Chaffoteaux & Maury Calydra 80, Calydra 100 Installation And Operation Instruction Manual

COMBINATION BOILER

Calydra 80
Calydra 100
Heating and lnstantane~us
eater with TSS@ Fanned Flue system
Domestic Hot
Installation and Operating instructions
These instructions are suitable for the following boilers :
Calydra 80 Calydra 100

CUSTOMER CARE

chaffoteallx~
Chaffoteaux et Maury Ltd , as a leading manufacturer of domestic and commercial water heating appliances, as well as domestic unvented direct and indirect storage cylinders, is committed to providing high quality products and a first class after sales service. If it is necessary to contact an engineer, then telephone your local Chaffoteaux Service Centre. The number can be obtained from the leaflet enclosed with your appliance or by telephoning the Chaffoteaux Customer Services Department at Telford
Advice on installation or servicing can also
CUSTOMER SERVICES DEPARTMENT
Tel 01952 222288 Fax 01952 260915
GUARANTEE The manufacturer’s guarantee against faulty manufacture or materials for the cylinder and secondary heat exchanger is 5 years, from the date of purchase. For the boiler, electrical components, thermal controls and safety valves it Is for 12 months. from the date ot purchase. The guarantee will be rnvalrdated if the factory frtted DHW pressure relief valve is tampered with or removed The Manufacturer or Distributors cannot be held responsible for any damage howsoever caused and which is a consequence of the removal or tampering The guarantee may also be invaltdated if the appkance is not installed by a competent person in accordance with the recommendations made herein, current standards, regulations or in a manner not approved by the manufacturer, modified in any way, subjected to frost, misuse or neglect and that factory fitted parts have had unauthorised repairs or replacemenfs carned out Evidence of purchase and the date ot supply must be made available at the time of any claim. The guarantee is only vakd for appkances installed in the UK To asstst us In providing you with an efficient after sales service, please return the guarantee registration card enclosed with the cylinder without delay.
STATUTORY REQUIREMENTS The mstallatton of this appliance must be carried out by a CORGI Registered person or other competent person and in accordance with the requirements of the Gas
Safely (Installatron and Use) Regulations. In addrtion, the installahon must also comply with the current byelaws of Local Water Undertakings, Building Regulations, IEE Wiring Regulations, Local Authority
Building Standards (Scotland) Regulations and the Safety Document 635 The Electricity at work Regulation, It should also be carried out in accordance with current editions of the following British Standards Codes of practice: BS 6891, BS 5440 parts I and 2, BS 5449 part 1, BS 7593, BS 6798, BS 5546, BS 4814, BS 7074 part 1 and 2, BS 7671 and BG DM2 If there is a possibility of the incoming mains water pressure exceeding 7 bar then a suitable pressure limiting valve must be fitted.
Precautions During servicing, keep the dust generation to a minimum and avoid inhaling any dust and contact with the skin and eyes, Normal handling and use will not present any discomfort, although some people with a history of skin complaints may be susceptible to irntation. When disposing of the lining, ensure that it is securely wrapped and wash hands after contact
be contacting the Chaffoteaux Customer
Services Department
q
--iA
Page
CUSTOMER CARE.. ....................................................................
Guarantee.. ..................................................................................
Statutory Requirements.. ............................................................. 3
Contents.. .....................................................................................
INTRODUCTION.. ........................................................................
DESCRIPTION.. ...........................................................................
LOCATION OF COMPONENTS
SPECIFICATIONS.. ......................................................................
DIMENSIONS.. ............................................................................. 10
OPERATION ...............................................................................
DOMESTIC HOT WATER MODE CENTRAL HEATING MODE..
INSTALLATION .......................................................................... .15
PLANNING ..................................................................................
LOCATION .................................................................................
INSTALLING THE CALYDRA
INSTALLATION ...........................................................................
POSITIONING THE BOILER ON THE WALL.. CONNECTING THE BOILER TO THE SYSTEM.. FITTING THE HORIZONTAL
MAKING THE ELECTRICAL CONNECTIONS ........................... .18
PRE-COMMISSIONING.. ............................................................ .20
Electrical Adjustments ........................................................... .20
1. Room thermostat options..
2. Pump Speed Adjustment.. ................................................ .20
3. Burner operating modes
COMMISSIONING.. .....................................................................
DHW.. ....................................................................................
Central Heating .....................................................................
.................................................. 6
............................................... .12
..................................................... .I4
.................................................... .15
............................ 15
FLUE.. .......................................... .17
...................... .18
.12
.15
..15
.15
................................................ .20
:. ................................................. .20
.22 .22 .22
LIGHTING THE BOILER
3
POST COMMISSIONING..
3
HANDING OVER TO SYSTEM GUIDANCE..
4
FLUE ........................................................................................... .24
5
VENTILATION.. ........................................................................... .25
6
GAS SUPPLY.. ............................................................................
ELECTRICAL SUPPLY..
8
FLUSHING AND WATER TREATMENT
SYSTEM CONTROLS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
BY PASS AND PUMP EXPANSION VESSEL..
FILLING POINT.. .........................................................................
............................................................. .22
........................................................... 23
THE HOUSEHOLDER.. ............................ .23
................................................................ .24
............................................................. .25
................................................................. .27
............................................................... .28
...................................... 26
MAINTENANCE.. .........................................................................
USER’S INSTRUCTIONS
Control panel ...............................................................................
Isolating Taps ..............................................................................
SWITCHING ON.. ........................................................................ .30
Hot Water ....................................................................................
Heating and Hot Water.. ..............................................................
Heating Only.. To Turn Boiler Off Completely..
INSTRUCTIONS FOR SETTING THE BUILT IN CLOCK..
MECHANICAL TIMER.. ...............................................................
1. General Layout..
2. To Set the Time.. ..................................................................... .31
3. To Set the “On” and “Oft” Times.. ............................................ .31
4. To Select Function MODE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
..............................................................................
........................................................... .29
................................................... .30
......................................................................
Page
.25
.28
28
.29 .29
.30 .30 .30
........ .31
.31 .31
By combining their modern highly efficient low water content fanned TSS@‘Temperature Stabilised System”, Chaffoteaux et Maury have
This unique combination is able to provide the user with hot water immediately at the outlet of the appliance temperatures at both extremely low flow rates or when several taps are opened together.
The TSS@ is a 5 litres, independently controlled mini unvented storage cylinder, powered by a 3 kW coil. It works in conjunction with the Chaffoteaux et Maury low pressure instantaneous domestic hot water system.
The CALYDRA, as well as providing hot water, provides central heating. The boiler is designed for sealed systems only. A two speed circulating pump, diverter valve, expansion vessel as well as a pressure gauge and safety valve are included within the boiler.
The CALYDRA provides the advantages of mains pressure hot water water supply the CALYDRA does not need a separate feed cistern or vent pipe in the loft space.
The CALYDRA has been tested and approved by the WRc as meeting
boiler has been tested and approved to carry the
The The CALYDRA can be installed with
arrangements. Adapters, bends and other accessories are available on request. The boiler is packed in TWO cartons:
1. The boiler.
2. The flue assembly and fixing kit.
the standard horizontal flue, raised horizontal,
CE mark.
flue combination boiler concept created a whole new concept.
CALYDRA
to taps and showers. Supplied directly
with the requirements of the water by-laws scheme.
concentric
and the brand new
and
stable
from the main
vertical, twin pipe flue or seduct
Location of components
1. Flue hood with fan
2. Sealed chamber
3. Gas valve assembly
4. Electrical box
5. Pump
6. Automatic air separator and automatic vent
7. Multi-gas burner assembly comprising ignition and ionisation electrodes
8. Combustion chamber
9. Main heat exchanger
10. Steel chassis complete with expansion VE
11. Air pressure switch
12. Overheat thermostat
13. TSS @J (mini cylinder)
14. Central heating control thermistor
15. Three way valve
16. Expansion vessel connecting tube
17. By pass adjustment screw
18. By pass
19. CH Flow isolating valve
20. Domestic hot water outlet
21. Gas service tap
22. Water service tap
23. CH Return isolating valve
25. Pressure relief valve
27. DHW pressure relief valve
28. TSS@ control thermistor
Fig.1
29. Location of heating filter (not visible)
30. DHW circuit flow switch
31. Heating circuit flow switch
32. Hot water control thermistor
33. Secondary heat exchanger
34. Four position selector switch
35. User’s instruction panel.
36. Domestic hot water temperature adjustment
37. Heating flow temperature adjustment
38. Green indicator - Power ON
39. Orange indicator - Burner ON
40. Red indicator - Lock out / flame failure
41. Reset button
42. Mechanical clock
43. Pressure gauge
SPEClFlCATloNS
CALYDRA
Appliance category Heat input C/H
Maximum
Heat output C/H 81 DHW Maximum
C/H circuit pressures Min operating
Max operating
DHW specific flow rates for 10 min
Q 30 deg C rise
Q 35 cieg C rise
DHW circuit pressures Min operating
Max operating
Flow limiter rate Compartment ventilation
& DHW
80 100 CALYDRA 80 100
Cat ii 2H 3+ Cat ii 2H 3+ Natural gas G20
25.9 kW 31.1 kW Maximum 2.74 m31h 3.29 m3/h 88392 Btuh 106138 Btu4-1 97 ft3lh 116ft31h
23.25 kW 28.0 kW Nominal 20 mbar 20 mbar 79347 Bhuh 95558 lBu4-1 8inwg 8inwg
0.7 bar 0.7 bar Nominal 11 mbar 12.8 mbar 10 lb/in2 10 lb/in2 4.4 in wg 5.12 in wg
2.5 bar
36.3 lb/in2 36.3 lb/in2 Natural gas G20 1.23 mm 1.28 mm
11.5 Vmin 13.9 Vmin Z3 restrictor 6.7 mm no restrictor
2.54 gal/min 3.06 gai/min
9.86 Umin 11.91 Umin PROPANE LPG G31
2.17 gallmin 2.62 gailmin Gas rate
0.1 bar 0.1 bar
1.45 lb/in2 1.45 lb/in2 inlet pressure
7 bar 7 bar
100 lb/in2 100 lb/in2
8 Vmin 10 Vmin not required
2.5 bar
Gas rate
inlet pressure
Burner pressure
Burner injector and restrictor diameter
l/3 restrictor 2.60 mm 2.9 mm
Maximum
Nominal
Burner pressure Nominal
2.00 kg/h 2.42 kg/h
4.41 lb/l-u 5.34 Ib/hr
37 mbar
14.8 in wg
35 mbar 14 in wg
37 mbar
14.8 in wg
30.4 mbar
12.16 in wg
CALYDRA BUTANE LPG G30
Gas rate Maximum
inlet pressure Nominal
11.2 in wg Burner pressure
Nominal
Burner injector and restrictor diameter Butane LPG G30 l/3 restrictor 213 restrictor
80
2.04 kg/h
4.50 lb/h
28 mbar
11.2 in wg
26.7 mbar
10.7 in wg
0.7 mm
1.75 mm
4.9 mm
100
2.45 kg/h
5.40 lb/h
28 mbar
24 mbar
9.6 in wg
0.76 mm
2.0 mm
6.7 mm
CALYDRA Safety discharge -
Heating
Safety discharge - DHW
Expansion vessel Pre-charge pressure
Net capacity at 2.5 bar Adjustable by-pass
Minimum flow rate
Maximum flow rate
80 100
2.5 bar 2.5 bar
36.25 iblin2 36.25 lb/in2
7 bar 100 lb/in2
7 bar
100 lb/in2
0.7 bar 0.7 bar
9.4 lb/in2 9.4 lb/in2
5.44 itr 5.44 itr
150 i/h 150 i/h
0.55 gai/min 0.55 gai/min 480 i/h 480 iih
1.76 gai/min 1.76 gal lmin
Electrical characteristics SUPPlY
Consumption Protection Fuse no 1 Fuse no 2 External controls
23fiv5oi-k 23Ov5OHz 155w 155w IP 44 iP44 2A 2A
1.25A 1.25A 24V 24V
With packaging :
-Calydra 80 : Calydra 100 : 49.5 kg
Without packaging :
-Calydra 80 :
-Calydra 100 :
49.0 kg
46.5 kg
47.0 kg
Liit weight :
Weights
-Calydra 80 :
-Calydra 100 :
41.5 kg 41 .O kg
Tails diameter
J Heating flow
022mm K D.H.W. flow 015mm L Gas supply 022mm M Cold water inlet N Heating return
015mm
022mm P Safety valve outlet 015mm
Outer case dimensions :
-Width :
- Height :
- Depth : 380
1po
a,:
I : ‘. ji --
-
. -
--_
i-
All dimensions in mm
Fig. 4
440 (minimum space required 450) 850
Safety valve center line
66
Minimum clearances :
- Both sides
5mm
- Above casing 170 mm
- Below casing
200 mm
- Front ( for servicing) 500 mm
- Front (in operation) 5 mm
The Calydra 80 and 100 are suitable for the 3 flue types :
l
typeC12orC42
l
type C 22
l
typeC32xxorC32xy
TYPE C12, C42 or C22
.<,: :*.*.:
T
- y-m,.-+ -----_-___------­'%. xx
155
.Z.S.2.
. . .
-_- -A-
*
r+%
l
Fig. 5 Dimensions in mm
149
TYPE C32 xx
-
4
TYPE C32 xy
ini
Domestic Hot Water Mode To be able to supply hot water, the selector switch (34 fig.
6) must be in either on ,,? or ‘1111 ,i position. This will be confirmed by the green indicator light 0 (38 fig. 6).
The hot water temperature in the mini cylinder can be adjusted between 40°C and 60°C using control knob (36 fig 6).
When a tap or shower is turned on and the flow of mains water is above 2 litres per min., it will activate the DHW flow switch 30 fig 7 and allow the 3 way valve (15 fig. 7) to move to the DHW position. The pump can now circulate primary water heated by the main heat exchanger through the secondary heat exchanger.
The safety solenoid (3a fig. 7) and the first stage solenoid
(3b fig. 7) open together to allow gas to the burner. The ignition sequence begins and a continuous high speed
spark ignites the gas. As soon as a flame is detected the orange indicator bulb 0 (39 fig. 6) will light and the
second stage solenoid (3c fig. 7) opens to allow the full gas rate. If a flame is not detected, after 8 seconds, the safety solenoid and the first stage solenoids close and
shut off the gas. The red lockout indicator bulb 0 (40 fig.
6) will light. Over 2 Vmin, the domestic hot water temperature is
controlled by the hot water control thermistor (32 fig. 7)
and the heating control thermistor (14 fig. 7), but
dependant upon to the position of the DHW temperature adjustment knob (36 fig. 6). This system anticipates the changes of temperature in the secondary heat exchanger and ensures accurate temperature regulation.
When the tap is closed the burner is extinguished and the pump runs on for 10 seconds (unless the mini cylinder thermistor is calling for heat, in which case the burner will remain on at a low rate and the pump will continue running until the mini cylinder thermistor is satisfied). The boiler will now stay in the hot water mode for 30 seconds to be ready for a subsequent draw off (this can be set to 3 minutes if required. See Maintenance and Service Guide).
Priority is given to a demand for hot water. This will interrupt the central heating for the duration of hot water delivery or recovery of the mini cylinder.
When the boiler has been in standby in Hot Water Mode for some time or when drawing DHW at flow rates of less than 2 Vmin the temperature in the mini cylinder will eventually decrease and the
12
2 3c
3b 3a
TS@ control thermistor will call for heat. Bringing the pump and burners to operate, this is quite normal.
The 3 way valve (15 fig. 7) will move to the domestic hot water position. The hot water from the primary circuit is then diverted to heat the mini cylinder via the coil and the secondary heat exchanger.
The safety solenoid (3a fig. 7) and the first stage solenoid (3b fig. 7) open together to allow a low rate of gas to the burner.
7a
The ignition sequence begins and a continuous high speed
7b
spark ignites the gas. As soon as a flame is detected the orange indicator bulb ID (39 fig. 6) will light and the burner will remain
on low rate until the TSS@ control thermistor (28 fig. 7) is
10a
satisfied. If a flame is not detected, after 8 seconds, the security
4
and first stage solenoids close and shut off the gas.
32
The red lockout indicator bulb 9; (40 fig. 6) will light. The hot water flow temperature is controlled by the primary
circuit control thermistor (14 fig. 7). When the cylinder thermistor is satisfied, the burner is
extinguished and the pump remains running for 10 seconds at low speed.
The boiler will now stay in the hot water mode for 30 sec. (this can be set to 3 minutes if required. See Maintenance and Service Guide).
Priority is given to a demand for hot water or reheating the mini cylinder.
Central Heating Mode To be able to supply heating, the selector switch (34 fig. 6)
must be in ‘1111 $ (heating only position).This will be confirmed by the green indicator light 0 (38 fig. 6). When there is a demand for heating (either from a room thermostat, the built-in clock or an external programmer) and the boiler temperature control is calling for heat. The pump starts and at a flow rate of 4 Itr/min the central heating flow switch operates allowing the ignition sequence to begin. The safety solenoid (3a fig. 7) and the first stage solenoid (3b fig. 7) open together to allow gas to the burner. The ignition sequence begins and a continuous high speed spark ignites the gas.
As soon as a flame is detected the orange indicator bulb 0 (39 fig. 6) will light. After 45 seconds the second stage solenoid (3c fig. 7) opens to allow the full gas rate. If a flame is not detected, after 8 seconds, the security solenoid closes and shuts off the gas.
The red lockout indicator bulb 0 (40 fig. 6) will light. The central heating flow temperature is controlled by the heating control thermistor (14 fig. 7).
(heating and hot water position) or ‘fill
The boiler has been designed to minimise cycling and will not attempt to relight for at least 3 minutes after the heating control thermistor has been satisfied (this can be set to 30 seconds if required. See Maintenance and Service Guide). When the built-in clock, room thermostat and external programmer are satisfied, the burner will switch off and the pump will remain running for a further 3 minutes. (this can also be set to 30 seconds if required. See Maintenance and Service Guide).
NB It is possible to override the RESET button (41 fig. 6).
the 3 minute delay
pressing
by
Planning
chaffoteaux~
Please ensure that you are familiar with the installation requirements as well as the relevant British Standards and Statutory Regulations (see page 3) before commencing work.
Location
The CALYDRA can be installed on any suitable internal wall.
Provision must be made to allow the correct routing of the flue and siting of the terminal to allow the safe and efficient removal of the flue products. The appliance may be installed in any room, although reference must be made to the IEE regulations if it contains a bath or shower. A compartment or cupboard may be used provided that it has been purpose-built or modified for the purpose. It is not necessary to provide permanent ventilation for cooling purposes. Detailed recommendations are given in BS 5440 pt 2. If it is proposed that it is installed in a timber framed building then reference must be made to British Gas Document DM2, or advice sought from CORGI.
INSTALLING THE CALYDRA
Installation The installation kit included with the flue components comprise following items :
- Hanging bracket
- A paper template (showing the dimensions of the boiler with 5 mm side clearances and fitting instructions and on the reverse, the fixing positions for the spacer bracket)
- Connection tails
- Screws and wall plugs
- Connection washers
- Pre-piping jig
- Installation and Operation manual
Positioning the boiler on the wall. The paper template can be used to ensure the correct positioning of kitchen cabinets etc. The paper template is fixed to the wall and used to locate the position of the hanging bracket, the centre for the flue hole and, if required, the fixings for the pre-piping jig.
If there is a requirement to pass the piping behind the
boiler, it will be necessary to fit a spacing bracket. This is available as an optional accessory. The standard paper template shows the positions for the spacing bracket fixing screws.
q
a-u
Drill and plug the wall and secure the hanging bracket using
the screws provided (refer to the paper template drawings).
Remove the boiler from its packaging as shown in (fig. 8) and remove the outer case as shown in (fig. 9). Please note: If the pre-piping jig has been used it must be removed before attempting to hang the boiler. Place the boiler on the wall on the hanging bracket.
Connecting the boiler to the system
- Push in the tabs P (fig 10) on either side of the boiler and pivot the electrical box forward to gain access to the valve connections.
- Remove the yellow caps and connect the boiler to the taps using washers provided in the plastic bag.
3 x fibre washers for the C/H flow and return and hot water
outlet connections
1 x fibre washer and mesh filter “F” for the cold water inlet. 1 x rubber washer “R” for gas connection.
Using (fig. 10) for reference, connect the gas and water pipes to the valves located at the base of the appliance using the tails provided. There is a 190 mm space between the valves
and the wall to make these connections.
Provision must be made to fill and recharge the system
pressure. This can be achieved using a filling loop or other
methods approved by the local water authority.
Safetv Valves There are two pressure relief valves fitted to the CALYDRA. The DHW pressure relief valve connecting pipe is supplied attached to.the valve and the CH pressure relief valve tube is clear silicone and is packed with the boiler. They should terminate together below the boiler over a tundish or a 28 mm to 22 mm reducer (see P 17, fig 10) which should in turn discharge safely outside the premises. Care should be taken
f
Fig. 8
Fig. 9
.
q
chffoteaux~
,-AA
so that it does not terminate over an entrance or window or where a discharge of heated water could endanger occupants or passers by. The system should be carefully checked for leaks, as frequent refilling could cause premature system corrosion or unnecessary scaling of the heat exchanger.
Fig. 10
J Heating flow
D.H.W. flow
K L Gas supply
Cold wafer inlet
M N Heating return P Safety valve outlet
D.H.W. safety valve outlet 015mm
Q
022mm 015mm 022mm 015mm 022mm 015mm
Fitting the Horizontal Flue
The instructions for the installation of the elevated horizontal,
concentric vertical, biflux (twin pipe) and SE duct flue options are included with the relevant adapter kits. The horizontal standard flue supplied with the appliance is suitable for lengths from 300 mm minimum to 610 mm maximum. This means for rear flueing, the standard kit will accommodate a maximum wall thickness of 490 mm, and for side flueing a maximum wall thickness of 477 mm. This takes into account the minimum appliance side clearances of 5 mm. If the fixing is a rear exit flue, the template provides the position of the centre for drilling the flue hole with a core drill. If the flue is a side exit installation then calculate the position of the hole with a slope, away from the boiler, of 5 mm / metre to the terminal.
Making the Electrical Connections Push in the tabs (P fig. 11) on either side of the boiler and pivot the
electrical box forward to gain access to the electrical connections.
Undo the two retaining screws (A fig. 1 l), remove cover (B fig. 11) and remove cable clamp.
Connect the live and neutral wires to the multipin plug leaving sufficient earth wire to connect to the earthing point. (B fig. 12) Note: The connections should be made so that should the lead be pulled from its anchorage, the current carrying wires become taut before the earth wire.
If using a room thermostat or other external control, they can be connected in place of the link on the multipin plug. (fig. 12).C Note: Use only controls designed for voltage free switching or 24V supply. Do not connect to a 230V supply.
Connect multipin plug into the socket on the pcb (D fig. 12) attached to the cover (B fig. 11). Secure the cable using the cable clamp and replace the cover.
NB Any changes to the factory settings on the pcb can be made before replacing the electrical box cover (see electrical adjustments pages 20 and 21).
Fig. 11
Making the Electrical Connections (continued)
q
.
3 amp. Mains
Room
t
l
Thermostat
i
Pre-commissioning
Ensure that the system has been adequately flushed.
Purge gas supply of air and test for soundness.
Carry out final electrical tests to ensure the correct polarity and
earthing continuity.
Electrical Adjustments
There are three adjustments that can be made:
1. Room thermostat options
2. Pump speed
3. Burner operating modes :
1. Room thermostat options
To gain access to the setting switch (1 fig. 13) pivot forward the
electrical box cover and remove the cover (B fig. 11)
- move the switch to the left - (factory setting). When room thermostat is satisfied the burner switches off and the pump over
runs for 3 min.
- move switch to the right - When room thermostat is satisfied the burner switches off and the pump continues to run until the main selector is turned from a heating position.
2. Pump Speed Adjustment
- move switch to the left (marked GV) - pump on high speed (factory setting)
- move switch to the right (marked PV) - pump on low speed for use on small systems
3 min 3 min
TUR
Pmin
3. Burner operating modes : To gain access to the switches it is necessary to remove the facia: remove the main case pivot the electrical box forwards remove the pressure gauge clip noting its position replace elecrical box in its upright position remove the two screws and unclip the fascia from the electrical box remove the rubber grommet to gain access to the switches
PCB adjustments (fig. 14) : Four switches are gathered together on the regulation PCB
and labled SW4.
IL
Switch 1 TAC selects Central heating anticycling delay
either 3 min (factory setting) or 30 see
Switch 2 TIC selects delay switching from DHW to C/H
either 30 see (factory setting ) or 3 min
Switch 3 selects the modulation of the Burner.
NOR means normal modulation (off - l/3 - full on) factory setting
TUR means Full On or Off mode
Switch 4 selects Central heating power limitation
Pmax means the boiler could provide full power for heating - factory setting
Pmin means power for heating is limited to 113 only
When settings have been made replace the rubber grommet
and refit all components in
Fig. 14
the reverse order.
factory setting
/
DHW
l
Open the main cold feed valve.
l
Open all hot taps to purge DHW system.
l
Check for water soundness.
Central Heating
l
Open flow and return valves on the boiler.(l9 and 23
fig. 15)
l
Open the automatic air vent (6 fig. 16)
l
Fill system and vent radiators.
l
Set system pressure and remove filling loop.
l
Check for leaks.
l
Manually check pump is free to turn.
l
Switch on electrical supply.
l
Turn selector switch (34 fig. 16) to heating only or heating
and hot water position.
l
Allow pump to run for several minutes.
l
Isolate electrical supply.
l
Drain boiler and check water filter (29 fig. 2) for
installation debris.
l
Replace filter and recharge system.
Lighting the Boiler
l
Connect gas pressure gauge to test point ( 45 fig. 16).
l
Turn on the gas supply and boiler gas tap ( 21 fig. 15.
l
Ensure electrical supply is on.
l
Ensure all external controls and built clock are calling for
heat.
l
Turn selector switch ( 34 fig. 16) to heating only position.
1
4 Turn the heating flow temperature adjustment to maximum
(37 fig. 16).
l
The boiler will light.
l
Allow the boiler to heat system.
l
Check the inlet gas pressure (working pressure) while boiler
operating. (Refer to technical data).
l
Check the operation of the boiler controls and safety
devices.(see separate servicing leaflet for details)
Fig. 15
l
Set the by pass (Refer to system guidance).
l
Re-flush the system to remove any dissolved oils and fluxes.
l
Recharge system pressure and introduce any water
treatment as required.
K6
Fig. 16
Post Commissioning
l
Ensure system pressure has been set correctly.
l
Set DHW temperature adjustment knob to required position
l
Set heating flow temperature adjustment knob to required
temperature.
l
Set the built in clock or external programmer to
householder’s requirements.
l
Set external controls.
l
Switch boiler to domestic hot water position and draw off hot
water to allow TSS@ cylinder to heat up quickly.
Handing Over to the Householder
l
Demonstrate the lighting and operation of the boiler.
l
Demonstrate how to maintain the system pressure.
l
Demonstrate the operation and settin 8 of the built-in clock.
l
Explain that the reheating of the TSS cylinder may bring
the boiler on unexpectedly except in heating only position.
l
Explain the need for annual servicing and that it must be carried out by a competent person.
l
Fill out and register guarantee.
l
Leave users instructions, installation manual and all other
documentation with the householder.
Flue The boiler must be installed so that the flue terminal is
exposed to the free passage of external air at all times. It must not be allowed to discharge into another room or space such as an outhouse or closed lean-to. The minimum acceptable clearances are shown below:
- A Directly below an opening, window, etc . . . . . . . . . . 300 mm
- B Below gutters soils pipes or drain pipes . . . . . . . . . . . . . 75 mm
- C Below eaves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
- D Below balconies or car port roof . . . . . . . . . . . . . . . . . . . . . . 200 mm
- E From a vertical drain pipe or soil pipe . . . . . . . . . . . . . . . . 75 mm
- F From an internal or external corner . . . . . . . . . . . . . . . . . . 300 mm
- G Above ground roof or balcony level . . . . . . . . . . . . . . . . 300 mm
- H From a surface facing the terminal . . . . . . . . . . . . . . . . . 600 mm
- I From another terminal facing the terminal....... 1200 mm
- J From an opening into the dwelling when
under a car port . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1200 mm
- K Vertically from a terminal on the same wall
- L Horizontally from a terminal on the same wall 300 mm
- M fixed by the flat roof ubbink rolux 4GM flue terminal
- N fixed by a pithed roof ubbink rolux 4GM flue terminal
200mm
1500 mm
Fig. 17
Ventilation The room in which the boiler is installed does not require specific ventilation. IF IT IS INSTALLED IN A CUPBOARD OR COMPARTMENT PERMANENT VENTILATION IS NOT
REQUIRED FOR COOLING PURPOSES. If vents are installed, they must communicate with the same room or be on the same wall to outside air.
Gas Supply The gas installation and soundness testing must be in accordance with the requirements of BS 6891 .The boiler requires a 22 mm supply, Ensure that the pipe size is adequate for the demand including other gas appliances on the same supply.
Electrical Supply
The appliance requires an earthed 230V - 50 Hz supply and
must be in accordance with current I.E.E. It must also be possible to be able to completely isolate the appliance electrically. Connection should be via a 3 amp fused double­pole isolating switch with contact separation of at least 3 mm on both poles. Alternatively, a fused 3 Amp. 3 pin plug and unswitched socket may be used, provided it is not used in a room containing a bath or shower. It should only supply the appliance.
System Pressure The boiler is suitable for sealed systems only. The maximum working pressure for the appliance is 3 bar. All fittings and pipework connected to the appliance should be of the same standard.
Flushing and Water Treatment The performance of the appliance could be impaired by system debris or the effects of corrosion. The system must be flushed thoroughly to remove metal filings, solder, machining oils and other fluxes and greases before connecting the boiler. An appropriate flushing and descaling agent should be used, particularly if it is an existing system. Refer to BS 7593 (1992) for guidance. For more information on the use of corrosion inhibitors, flushing and descaling agents, advice can be sought from the manufacturers of water treatment products such as:
Betz Dearbon Ltd Foundry Lane Widnes Cheshire WA8 8UD Tel: 0151 424 5351
Fernox Manufacturing Britannica Works Clavering Essex CBll 4QZ Tel: 01799 550811
System Controls The boiler is electrically controlled and is suitable for most modern electronic time and temperature external controls. The addition of such controls can be beneficial to the efficient operation of the system. The boiler connections for external controls are 24V and so only controls of 24V or that have voltage free contacts should be used. They must not be connected to 230 V supply.
Fig. 18
chaffoteaux~
Cut
of
screw head
by pass shut (factory setting)
detail of setting :
on - :
Cut of screw head on + : by pass open
By pass and Pump The boiler is fitted with a pre-adjusted by pass. Although adjustment is not normally necessary, the by pass can be reset by turning screw (17 fig. 18) clockwise to open the by­pass using the chart below for guidance. It is a l/4 turn from fully closed to fully open.
If used on a system with thermostatic radiator valves, the flow rate, through the system, with the thermostatic valves closed should be at least 100 I/hr. The chart below indicates the residual head of the pump
available for the system.
and flow rate available
mH2
5 4 3 2
1 0
Head
100 100 300
600 700 BOO
500
400
900 1000 h
Fig. 19
“GV - bp -I’ means : Pump in high speed and by-pass closed “GV - bp +” means : Pump in high speed and by-pass open
“PV - bp -” means : Pump in low speed and by-pass closed
“PV - bp +” means : Pump in low speed and by-pass open
DCbt
q
-=-AA
Expansion Vessel The expansion vessel is pre-charged to 0.7 bar (10 Iblin2). The vessel is suitable for systems up to 145 litres capacity.
For systems of greater capacity an additional expansion
vessel will be required. Refer to the chart below and BS 7074
pt 1 or BS 5449.
Pressure ’
2,o 13 128
1.7
1-6
1,5 l-4 I,3
12
I,1
1.0 0,9 0,8 0,7
System capacity chart
Litres
Filling Point Provision must be made to be able to charge the system on commissioning and to make up any subsequent pressure loss. The method of connection must utilise approved equipment and must comply with the water regulations. A filling loop can be so installed as to be hidden beneath the boiler.
Fig. 20
MAINTENANCE
In order to ensure that the CALYDRA continues to operate efficiently and safely, it is essential that it is maintained annually. Servicing and repairs should only be carried out by a competent engineer. Any part replaced should be genuine Chaffoteaux et Maury spare parts.
For details refer to the separate Maintenance and Servicing Instructions.
Control panel
34. Four position Selector switch ‘Ii11 = Central heating only ( TSS@ not operational )
l
= Switched OFF
F
= Hot water only ( including TSS@ )
9111
= Hot water ( including TSS@ ) + Central heating
z
35. User’s instruction panel.
Domestic hot water temperature adjustment
36. &=
37. ‘Ill1
Heating flow temperature adjustment
38. 0 Green indicator - Power ON
39. P Orange indicator - Burner ON
40. 0 Red indicator - Lock out I flame failure
41. “RESET” Reset button
42. Mechanical clock
43.0 Pressure gauge Isolating Taps
19. CH Flow isolating valve
21. Gas service tap
22. Water service tap
23. CH Return isolating valve
Fig. 22 35
/
lb
Fig. 23
iv \
/ I
21 22
23
\
Switching on
1) Check that the gas service tap is opened at the gasmeter and main power is on.
2) Check that pressure in central heating system is above 0.7 bar and below 2.5 bar with the pressure gauge 0 (43 fig.
23).
3) Open the gas tap (21 fig. 23) by turning from right to left.
4) The boiler is now ready to use. Hot Water
1) Turn selector switch (34 fig. 22) to position fi . The green “power on” indicator 0 will light.
2) Turn on a hot water tap, the orange “burner on” indicator & will light and the water will become hot.
Heating and Hot Water
1) Turn selector switch (34 fig. 22) to position
green “power on” indicator 0 will light.
3) If the room thermostat (if fitted), the heating control ‘III1
and the clock (if fitted) are all calling for heat, the orange “burner on” indicator 8 will light and the heating will be on. When there is a need for hot water while the heating is on, it is only necessary to turn on a hot tap. The heating will be
fl ‘1111.
The
interrupted momentarily while the hot water is being delivered. The boiler will switch back automatically to heating when the tap is turned off. The TSS@ feature may cause the boiler to light unexpectedly to maintain the temperature of the stored water. This is quite normal.
Heating only
1) If heating is required without the need for TSS@ hot water storage, turn the selector switch (34 fig. 22) to position For example, this feature would be used if the house is to remain heated without anyone using the hot water. Note: If the boiler has been turned off for some time the first attempt to light it may result in a lockout 9 . If this happens press the reset button (41 fig. 22) and the boiler will light.
To Turn Boiler Off Completely
1) Turn the selector switch (34 fig. 22) to the off position 0.
2) Turn the gas tap (21 fig. 23) from left to right “STOP”.
‘1111.
MECHANICAL PROGRAMER
1. General layout
The mechanical clock covers a 24 hour period. Each tappet
represents 20 minutes (A fig. 25). An override switch is located on the right hand side of the clock (B fig 25).
2. To set the time To set the time of day, grasp the outer edge of the dial and turn slowly clockwise until the correct time is lined up with the arrow (C fig. 25).
3. To Set the “On” and “Off” times The clock uses a 24hours system. e.g. 8 =8.00 am and
18 = 6.00 pm. “ON” periods are set by sliding all tappets between the “ON” time and the “OFF” time to the outer edge of the dial.The tappets remaining at the centre of the dial are the “OFF” periods.
4. To select function mode Put the selector switch (6) to symbol 0 to control the boiler
by the clock. Put the switch (B) to “1” to select permanent operation or to “0” to turn heating off permanently.
Fig. 24
B
Fig. 25
-----a
u
Chaffoteaux et Maury are continuously improving their products and therefore reserve the right to change specifications without prior notice and accepts no liability for any errors or omission in the information contained in this document.
Q Chaffoteaux et Maury 1998
Chaffoteaux et Maury Ltd Trench Lock Trench Telford Shropshire TFl4SZ
Tel: 01952 222727
Fax: 01952 243493
ESP 040 January 1999
Loading...