C.E. Niehoff & Co. N2013 Installation

N2013 Battery Isolator
Installation Instructions
This symbol is used to indicate the
DANGER
presence of hazards that will cause severe personal injury, death or equipment damage.
This symbol is used to indicate the
WARNING
presence of hazards that can cause severe personal injury, death or equipment damage.
This symbol is used to indicate the
CAUTION
presence of hazards that can cause minor personal injury or equipment damage.
Disconnect alternator, batteries, and
WARNING
any other auxillary equipment before removing cables. Failure to do so can result in severe personal injury.
1. Install N2013 in location specified by vehicle manufacturer, using mounting hardware and torque specified by vehicle manufacturer.
Do not exceed recommended torque. Component damage will result.
2. Connect number of cables and cable placement as
Do not exceed recommended
torque. Component damage will result.
Typically, no more than two cables per terminal are recommended for the power carrying capacity of the terminal.
Support cables as specifi ed by vehicle manufacturer. Failure to do
so can cause component damage.
3. Test components to make sure they operate
DANGER
specified by vehicle manufacturer. See Figure 1 for reference. Use proper stacking order as specified by vehicle manufacturer. Tighten to specifications shown in Figure 2 on page 2.
DANGER
CAUTION
CAUTION
properly.
See Vehicle Manufacturer
Specifi cations for
Cable Identifi cation
at This Location
M10 hardware
(2 places) –
torque to
15 Nm/11 lb.ft.
T
T
Alternator
T
Figure 1 - Cable Locations
See Vehicle Manufacturer
Specifi cations for
Cable Identifi cation
at This Location
T
Page 1 of 2
II0139A
DANGER
Do not exceed recommended torque. Component damage will result.
CAUTION
Typically, no more than two cables per terminal are recommended for the power carrying capacity of the terminal.
Customer cables to be located under fl at washer
M8x1.25x20mm Gnd Bolt –
torque to 15 Nm/11 lb. ft.
T
T
Lock washer
Flat washer
T
Figure 2 - Hardware Stacking Order and Torque (See Step 2 on Page 1)
M12x1.75 Stud (3 places)
Nut (3 places)–
torque to 30 Nm/22 lb. ft.
Lock washer (3 places)
Flat washer (3 places)
T
T
T
27mm/1.06 in. dia. brass boss
T
T
T
Figure 3 - Simple Wiring Schematic for Reference Only—See Vehicle Manufacturer Specifi cations
C. E. Niehoff & Co. • 2021 Lee Street • Evanston, IL 60202 Tech Services Hotline 800-643-4633
Page 2 of 2
II0139A
Loading...