ChargePoint CT1000 series, CT1001, CT1002, CT1003 Installation Manual

CT1000 Family
by Coulomb Technologies
®
®
ChargePoint
CT1001 Bollard Mount CT1002 Pole Mount CT1003 Wall Mount
Networked Charging Stations
Installation
Guide
Par t Number : 75- 001010-01 Revision 1.0
IMPORTANT SAFETY INSTRUCTIONS SAVE THESE INSTRUCTIONS
This manual contains important instructions that must be followed during installation of a ChargePoint® Networked Charging Station. Install using 2mm (12AWG) or larger copper conductors rated for at least 75°C.
Grounding instructions
The ChargePoint® Networked Charging Station must be connected to a grounded, metal, permanent wiring system; or an equipment-grounding conductor is to be run with circuit conductors and connected to the equipment grounding terminal or lead on the Electric Vehicle Supply Equipment (EVSE). Connections to the EVSE shall comply with all local codes and ordinances.
FCC Compliance Statement
This equipment has been tested and found to comply with the limits for a Class A digital device pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment. This equipment generates, uses, and can radiate radio frequency energy and, if not installed and used in accordance with the manufacturer’s instruction manual, may cause harmful interference with radio communications. Operation of this equipment in a residential area is likely to cause harmful interference, in which case, you will be required to correct the interference at your own expense.
Important: Changes or modifications to this product not authorized by Coulomb Technologies, Inc., could affect the EMC compliance and revoke your authority to operate this product.
Exposure to Radio Frequency Energy: The radiated power output of the Zigbee radio and cellcular modem (optional) in this device is below the FCC radio frequency exposure limits for uncontrolled equipment. This device should be operated with a minimum distance of at least 20 cm between the Zigbee and Cellular antennas and a person’s body and must not be co-located or operated with any other antenna or transmitter by the manufacturer, subject to the conditions of the FCC Grant.
Safety and compliance
This document provides instructions to install the ChargePoint® Networked Charging Station and should not be used for any other product. Before installing the ChargePoint
electrician and trained installation expert to ensure compliance with local building practices, climate conditions, safety standards, and state and local codes.
The ChargePoint
®
all local and national codes and standards. The ChargePoint initial use. Under no circumstances will compliance with the information in this manual relieve the user of his/her responsibility to comply with all applicable codes or safety standards.
®
Networked Charging Station, you should review this manual carefully and consult with a licensed contractor, licensed
Networked Charging Station should be installed only by a licensed contractor and a licensed electrician and in accordance with
®
Networked Charging Station should be inspected by a qualified installer prior to the
No accuracy guarantee
Reasonable effort was made to ensure that the specifications and other information in this manual are accurate and complete at the time of its publication. However, the specifications and other information in this manual are subject to change at any time without prior notice.
Warranty information and disclaimer
Your use of, or modification to, the ChargePoint® Networked Charging Station in a manner in which the ChargePoint® Networked Charging Station is not intended to be used or modified will void the limited warranty. Other than any such limited warranty, the Coulomb products are provided “AS IS,” and Coulomb and its distributors expressly disclaim all implied warranties, including any warranty of design, merchantability, fitness for a particular purposes and non-infringement, to the maximum extent permitted by law.
Limitation of liability
IN NO EVENT SHALL COULOMB TECHNOLOGIES, INC. OR ITS AUTHORIZED DISTRIBUTORS BE LIABLE FOR ANY INDIRECT, INCIDENTAL, SPECIAL, PUNITIVE, OR CONSEQUENTIAL DAMAGES, INCLUDING WITHOUT LIMITATION, LOST PROFITS, LOST
DATA, LOSS OF USE, COST OF COVER, OR LOSS OR DAMAGE TO THE CHARGEPOINT
®
NETWORKED CHARGING STATION, ARISING OUT OF OR RELATING TO THE USE OR INABILITY TO USE THIS MANUAL, EVEN IF COULOMB TECHNOLOGIES, INC. OR ITS AUTHORIZED DISTRIBUTORS HAVE BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES.
Copyright and Trademarks
©2009 Coulomb Technologies, Inc. All rights reserved. This material is protected by the copyright laws of the United States and other countries. It may not be modified, reproduced or distributed without the prior, express written consent of Coulomb Technologies, Inc. CHARGEPOINT is a U.S. registered trademark and service mark of Coulomb Technologies, Inc. All other products or services mentioned are the trademarks, service marks, registered trademarks or registered service marks of their respective owners. Coulomb Technologies has several patents filed.
Contents
1Introduction
Before installing stations...........................................................................................................................................1-1
Specifications............................................................................................................................................................. 1-2
Wiring diagram (to accommodate future upgrade to a CT2000 or CT2100)........................................................ 1-3
Wiring diagram (CT1000 only) .................................................................................................................................. 1-4
2 Installing a Bollard Mount
Before you start.......................................................................................................................................................... 2-1
Overview of steps....................................................................................................................................................... 2-1
Step 1 - Check box for correct contents ..................................................................................................2-2
Step 2 - Remove front panel ....................................................................................................................2-3
Step 3 - Remove body casing...................................................................................................................2-4
Step 4 - Install J-Bolts and conduit .......................................................................................................... 2-5
Step 5 - Mount base plate/pole assembly .............................................................................................. 2-6
Step 6 - Install body casing.......................................................................................................................2-7
Step 7 - Connect wires to wiring terminals..............................................................................................2-8
Step 8 - Replace front panel..................................................................................................................... 2-9
3 Installing a Pole Mount
Before you start.......................................................................................................................................................... 3-1
Overview of steps....................................................................................................................................................... 3-1
Step 1 - Check box for correct contents ..................................................................................................3-2
Step 2 - Prepare body assembly for mounting........................................................................................3-3
Step 3 - Drill hole in pole .......................................................................................................................... 3-4
Step 4 - Strap body assembly to pole ......................................................................................................3-5
Step 5 - Connect wires to wiring terminals..............................................................................................3-6
4 Installing a Wall Mount
Before you start.......................................................................................................................................................... 4-1
Overview of steps....................................................................................................................................................... 4-1
Step 1 - Check box for correct contents ..................................................................................................4-2
Step 2 - Attach bracket to wall ................................................................................................................. 4-3
Step 3 - Drill holes in body assembly.......................................................................................................4-5
Step 4 - Attach body assembly to wall bracket .......................................................................................4-6
Step 5 - Attach coupler and connect conduit..........................................................................................4-7
Step 6 - Connect wires to wiring terminals..............................................................................................4-8
5 Installing the head assembly
Before you start.......................................................................................................................................................... 5-1
Overview of steps....................................................................................................................................................... 5-1
Step 1 - Check box for correct contents ..................................................................................................5-2
Step 2 - Slide head assembly into body .................................................................................................. 5-3
Step 3 - Secure head assembly ............................................................................................................... 5-4
i
Introduction
This document describes how to install any ChargePoint® Networked Charging Station in the CT1000 family. It includes step-by-step instructions for installing the body assembly for the following stations:
CT1001 Bollard Mount (see Chapter 2)
CT1002 Pole Mount (see Chapter 3)
CT1003 Wall Mount (see Chapter 4)
After you install the body assembly, you will be ready to install the head assembly. The head assembly ships in a separate box and is identical for each type of station. The procedure you follow to install a head assembly is also the same for each type of station. See Chapter 5.
1
Before installing stations
The instructions provided in this guide assume that the appropriate wiring, circuit protection, and metering is in place at the installation location. Before you install, you must also ensure that the type of modem in each station you are installing is compatible with the type of modem coverage available at the installation site (CDMA or GPRS).
To assist in the process of preparing the installation site, thoroughly review the following documents:
wiring diagrams (provided on pages 3 and 4 of this document)
®
CT1000 and CT2000 ChargePoint
Assessing Wireless Coverage for a Proposed Installation Site*
Base Plate Template (for Bollard Mount charging stations)*
IMPORTANT: If you are printing the PDF version of the Base Plate Template, be sure to print at
1:1 scale.
Note: If you are installing a Bollard Mount charging station, you may want to prepare the site by following the instructions in “Step 4 - Install J-Bolts and conduit” on page 2-5 of this document.
®
•ChargePoint
*These documents are available from Coulomb Technologies.
It is also recommended that before you begin installing charging stations, you thoroughly review the contents of this document to familiarize yourself with the required installation steps.
Network Service Card Tutorial for Networked Charging Stations*
Networked Charging Stations Data Sheet*
1-1
ChargePoint® Networked Charging Stations
Specifications
Charging connection: NEMA 5-20
AC charging power output: 1.9kW (120V at 16A)
AC power input: 120V 16A
Recommended service panel breaker: 20A on dedicated circuit
Recommended GFCI: Do not provide GFCI at service panel as it can trip before the internal GFCI
Integrated hardware GFCI: 5mA CCID with auto retry (15 minute delay, 3 tries)
EMI compliance: FCC Part 15 Class A
Operating temperature: -22°F to 122°F (-30°C to +50°C)
Operating humidity: Up to 95%
Voltage and current rating: 120VAC, 16A
Terminal block temperature rating: 212°F (100°C)
Approximate shipping weight: Bollard Mount - 50 lbs (23 kg), Pole Mount - 30 lbs (14 kg), Wall Mount - 33 lbs (15 kg).
Outdoor rated: NEMA 3R per NEMA250-1997
Safety compliance: CSA certified; GFCI per UL 2231-1 and -2; meets UL 2202; NEC Article 625 compliant
Surge protection: 6kV @ 3000A. In geographic areas subject to frequent thunder storms supplemental surge protection at service panel is recommended.
1-2
Introduction
text
40A
Breaker
40A
Breaker
20A
Breaker
Neutral
Ground
L2 L1
N
Feeder Lines
Main Breaker
100A
CT2000
Power Plate
NL2L1L3G
To CT2000
Pilot Assy
To CT2000 Head Assy
Breaker
Panel
Conduit
CT2000
Electric Meter
N
N L2 L1
L3
L3L2 L1
L3
Note: All references to CT2000 also apply to the CT2100
Wiring diagram (to accommodate future upgrade to a CT2000 or CT2100)
The wiring shown below is recommended for installations that expect to upgrade from a CT1000 to a CT2000 or CT2100 charging station.
1-3
ChargePoint® Networked Charging Stations
40A
Breaker
40A
Breaker
20A
Breaker
Neutral
Ground
L2 L1
N
Feeder Lines
Main Breaker
100A
CT1000
Power Plate
LGN
To CT1000
Assembly
Breaker
Panel
Conduit
CT1000
Electric Meter
N
N L2 L1
Not Used
L3
L2 L1
L3
L3
Future
Use
Wiring diagram (CT1000 only)
The wiring shown below is recommended for installations that do not expect to upgrade from a CT1000 to a CT2000 charging station.
1-4
Installing a Bollard Mount
INSTALLER SUPPLIED COMPONENTS:
Before you start
You will need:
®
CT1001 ChargePoint body assembly
Networked Charging Station
2
3 J-Bolts with matching nuts and washers: up to (12.7 mm) thread diameter, length must comply with local codes
½” (38 mm) conduit
•1
#2 Phillips screwdriver
#2 Slotted screwdriver
Overview of steps
Installing the CT1001 ChargePoint® Networked Charging Station’s body assembly involves a few simple steps:
1. Check box for correct contents (see page 2-2)
2. Remove front panel (see page 2-3)
3. Remove body casing (see page 2-4)
4. Install J-Bolts and conduit (see page 2-5)
5. Mount base plate/pole assembly (see page 2-6)
6. Install body casing (see page 2-7)
½
7. Connect wires to wiring terminals (see page 2-8)
8. Replace front panel (see page 2-9)
These steps are detailed in the remainder of this chapter. When you have completed these steps, you will be ready to install the head assembly as described in Chapter 5, Installing the head assembly.
2-1
ChargePoint® Networked Charging Stations
CT1000 Family ChargePoint
®
Networked Charging Stations
CT1001 Bollard Mount CT1002 Pole Mount CT1003 Wall Mount
Installation
Guide
Part Number: 75-00XXXX-01 Revision 1.0
Coulomb Technologies Inc. 1692 Dell Ave. Campbell, CA 95008-6901 USA US toll free: +1-877-370-3802 www.coulombtech.com www.mychargepoint.net
by Coulomb Technologies
®
The body casing, front panel, mounting pole, and base plate are pre-assembled.
front panel
body casing
mounting pole
base plate
Step 1 - Check box for correct contents
Bollard Mount Assembly
The CT1001 ChargePoint® Networked Charging Station’s body assembly ships in a box containing:
Main body assembly (including body casing, front panel, mounting pole, and base plate)
Base plate template
Allen key
Installation instructions
2-2
Step 2 - Remove front panel
To remove the front panel:
Use the supplied allen key to
loosen the 2 screws that fasten the panel to the body.
Disconnect the ground wire.
Slide the front panel upwards to remove.
Installing a Bollard Mount
2-3
ChargePoint® Networked Charging Stations
Loosen the four set screws to remove the body casing.
Step 3 - Remove body casing
To remove the body casing:
Use the supplied allen key to loosen the 4 set screws (2 on each bracket).
Slide the body casing upwards to remove.
2-4
Loading...
+ 26 hidden pages