802
www.coulombtech.com
www.mychargepoint.net
Installation
Guide
Part Number: 75-001066-01 Revision: 3.0
IMPORTANT SAFETY INSTRUCTIONS
SAVE THESE INSTRUCTIONS
This manual contains important instructions that must be followed during installation of a ChargePoint® Networked Charging Station.
Grounding instructions
The ChargePoint® Charging Station must be connected to a grounded, metal, permanent wiring system; or an equipment-grounding conductor is
to be run with circuit conductors and connected to the equipment grounding terminal or lead on the Electric Vehicle Supply Equipment (EVSE).
Connections to the EVSE shall comply with all local codes and ordinances.
FCC Compliance Statement
This equipment has been tested and found to comply with the limits for a Class A digital device pursuant to Part 15 of the FCC Rules. These limits
are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment. This
equipment generates, uses, and can radiate radio frequency energy and, if not installed and used in accordance with the manufacturer’s
instruction manual, may cause harmful interference with radio communications. Operation of this equipment in a residential area is likely to
cause harmful interference, in which case, you will be required to correct the interference at your own expense.
Important: Changes or modifications to this product not authorized by Coulomb Technologies, Inc., could affect the EMC compliance and revoke
your authority to operate this product.
Exposure to Radio Frequency Energy: The radiated power output of the 802.15.4 radio and cellular modem (optional) in this device is below the
FCC radio frequency exposure limits for uncontrolled equipment. This device should be operated with a minimum distance of at least 20 cm
between the 802.15.4 and cellular antennas and a person’s body and must not be co-located or operated with any other antenna or transmitter
by the manufacturer, subject to the conditions of the FCC Grant.
Safety and compliance
This document provides instructions to install the ChargePoint® Charging Station and should not be used for any other product. Before installing
the ChargePoint
trained installation expert to ensure compliance with local building practices, climate conditions, safety standards, and state and local codes.
The ChargePoint
and national codes and standards. The ChargePoint
no circumstances will compliance with the information in this manual relieve the user of his/her responsibility to comply with all applicable codes
or safety standards. This document describes the most commonly-used installation and mounting scenarios. If situations arise in which it is not
possible to perform an installation following the procedures provided in this document, contact Coulomb Technologies. Coulomb Technologies is
not responsible for any damages that may occur resulting from custom installations that are not described in this document.
®
Charging Station, you should review this manual carefully and consult with a licensed contractor, licensed electrician and
®
Charging Station should be installed only by a licensed contractor and a licensed electrician and in accordance with all local
®
Charging Station should be inspected by a qualified installer prior to the initial use. Under
No accuracy guarantee
Reasonable effort was made to ensure that the specifications and other information in this manual are accurate and complete at the time of its
publication. However, the specifications and other information in this manual are subject to change at any time without prior notice.
Warranty information and disclaimer
Your use of, or modification to, the ChargePoint® Charging Station in a manner in which the ChargePoint® Charging Station is not intended to be
used or modified will void the limited warranty. Other than any such limited warranty, the Coulomb products are provided “AS IS,” and Coulomb
and its distributors expressly disclaim all implied warranties, including any warranty of design, merchantability, fitness for a particular purposes
and non-infringement, to the maximum extent permitted by law.
Limitation of liability
IN NO EVENT SHALL COULOMB TECHNOLOGIES, INC. OR ITS AUTHORIZED DISTRIBUTORS BE LIABLE FOR ANY INDIRECT, INCIDENTAL, SPECIAL,
PUNITIVE, OR CONSEQUENTIAL DAMAGES, INCLUDING WITHOUT LIMITATION, LOST PROFI TS, LOST DATA, LOSS OF USE, COST OF COVER, OR LOSS
OR DAMAGE TO THE CHARGEPOINT
®
CHARGING STATION, ARISING OUT OF OR RELATING TO THE USE OR INABILITY TO USE THIS MANUAL, EVEN
IF COULOMB TECHNOLOGIES, INC. OR ITS AUTHORIZED DISTRIBUTORS HAVE BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES.
Before installing stations...........................................................................................................................................1-1
Wiring information ....................................................................................................................................................1-3
2Installing a Bollard Mount
Before you start.......................................................................................................................................................... 2-1
Overview of steps....................................................................................................................................................... 2-1
Step 1 - Check box for correct contents................................................................................................................... 2-2
Step 2 - Remove front panel ..................................................................................................................................... 2-3
Step 3 - Remove mounting pole and base plate from body ................................................................................... 2-4
Step 4 - Install J-Bolts and conduit ...........................................................................................................................2-5
Step 5 - Mount base plate/pole assembly............................................................................................................... 2-6
Step 6 - Install body ...................................................................................................................................................2-7
Step 7 - Connect wires to wiring terminals............................................................................................................... 2-8
Step 8 - Replace front panel ..................................................................................................................................... 2-9
3Installing the holsters and cable assemblies
Before you start.......................................................................................................................................................... 3-1
Overview of steps....................................................................................................................................................... 3-1
Step 1 - Check boxes for correct contents...............................................................................................................3-2
Step 2 - Attach holsters/cable hangers to body assembly .....................................................................................3-3
Before you start.......................................................................................................................................................... 4-1
Overview of steps....................................................................................................................................................... 4-1
Step 1 - Check box for correct contents................................................................................................................... 4-2
Step 2 - Slide head assembly into body ................................................................................................................... 4-3
Step 3 - Verify that the station operates correctly ...................................................................................................4-4
Step 4 - Secure head assembly and filler panel...................................................................................................... 4-5
Step 5 - Install front cover plates.............................................................................................................................. 4-6
Step 6 - Arrange for station provisioning..................................................................................................................4-7
5Troubleshooting
The station’s display ..................................................................................................................................................5-1
This document provides step-by-step instructions on how to install a CT2021 ChargePoint® Charging
Station. The CT2021 ships in four boxes:
1
Before installing stations
The instructions provided in this guide assume that the appropriate wiring, circuit protection, and
metering is in place at the installation location. Before you install, you must also ensure that the type of
modem in each station you are installing is compatible with the type of modem coverage available at the
installation site (GPRS or CDMA).
To assist in the process of preparing the installation site, thoroughly review the following documents:
•Wiring diagrams (see page 1-3 of this document)
•CT2021 Charging Stations Data Sheet (available at www.coulombtech.com by clicking the “Products”
link, then the “Library” link)
•Mounting template (provided in this document and in the box containing the station’s body)
IMPORTANT: If you are printing the PDF version of the Mounting Template, be sure to print at full
scale using 11” x 17” paper. Verify at least one dimension before using a self-printed template.
NOTE: Prepare the site according to the instructions provided on page 2-5 of this document.
It is also recommended that before you begin installing the CT2021 charging station, you thoroughly
review the contents of this document to familiarize yourself with the contents of each box and the
required installation steps.
1-1
ChargePoint® Charging Stations
Specifications
Electrical Input
Input Power7.2 kW (x 2)
Input Voltage208/240 VAC
Input Current30 A (x 2)
Input Power ConnectionsTwo independent 40 A branch circuits, each providing Line 1 and Line 2. A single protective Earth conductor.
Required Service Panel Breaker40A double pole breaker (non-GFCI type) on each dedicated circuit
Service Panel GFCIDo not provide external GFCI as it may conflict with internal GFCI (CCID)
Standby Power7 W typical
Electrical Output
Output Charging Power7.2 kW (x 2)
Output Voltage208/240 VAC
Output Current30 A (x 2)
Output Charging Connector
SAE J1772
Functional Interfaces
Card ReaderISO 15693, 14443
Ground Fault Detection20 mA CCID with auto retry (15 minute delay, 3 retries)
Plug-Out Detection
Power Measurement2% @ 15 minute intervals
Local Area Network2.4 GHz 802.15.4 dynamic mesh network
Wide Area NetworkCommercial GPRS or CDMA cellular data network
Power terminated per SAE J1772
TM
EV connector on 18’ (5.48 m) cable (x 2)
TM
specification
Safety and Operational Ratings
Safety ComplianceUL listed for USA and cUL certified for Canada; Complies with UL 2594, UL 2231-1, UL 2231-2, UL 1998,
UL 991, and NEC Article 625
Surge Protection6 kV @ 3000 A. In geographic areas subject to frequent thunder storms, supplemental surge protection at
the service panel is recommended.
EMC ComplianceFCC Part 15 Class A
Operating Temperature-22°F to 122°F (-30°C to +50°C)
Operating Humidity95% non-condensing
EnclosureType 3R
Ter mina l Blo ck Tem pera t ure
Rating
Maximum Charging Stations per
802.15.4 Radio Group
Approximate Shipping Weight98 lbs (44.5 kg)
212°F (100°C)
24 (each station must be within 150 feet “line of sight” of at least one other station)
18.5 in.-lbs (2.1Nm)
Input terminal wire size range:
6 to 10 AWG (13mm² to 5.3mm² ) solid / stranded.
SEE INSTALLATION GUIDE.
#2
208/240 VAC
L2 L1
WARNING: Risk of Shock. Two Power Sources.
Disconnect Both Power Sources Before Servicing
AVERTISSEMENT: Risque de choc électrique. Alimentations multiples.
Couper le deux circuits d'alimentation avant intervention.
LEVEL 2 CORE
#2
NOTE: Requires two dedicated circuits, each with its own 40 A breaker.
Introduction
1-3
Installing a Bollard Mount
Installer-supplied components:
Before you start
You will need:
®
•CT2021 ChargePoint
assembly
•Three galvanized J-Bolts with matching nuts and
washers,
must comply with local codes, but must be at least
11
½” (12.7 mm) thread diameter. The length
½” (29.2 cm).
Charging Station body
2
•Conduit, minimum diameter of 1
exact measurements of this conduit must comply
with local codes.
•T25 Pin-in Torx driver
•#2 Phillips screwdriver
•#2 Slotted screwdriver
Overview of steps
Installing the CT2021 ChargePoint® Charging Station’s
body assembly involves a few simple steps:
1. Check box for correct contents (see page 2-2)
2. Remove front panel (see page 2-3)
3. Remove mounting pole and base plate from body
(see page 2-4)
4. Install J-Bolts and conduit (see page 2-5)
5. Mount base plate/pole assembly (see page 2-6)
½” (38 mm). The
6. Install body (see page 2-7)
7. Connect wires to wiring terminals (see page 2-8)
8. Replace front panel (see page 2-9)
These steps are detailed in the remainder of this chapter. When you have completed these steps, you will
be ready to install the holster and cable assembly as described in Chapter 3.
2-1
ChargePoint® Charging Stations
CT2021
ChargePoint
®
Networked Charging Station
Installation
Guide
Part Number: 75-00xxxx-01 Revision WORKING DRAFT
Coulomb Technologies Inc.
1692 Dell Ave.
Campbell, CA 95008-6901 USA
US toll free: +1-877-370-3802
www.coulombtech.com
www.mychargepoint.net
by Coulomb Technologies
®
Base plate
mounting
template
Installation Guide
Front
panel
Body
Mounting
pole
Base plate
Cable hangers
Front
cover
plate
Filler
panel
Allen
wrench
Screws for cable hangers
Screws for holsters
Washers
Step 1 - Check box for correct contents
The CT2021 ChargePoint® Charging
Station’s bollard mount assembly ships
in a box containing:
•Body*
•Mounting pole*
•Base plate*
•Front panel*
•Cable hangers (2)
•Front cover plate
•Filler panel*
•3/32” Allen wrench
•Screws for attaching the cable
hangers (4)
•Screws for attaching the
holsters (6)
•Washers (10)
•Installation Guide
•Base plate mounting template
*Body, mounting pole, base plate, front panel,
and filler panel are pre-assembled.
2-2
Step 2 - Remove front panel
Loose the two screws
that secure the front
panel to the body
Remove the
ground wire
from its tab
Loosen the two
screws on the
filler panel and
slide upwards to
remove
To remove the front panel:
•Using a T25 Torx driver, loosen the
•Slide the filler panel upward to
•Remove the ground wire connector
•Use the supplied allen wrench to
•Slide the front panel upward to
Installing a Bollard Mount
two captive screws in the filler
panel.
remove.
from its tab located on the front
panel.
loosen the two screws that fasten
the panel to the body.
remove.
2-3
ChargePoint® Charging Stations
Loosen the
four set
screws to
remove the
pole
Step 3 - Remove mounting pole and base plate from body
To remove the mounting pole/base
plate from the body:
•Use the supplied allen wrench to
loosen the four set screws (two on
each bracket).
•Slide the pole out of the brackets.
2-4
Step 4 - Install J-Bolts and conduit
Conduit must extend
12-24” (30-61 cm) above
the concrete (check local
codes)
J-Bolts must
extend at least
2 ½” (6.4 cm)
above the
concrete and
9” (23 cm)
below the
concrete
Install J-Bolts and conduit into concrete
as illustrated. Use the supplied base
plate template to ensure correct
alignment.
IMPORTANT!
•The concrete block should measure
24” (61 cm) x 24” (61 cm) x
36” (91 cm) deep. Check local
codes to ensure compliance.
•The J-Bolts must extend at least
2
½” (6.4 cm) above the concrete
and 9” (23 cm) below the concrete.
•The conduit must extend 12” to 24”
(30 to 61 cm) above the concrete,
or according to local codes.
Installing a Bollard Mount
Example of template (not to scale):
2-5
ChargePoint® Charging Stations
Adjust these nuts as
necessary to ensure
the mounting pole is
level
Position a
level on the
mounting
pole
Step 5 - Mount base plate/pole assembly
To mount the base plate/pole
assembly:
•Pull all three wires up through the
conduit and the mounting pole.
•Place the base plate/mounting
pole assembly over the wiring
conduit and attach the base plate
to the J-Bolts using the
installer-supplied nuts and washers
as shown.
•Adjust the nuts as necessary to
ensure the mounting pole is level.
When level, tighten the nuts
securely.
IMPORTANT! Ensure the base
plate/pole assembly is level by
adjusting the nuts underneath the base
plate.
2-6
Step 6 - Install body
When level, use the
supplied allen
wrench to tighten all
four set screws
To re-install the body:
•Slide the body over the
mounting pole and base plate.
•Ensure the body is level.
•Secure the body to the
mounting pole by tightening
the four set screws using the
supplied allen wrench.
IMPORTANT! Ensure the
body is firmly aligned to the bottom
surface and that no movement
(rocking) can take place, even
when significant pressure is
applied.
Installing a Bollard Mount
2-7