the wall
BATH CABINET
hardware
Thank you for purchasing The Wall bath cabinet. This
page lists all the contents included in the box. Please take
the time to identify the hardware as well as the individual
components to this product. As you unpack and prepare
for assembly, place the contents on a carpeted or padded
area to protect them from damage.
Note: 2 people are recommended to safely assemble this product.
components
12 - dowels
3 - hinges
12 - bolts 8 - shelf
pins
Missing hardware?
Please call 800.606.6387 for
replacements.
18 - screws
mounting hardware
4 -plastic
anchors
4 -small
screws
4 -large
screws
4 -mounting
brackets
tools required
phillips head screwdriver
(We recommend the use of hand tools instead of power tools)
2 -wall
straps
1 - top panel
2 - side panels
(1 left, 1 right)
Made in Vietnam - r02 Page 1 of 4
Customer Service 800.606.6252 | Latest instructions available at www.cb2.com
1 - bottom panel 1 - fixed shelf
1 - door
1 - back panel
2 - adjustable
shelves
the wall
NOTE: Do not over
tighten the bolts.
BATH CABINET
fixed shelf
B
right side
panel
A
A
left side
panel
A. Insert 2 dowels into left side panel as shown.
B. Fit fixed shelf onto dowels, and attach to side
panel with 2 bolts. Secure, but do not over tighten
1
bolts with a phillips head screwdriver.
C
A. Insert 2 dowels into fixed shelf as shown.
B. Fit back panel into corresponding slot in left
side panel.
C. Fit right side panel onto dowels and back
2
panel, and attach to side panel with 2 bolts.
top
panel
B
back
panel
A
B
A
bottom
panel
A. Insert 4 dowels into side panels as shown.
B. Attach bottom panel to assembly and secure
3 4
with 4 bolts.
Made in Vietnam - r02 Page 2 of 4
Customer Service 800.606.6252 | Latest instructions available at www.cb2.com
B
A. Insert 4 dowels into side panels as shown.
B. Attach top panel to assembly and secure with
4 bolts.