ELECTRIC COUNTER TOP
CONVEYOR TOASTER
OPERATION MANUAL
CT-500 Shown
CECILWARE CORPORATION
43-05 20th AVENUE, LONG ISLAND CITY, NEW YORK 11105-1295 ■
718-932-1414 FAX 718-932-7860 www.cecilware.com
NN54A 5/05
TABLE OF CONTENTS
Introduction ................................................................................. page 2
Packaging .................................................................................... page 2
Installation ................................................................................... page 3-4
Operation ..................................................................................... page 4-5
Cleaning, Care and Maintenance ............................................... page 5
Safety ........................................................................................... page 5-6
Trouble shooting ......................................................................... page 6-7
Compliance .................................................................................. page 7
Electrical Diagram ....................................................................... page 7
Explosion View ............................................................................ page 8
Spare Part List ............................................................................. page 9
Specifications .............................................................................. page 10
Introduction
Congratulations on the purchase of your Cecilware Conveyor Toaster. Please take time to carefully read
through this manual to ensure the machine is operated and maintained properly. This will enable the best
possible performance from this product for many years.
Cecilware will not accept liability for the following if:
*The instructions in this manual have not been followed correctly.
*Non-authorized personnel have tampered with the machine.
*Non-original spare parts are used.
*The machine has not been handled and cleaned correctly.
Packaging
Cecilware prides itself on quality and service, ensuring that at the time of packing all products is supplied
fully functioning and free of damage.
Provided in this package are the following:
* Conveyor Toaster
* Crumb Tray
* Feeder Rack
* Return Chute
* Pass through Chute
* Feet (4)
* Manual
Should you find any damage that has occurred in transit, please contact your Cecilware dealer
immediately?
Installation
Back Crumb
Tray
Front Crumb
Tray
Back Toaster
Drawer
If open the back crumb Tray the food can be out
If close the back crumb Trat the food will be out from the front
crumb Tray
Close
If open the back crumb tray the food can be out from the
back toaster drawer. If close the back crumb tray the food
will be out from the front crumb tray
Remove the Cecilware Conveyor Toaster from the packaging. Be certain that all protective plastics and
residues are thoroughly cleaned from its surface.
Place the Cecilware Conveyor Toaster on a firm level surface.
Local standards and regulations should be consulted in order to abide by standards set in relation to
positioning, spacing, and ventilation.
Caution:
Do not position and operate near combustible materials/flammable objects. Once the Conveyor Toaster
has been placed in position, ensure the front and back stainless steel trays are positioned correctly.
Supply the appropriate power and connect to source. The Conveyor Toaster is now ready to turn on and
operate. (For power supply, please see technical specification sheet, page 10).
Your Conveyor Toaster can operate as a pass through operation or return operation. Please see diagrams
below and follow the instruction for the appropriate/required method.